Compressed Air Best Practices - March 2009 - (Page 20) ® | 03/09 Focus Industry ENERGY MANAGEMENT | AIR STANDARDS Is the standard going to be based on any existing standards? Will companies who already implement ISO 9001 or ISO 14001 be able to easily implement this new standard? Rob Steele: PC 242 has already taken the key decision to base the standard on the common elements found in all of ISO’s management system standards. This will ensure maximum compatibility with key standards such as ISO 9001 and ISO 14001. It is anticipated that the standard will be based on the same management system principles such as continual improvement, and use the Plan-Do-Check-Act cycle employed in these standards. “ISO 50001 is expected to similarly achieve major, long-term increases in energy efficiency — 20 % or more in industrial facilities.” — Rob Steele, ISO Secretary-General How does ISO see the importance of ISO 50001 in relationship to other ISO standards? Rob Steele: The vast majority of ISO standards are specific to a product, service, material, process, technology or practice. In combination with these, standards like ISO 9001 and ISO 14001 provide a systematic, holistic framework for managing the organizational processes related to these products and services in order to address challenges faced by any organization, regardless of its activity, such as quality and environmental management. ISO has identified energy management as one of the top five fields meriting the development and promotion of International Standards. Effective energy management is a priority focus because of the significant potential to save energy and reduce greenhouse gas (GHG) emissions worldwide. Existing ISO standards for quality management systems and environmental management systems have successfully stimulated substantial, continual efficiency improvements within organizations around the globe. ISO 50001 is expected to similarly achieve major, long-term increases in energy efficiency — 20 % or more in industrial facilities. I would like to thank Rob Steele for taking time out of what has to be a very busy schedule to comment on ISO 50001. If you would like more information about this standard, you can contact: ISO Central Secretariat, Trevor Vyze, vyze@iso.org ISO/PC 242 Secretary, Jason Knopes of ANSI, JKnopes@ansi.org Co-Secretary Felipe Viera of ABNT, Felipe.Vieira@abnt.org.br For more information, please contact Wayne Perry at email: wayne.perry@kaeser.com or visit www.kaeser.com 20 www.airbestpractices.com http://www.kaeser.com http://www.airbestpractices.com
Table of Contents Feed for the Digital Edition of Compressed Air Best Practices - March 2009 Compressed Air Best Practices - March 2009 Contents From the Editor Utility-Air News Compressed Air Audit of the Month Air Standards Assessment Improves Electroplater Production and Saves Energy Demand-Side System Optimization Seven Sustainability Projects for Industrial Energy Savings Personal Productivity Resources for Energy Engineers Wall Street Watch Advertiser Index Classifieds Compressed Air Best Practices - March 2009 Compressed Air Best Practices - March 2009 - Compressed Air Best Practices - March 2009 (Page Cover1) Compressed Air Best Practices - March 2009 - Compressed Air Best Practices - March 2009 (Page Cover2) Compressed Air Best Practices - March 2009 - Compressed Air Best Practices - March 2009 (Page 3) Compressed Air Best Practices - March 2009 - Contents (Page 4) Compressed Air Best Practices - March 2009 - Contents (Page 5) Compressed Air Best Practices - March 2009 - From the Editor (Page 6) Compressed Air Best Practices - March 2009 - Utility-Air News (Page 7) Compressed Air Best Practices - March 2009 - Utility-Air News (Page 8) Compressed Air Best Practices - March 2009 - Utility-Air News (Page 9) Compressed Air Best Practices - March 2009 - Compressed Air Audit of the Month (Page 10) Compressed Air Best Practices - March 2009 - Compressed Air Audit of the Month (Page 11) Compressed Air Best Practices - March 2009 - Compressed Air Audit of the Month (Page 12) Compressed Air Best Practices - March 2009 - Compressed Air Audit of the Month (Page 13) Compressed Air Best Practices - March 2009 - Compressed Air Audit of the Month (Page 14) Compressed Air Best Practices - March 2009 - Compressed Air Audit of the Month (Page 15) Compressed Air Best Practices - March 2009 - Compressed Air Audit of the Month (Page 16) Compressed Air Best Practices - March 2009 - Air Standards (Page 17) Compressed Air Best Practices - March 2009 - Air Standards (Page 18) Compressed Air Best Practices - March 2009 - Air Standards (Page 19) Compressed Air Best Practices - March 2009 - Air Standards (Page 20) Compressed Air Best Practices - March 2009 - Assessment Improves Electroplater Production and Saves Energy (Page 21) Compressed Air Best Practices - March 2009 - Assessment Improves Electroplater Production and Saves Energy (Page 22) Compressed Air Best Practices - March 2009 - Assessment Improves Electroplater Production and Saves Energy (Page 23) Compressed Air Best Practices - March 2009 - Demand-Side System Optimization (Page 24) Compressed Air Best Practices - March 2009 - Demand-Side System Optimization (Page 25) Compressed Air Best Practices - March 2009 - Demand-Side System Optimization (Page 26) Compressed Air Best Practices - March 2009 - Demand-Side System Optimization (Page 27) Compressed Air Best Practices - March 2009 - Seven Sustainability Projects for Industrial Energy Savings (Page 28) Compressed Air Best Practices - March 2009 - Seven Sustainability Projects for Industrial Energy Savings (Page 29) Compressed Air Best Practices - March 2009 - Seven Sustainability Projects for Industrial Energy Savings (Page 30) Compressed Air Best Practices - March 2009 - Seven Sustainability Projects for Industrial Energy Savings (Page 31) Compressed Air Best Practices - March 2009 - Seven Sustainability Projects for Industrial Energy Savings (Page 32) Compressed Air Best Practices - March 2009 - Seven Sustainability Projects for Industrial Energy Savings (Page 33) Compressed Air Best Practices - March 2009 - Seven Sustainability Projects for Industrial Energy Savings (Page 34) Compressed Air Best Practices - March 2009 - Seven Sustainability Projects for Industrial Energy Savings (Page 35) Compressed Air Best Practices - March 2009 - Seven Sustainability Projects for Industrial Energy Savings (Page 36) Compressed Air Best Practices - March 2009 - Seven Sustainability Projects for Industrial Energy Savings (Page 37) Compressed Air Best Practices - March 2009 - Seven Sustainability Projects for Industrial Energy Savings (Page 38) Compressed Air Best Practices - March 2009 - Seven Sustainability Projects for Industrial Energy Savings (Page 39) Compressed Air Best Practices - March 2009 - Personal Productivity (Page 40) Compressed Air Best Practices - March 2009 - Personal Productivity (Page 41) Compressed Air Best Practices - March 2009 - Personal Productivity (Page 42) Compressed Air Best Practices - March 2009 - Resources for Energy Engineers (Page 43) Compressed Air Best Practices - March 2009 - Resources for Energy Engineers (Page 44) Compressed Air Best Practices - March 2009 - Resources for Energy Engineers (Page 45) Compressed Air Best Practices - March 2009 - Wall Street Watch (Page 46) Compressed Air Best Practices - March 2009 - Wall Street Watch (Page 47) Compressed Air Best Practices - March 2009 - Wall Street Watch (Page 48) Compressed Air Best Practices - March 2009 - Advertiser Index (Page 49) Compressed Air Best Practices - March 2009 - Classifieds (Page 50) Compressed Air Best Practices - March 2009 - Classifieds (Page Cover3) Compressed Air Best Practices - March 2009 - Classifieds (Page Cover4)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.