Railway Track & Structures - November 2007 - (Page 21) a similar system of hook bolts with spring lock washers and locking nuts. On the second girder, however, locking clips were used as well (Figure 5a). This system has performed satisfactorily, accumulating nearly 500 mgt of HAL traffic with no maintenance required. The addition of locking clips has been particularly effective in this case. Another commonly used bridge deck fastening system consists of bridge deck bolts with spring clips to engauge the bottom of the flange (Figure 7a). Several sizes of spring clips are available, depending primarily on the thickness of the girder top flange. The HCP-25 model was recommended for the steel bridge at FAST with a flange thickness of about 2.5 inches. On one girder, this system was installed and tightened per the manufacturer’s recommendation. When properly installed, the spring clip remains in contact with the bottom of the flange at all times. The spring clip provides a toe load in the same fashion as does an elastic rail fastener on a rail base. Ears on the spring clip engage the ties to prevent rotation. After about 35 mgt, the nuts on about a third of the fasteners had come loose, and several of the spring clips rotated, requiring maintenance. Figure 7b shows a rotated spring clip. The top flange experienced some gouging caused by the spring clips. This resulted from longitudinal movement between deck ties and girder (Figures 7ac). Note that the top flanges of the FAST steel bridge are smooth. On spans with no protruding rivet heads in the top cover plate, the rivet heads become embedded in ties, and would likely prevent such movement in conjunction with this type of fastening system. On one girder, the HCP-25 spring clips were installed using double nuts and threaded fastener adhesive (Figure 7c). This system has performed satisfactorily, accumulating over 300 mgt of HAL traffic with no maintenance required. The comment regarding gouging also applies to this configuration. This test is ongoing with additional accumulated tonnage. When the original spring clip installation required maintenance, the hardware was realigned and tightened using threaded fastener adhesive. This single-nut installation in comparison with the double-nut installation will help distinguish the benefits provided by double www.rtands.com nuts and threaded fastener adhesive. This system has performed satisfactorily, accumulating nearly 300 mgt of HAL traffic with no maintenance required. The previous comment regarding gouging also applies to this fastener configuration. This test is ongoing with additional tonnage being accumulated. These tests are ongoing. An advisory group of railroad chief bridge engineers and AREMA bridge committee chaimen provides technical oversight. References 1. Sasaoka, Charity, David Davis, Duane Otter, and Brian Doe. July 2002. “Evaluation of Specialized Rail Joints for Moveable Bridges under HAL Traffic.” Technology Digest TD-02-016. Association of American Railroads, Transportation Technology Center, Inc., Pueblo, Colo. 2. Sasaoka, Charity, David Davis, Duane Otter, and Brian Doe. September 2003. “Testing Rail Joints for Moveable Bridges.” Railway Track & Structures. pp. 21-25. Railway Track & Structures November 2007 21 http://www.rtands.com
Table of Contents Feed for the Digital Edition of Railway Track & Structures - November 2007 Railway Track & Structures - November 2007 Contents On Track Industry Today Supplier News AREMA News NRC News TTCI R&D Seattle Retrofits Downtown Transit Tunnel Switch Stand, Switch Machines Planning M/W with Modern, High-Tech Tools Products & Literature People Calendar Advertisers Index Sales Representatives Website Directory Professional Directory Classified Advertising Chicago Perspective Railway Track & Structures - November 2007 Railway Track & Structures - November 2007 - Railway Track & Structures - November 2007 (Page Cover1) Railway Track & Structures - November 2007 - Railway Track & Structures - November 2007 (Page Cover2) Railway Track & Structures - November 2007 - Contents (Page 1) Railway Track & Structures - November 2007 - Contents (Page 2) Railway Track & Structures - November 2007 - On Track (Page 3) Railway Track & Structures - November 2007 - On Track (Page 4) Railway Track & Structures - November 2007 - Industry Today (Page 5) Railway Track & Structures - November 2007 - Supplier News (Page 6) Railway Track & Structures - November 2007 - Supplier News (Page 7) Railway Track & Structures - November 2007 - Supplier News (Page 8) Railway Track & Structures - November 2007 - AREMA News (Page 9) Railway Track & Structures - November 2007 - AREMA News (Page 10) Railway Track & Structures - November 2007 - AREMA News (Page 11) Railway Track & Structures - November 2007 - AREMA News (Page 12) Railway Track & Structures - November 2007 - AREMA News (Page 13) Railway Track & Structures - November 2007 - AREMA News (Page 14) Railway Track & Structures - November 2007 - NRC News (Page 15) Railway Track & Structures - November 2007 - NRC News (Page 16) Railway Track & Structures - November 2007 - NRC News (Page 17) Railway Track & Structures - November 2007 - NRC News (Page 18) Railway Track & Structures - November 2007 - TTCI R&D (Page 19) Railway Track & Structures - November 2007 - TTCI R&D (Page 20) Railway Track & Structures - November 2007 - TTCI R&D (Page 21) Railway Track & Structures - November 2007 - TTCI R&D (Page 22) Railway Track & Structures - November 2007 - TTCI R&D (Page 23) Railway Track & Structures - November 2007 - Seattle Retrofits Downtown Transit Tunnel (Page 24) Railway Track & Structures - November 2007 - Seattle Retrofits Downtown Transit Tunnel (Page 25) Railway Track & Structures - November 2007 - Seattle Retrofits Downtown Transit Tunnel (Page 26) Railway Track & Structures - November 2007 - Switch Stand, Switch Machines (Page 27) Railway Track & Structures - November 2007 - Switch Stand, Switch Machines (Page 28) Railway Track & Structures - November 2007 - Switch Stand, Switch Machines (Page 29) Railway Track & Structures - November 2007 - Switch Stand, Switch Machines (Page 30) Railway Track & Structures - November 2007 - Planning M/W with Modern, High-Tech Tools (Page 31) Railway Track & Structures - November 2007 - Planning M/W with Modern, High-Tech Tools (Page 32) Railway Track & Structures - November 2007 - Planning M/W with Modern, High-Tech Tools (Page 33) Railway Track & Structures - November 2007 - Planning M/W with Modern, High-Tech Tools (Page 34) Railway Track & Structures - November 2007 - Products & Literature (Page 35) Railway Track & Structures - November 2007 - People (Page 36) Railway Track & Structures - November 2007 - Calendar (Page 37) Railway Track & Structures - November 2007 - Sales Representatives (Page 38) Railway Track & Structures - November 2007 - Website Directory (Page 39) Railway Track & Structures - November 2007 - Professional Directory (Page 40) Railway Track & Structures - November 2007 - Classified Advertising (Page 41) Railway Track & Structures - November 2007 - Classified Advertising (Page 42) Railway Track & Structures - November 2007 - Classified Advertising (Page 43) Railway Track & Structures - November 2007 - Chicago Perspective (Page 44) Railway Track & Structures - November 2007 - Chicago Perspective (Page Cover3) Railway Track & Structures - November 2007 - Chicago Perspective (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.