Design Solutions - Spring 2008 - (Page 45) The master bath is spacious and airy, topped with an elegant crown moulding. A True TeAm “Zepsa was great in providing samples of details and finishes for this project,” Pheasant continues. “It helped in clarifying ideas between designer and manufacturer but also in helping the client understand the direction and the quality of the work provided early in the project.” The woodwork project’s value exceeded $2 million, and the duration of the project was less than 14 months. “We produced nearly 400 pages of shop drawings,” says Ballenger. “To achieve this, we drew from all of our operations and management experience to maximize efficiency in all departments. However, Zepsa Spring 2008 I DESIGN SOLUTIONS 45 Private Residence
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.