Best Practice Guide for Office Buildings - (Page 30) OFFICE Office BUILDINGS OF-OP1.0 Open Office: time scheduling • daylighting (single zone) Control Needs Manual on and scheduled off during business hours of all lighting including wallwash luminaires Code-compliant override for after hours; manual on with automatic shut off Continuously dim luminaires adjacent to windows based on daylight Solution Dataline switches and time clock in Lighting Integrator (LI) lighting control panel Low voltage switches to control zones, permitting two hour timed overrides Closed loop daylighting photosensor (LS-301) Isolated relays in Universal Switch Module Application Description Space use: Open office activities including administration, clerical, filing, copy areas, finance, engineering, sales Dimensions: Based on 30’ bays, irregular shape; approx. 16,500 sq ft Ceiling height: 10’ Cubicle dimensions: 8’ x 8’ x 5’ Windows: View windows along north and south facades with horizontal blinds provided Open Integrated control of HVAC via “occupied” status Emergency lighting controlled with general lighting; automatic on during power outage Occupancy-based control of workstation plug loads Lighting Emergency Lighting Control Unit (ELCU) to switch loads (manual on and scheduled off) when normal power is available Isolé power strip with personal sensor (see OF-CU1.0.) Pendant mounted indirect/direct luminaires using two T8 lamps and two-lamp 277-volt electronic, program start ballasts. 0-10 VDC electronic dimming ballasts are used in luminaires in the daylit zone. Compact fluorescent wallwashers highlighting the north and south interior walls, using 42-watt triple tube lamps and 277-volt electronic ballasts. Open Office Lighting Plan DAYLIT ZONE 2 ZONE D ZONE E ZONE F ZONE I S 01 S 02 S 03 ZONE I S S 07 08 ZONE G ZONE H S S 01 01 ZONE J S 06 S S 05 04 ZONE J LP-2-3, R1 ZONE A ZONE B ZONE C DAYLIT ZONE 1 LEGEND Indirect/direct Luminaire S Low Voltage Wall Switch Office Cubicles Design Solution Description Lighting in the open office is manually turned on using the Dataline switches, and scheduled off using a time clock located in a Lighting Integrator lighting control panel. All pendant lights are controlled on the same channel and remain on during the day. Lighting status signals are sent to the HVAC/BAS system using isolated relays in the Universal Switch Module. Code Compliance Guide (Bold = Compliant) ASHRAE 1999 2001 IECC Title 24 2004 2003 2004S 2006 2005 30 Watt Stopper/Legrand OF-OP1.0 0908
Table of Contents Feed for the Digital Edition of Best Practice Guide for Office Buildings Best Practice Guide for Office Buildings Contents Lighting Control Best Practice Guide for Office Buildings Value of Lighting Control for Office Buildings Office Building Space Usage Influential Factors for Lighting Control Office Building Lighting Control Design Guidelines Office Building Best Practice Guide Roadmap Summary of Best Practices for Lighting Control in Office Buildings Buildings Conference Rooms Cubicles Hallways Kitchens Open Offices Private Offices Restrooms Stairwells Storage Closets Exterior Lighting Summary of Energy Codes Best Practice Guide for Office Buildings Best Practice Guide for Office Buildings - Best Practice Guide for Office Buildings (Page 1) Best Practice Guide for Office Buildings - Contents (Page 2) Best Practice Guide for Office Buildings - Lighting Control Best Practice Guide for Office Buildings (Page 3) Best Practice Guide for Office Buildings - Office Building Space Usage (Page 4) Best Practice Guide for Office Buildings - Influential Factors for Lighting Control (Page 5) Best Practice Guide for Office Buildings - Office Building Lighting Control Design Guidelines (Page 6) Best Practice Guide for Office Buildings - Office Building Lighting Control Design Guidelines (Page 7) Best Practice Guide for Office Buildings - Office Building Best Practice Guide Roadmap (Page 8) Best Practice Guide for Office Buildings - Summary of Best Practices for Lighting Control in Office Buildings (Page 9) Best Practice Guide for Office Buildings - Buildings (Page 10) Best Practice Guide for Office Buildings - Buildings (Page 11) Best Practice Guide for Office Buildings - Buildings (Page 12) Best Practice Guide for Office Buildings - Buildings (Page 13) Best Practice Guide for Office Buildings - Conference Rooms (Page 14) Best Practice Guide for Office Buildings - Conference Rooms (Page 15) Best Practice Guide for Office Buildings - Conference Rooms (Page 16) Best Practice Guide for Office Buildings - Conference Rooms (Page 17) Best Practice Guide for Office Buildings - Conference Rooms (Page 18) Best Practice Guide for Office Buildings - Conference Rooms (Page 19) Best Practice Guide for Office Buildings - Cubicles (Page 20) Best Practice Guide for Office Buildings - Cubicles (Page 21) Best Practice Guide for Office Buildings - Hallways (Page 22) Best Practice Guide for Office Buildings - Hallways (Page 23) Best Practice Guide for Office Buildings - Hallways (Page 24) Best Practice Guide for Office Buildings - Hallways (Page 25) Best Practice Guide for Office Buildings - Hallways (Page 26) Best Practice Guide for Office Buildings - Hallways (Page 27) Best Practice Guide for Office Buildings - Kitchens (Page 28) Best Practice Guide for Office Buildings - Kitchens (Page 29) Best Practice Guide for Office Buildings - Open Offices (Page 30) Best Practice Guide for Office Buildings - Open Offices (Page 31) Best Practice Guide for Office Buildings - Open Offices (Page 32) Best Practice Guide for Office Buildings - Open Offices (Page 33) Best Practice Guide for Office Buildings - Open Offices (Page 34) Best Practice Guide for Office Buildings - Open Offices (Page 35) Best Practice Guide for Office Buildings - Open Offices (Page 36) Best Practice Guide for Office Buildings - Open Offices (Page 37) Best Practice Guide for Office Buildings - Open Offices (Page 38) Best Practice Guide for Office Buildings - Open Offices (Page 39) Best Practice Guide for Office Buildings - Open Offices (Page 40) Best Practice Guide for Office Buildings - Open Offices (Page 41) Best Practice Guide for Office Buildings - Open Offices (Page 42) Best Practice Guide for Office Buildings - Open Offices (Page 43) Best Practice Guide for Office Buildings - Open Offices (Page 44) Best Practice Guide for Office Buildings - Open Offices (Page 45) Best Practice Guide for Office Buildings - Open Offices (Page 46) Best Practice Guide for Office Buildings - Open Offices (Page 47) Best Practice Guide for Office Buildings - Open Offices (Page 48) Best Practice Guide for Office Buildings - Open Offices (Page 49) Best Practice Guide for Office Buildings - Open Offices (Page 50) Best Practice Guide for Office Buildings - Open Offices (Page 51) Best Practice Guide for Office Buildings - Private Offices (Page 52) Best Practice Guide for Office Buildings - Private Offices (Page 53) Best Practice Guide for Office Buildings - Private Offices (Page 54) Best Practice Guide for Office Buildings - Private Offices (Page 55) Best Practice Guide for Office Buildings - Private Offices (Page 56) Best Practice Guide for Office Buildings - Private Offices (Page 57) Best Practice Guide for Office Buildings - Private Offices (Page 58) Best Practice Guide for Office Buildings - Private Offices (Page 59) Best Practice Guide for Office Buildings - Private Offices (Page 60) Best Practice Guide for Office Buildings - Private Offices (Page 61) Best Practice Guide for Office Buildings - Restrooms (Page 62) Best Practice Guide for Office Buildings - Restrooms (Page 63) Best Practice Guide for Office Buildings - Restrooms (Page 64) Best Practice Guide for Office Buildings - Restrooms (Page 65) Best Practice Guide for Office Buildings - Stairwells (Page 66) Best Practice Guide for Office Buildings - Stairwells (Page 67) Best Practice Guide for Office Buildings - Stairwells (Page 68) Best Practice Guide for Office Buildings - Stairwells (Page 69) Best Practice Guide for Office Buildings - Storage Closets (Page 70) Best Practice Guide for Office Buildings - Storage Closets (Page 71) Best Practice Guide for Office Buildings - Exterior Lighting (Page 72) Best Practice Guide for Office Buildings - Exterior Lighting (Page 73) Best Practice Guide for Office Buildings - Exterior Lighting (Page 74) Best Practice Guide for Office Buildings - Exterior Lighting (Page 75) Best Practice Guide for Office Buildings - Summary of Energy Codes (Page 76) Best Practice Guide for Office Buildings - Summary of Energy Codes (Page 77) Best Practice Guide for Office Buildings - Summary of Energy Codes (Page 78)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.