Best Practice Guide for Office Buildings - (Page 47) OFFICE Installation Notes 1. 2. BUILDINGS Open 3. 4. Mount the ultrasonic sensor on a rigid, vibration-free surface. The UT-300 sensor is shipped with a fixed time delay of 20 minutes and sensitivity set to 50%. If SmartSet, a continuously adjusting time delay and sensitivity setting capability, is desired, or a different fixed time delay is preferred, refer to installation instructions for how to perform adjustments. Use a minimum of 22 gauge wire for low voltage wiring. See Technical Bulletin TB-124 on Voltage Loss at www. wattstopper.com. Confirm emergency lighting requirement with local code officials. Equipment Schedule Catalog No. UT-300-3 BD-100E-P BD-100M Office Qty 4 per zone 2 per bay 1 per building side 1 per bldg. side As needed 1 per control zone 1 per ELCU As needed 1 per cubicle Description Ultrasonic occupancy sensor, 2000 sq ft, 360° coverage Power pack, 120/230/277 VAC, 50/60 Hz, DIN rail mounting Power pack, 120/230/277 VAC, 50/60 Hz, DIN rail mounting L1S-4 Single button low voltage switch, almond finish LS-E12 ELCU-100 Enclosure for housing BD-100s Emergency Lighting Control Unit, DIN rail mounting Remote Test Switch Enclosure for housing ELCUs See OF-CU1.0. EMTS-100 LS-E8 IDP-3050 www.wattstopper.com • 800.879.8585 OF-OP2.0 0908 47 http://www.wattstopper.com http://www.wattstopper.com http://www.wattstopper.com
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.