Best Practice Guide for Office Buildings - (Page 55) OFFICE Installation Notes 1. 2. 3. BUILDINGS Private Office Mount DT-200 occupancy sensor at same height as luminaires so that sensor view is not blocked. Mount DT-200 in corner and aim at opposing corner to provide a full view of the room. DT-200 is shipped with a factory preset time delay of 18 minutes, the recommended minimum for private offices and with sensitivity setting at maximum. Refer to installation instructions if adjustments are necessary. 4. Use a minimum of 22 gauge wire for low voltage wiring. See Technical Bulletin TB-124 on Voltage Loss at www.wattstopper.com. 5. The DT-200 sensor’s isolated relay can provide status information to the BAS and/or control HVAC loads. 6. Mount the LS-301 dimming photosensor between six and 12 feet from the windows and at least four feet from pendant fixtures. 7. Use the LSR-301-S Setup Remote to set up the LS-301 photosensor. Follow the installation instructions for setting up the LS-301. Note that daytime and nighttime setup is required. 8. It is recommended that setup take place when conditions are optimal, such as on a clear sunny day when daylight is adequate. All furniture should be installed and final finishes be in place. 9. Mount the Isolé IDP-3050’s power strip under the desk. Mount the personal sensor under the binder bin. 10. Isolé IDP-3050’s personal sensor is shipped with a factory preset time delay of 30 minutes, the recommended setting. 11. Plug only the Isolé personal sensor into the power strip’s sensor input jack - otherwise, damage may result. 12. Plug task lighting, monitors, and other devices into the controlled outlets. Plug items to remain on all day (computer CPUs) into uncontrolled outlets. Equipment Schedule Catalog No. DT-200 BZ-150 LS-301 LSR-301-S LSR-301-P DCC2 DPP3 IDP-3050-A Qty 1 3 1 Description Dual technology occupancy sensor, isolated relay, wide angle lens Universal Voltage Power pack with manual/auto-on option,120/230/277 VAC, 50/60Hz LightSaver dimming photosensor, 0-10 VDC, 20-60 fc range 1 Setup Remote Control 1 Occupant Remote Control 3 Low Voltage Momentary Miro Decorator Switch with LED 1 Miro Decorator Wall Plate, 3-gang 1 www.wattstopper.com • 800.879.8585 OF-PO1.0 0908 55 http://www.wattstopper.com http://www.wattstopper.com
Table of Contents Feed for the Digital Edition of Best Practice Guide for Office Buildings Best Practice Guide for Office Buildings Contents Lighting Control Best Practice Guide for Office Buildings Value of Lighting Control for Office Buildings Office Building Space Usage Influential Factors for Lighting Control Office Building Lighting Control Design Guidelines Office Building Best Practice Guide Roadmap Summary of Best Practices for Lighting Control in Office Buildings Buildings Conference Rooms Cubicles Hallways Kitchens Open Offices Private Offices Restrooms Stairwells Storage Closets Exterior Lighting Summary of Energy Codes Best Practice Guide for Office Buildings Best Practice Guide for Office Buildings - Best Practice Guide for Office Buildings (Page 1) Best Practice Guide for Office Buildings - Contents (Page 2) Best Practice Guide for Office Buildings - Lighting Control Best Practice Guide for Office Buildings (Page 3) Best Practice Guide for Office Buildings - Office Building Space Usage (Page 4) Best Practice Guide for Office Buildings - Influential Factors for Lighting Control (Page 5) Best Practice Guide for Office Buildings - Office Building Lighting Control Design Guidelines (Page 6) Best Practice Guide for Office Buildings - Office Building Lighting Control Design Guidelines (Page 7) Best Practice Guide for Office Buildings - Office Building Best Practice Guide Roadmap (Page 8) Best Practice Guide for Office Buildings - Summary of Best Practices for Lighting Control in Office Buildings (Page 9) Best Practice Guide for Office Buildings - Buildings (Page 10) Best Practice Guide for Office Buildings - Buildings (Page 11) Best Practice Guide for Office Buildings - Buildings (Page 12) Best Practice Guide for Office Buildings - Buildings (Page 13) Best Practice Guide for Office Buildings - Conference Rooms (Page 14) Best Practice Guide for Office Buildings - Conference Rooms (Page 15) Best Practice Guide for Office Buildings - Conference Rooms (Page 16) Best Practice Guide for Office Buildings - Conference Rooms (Page 17) Best Practice Guide for Office Buildings - Conference Rooms (Page 18) Best Practice Guide for Office Buildings - Conference Rooms (Page 19) Best Practice Guide for Office Buildings - Cubicles (Page 20) Best Practice Guide for Office Buildings - Cubicles (Page 21) Best Practice Guide for Office Buildings - Hallways (Page 22) Best Practice Guide for Office Buildings - Hallways (Page 23) Best Practice Guide for Office Buildings - Hallways (Page 24) Best Practice Guide for Office Buildings - Hallways (Page 25) Best Practice Guide for Office Buildings - Hallways (Page 26) Best Practice Guide for Office Buildings - Hallways (Page 27) Best Practice Guide for Office Buildings - Kitchens (Page 28) Best Practice Guide for Office Buildings - Kitchens (Page 29) Best Practice Guide for Office Buildings - Open Offices (Page 30) Best Practice Guide for Office Buildings - Open Offices (Page 31) Best Practice Guide for Office Buildings - Open Offices (Page 32) Best Practice Guide for Office Buildings - Open Offices (Page 33) Best Practice Guide for Office Buildings - Open Offices (Page 34) Best Practice Guide for Office Buildings - Open Offices (Page 35) Best Practice Guide for Office Buildings - Open Offices (Page 36) Best Practice Guide for Office Buildings - Open Offices (Page 37) Best Practice Guide for Office Buildings - Open Offices (Page 38) Best Practice Guide for Office Buildings - Open Offices (Page 39) Best Practice Guide for Office Buildings - Open Offices (Page 40) Best Practice Guide for Office Buildings - Open Offices (Page 41) Best Practice Guide for Office Buildings - Open Offices (Page 42) Best Practice Guide for Office Buildings - Open Offices (Page 43) Best Practice Guide for Office Buildings - Open Offices (Page 44) Best Practice Guide for Office Buildings - Open Offices (Page 45) Best Practice Guide for Office Buildings - Open Offices (Page 46) Best Practice Guide for Office Buildings - Open Offices (Page 47) Best Practice Guide for Office Buildings - Open Offices (Page 48) Best Practice Guide for Office Buildings - Open Offices (Page 49) Best Practice Guide for Office Buildings - Open Offices (Page 50) Best Practice Guide for Office Buildings - Open Offices (Page 51) Best Practice Guide for Office Buildings - Private Offices (Page 52) Best Practice Guide for Office Buildings - Private Offices (Page 53) Best Practice Guide for Office Buildings - Private Offices (Page 54) Best Practice Guide for Office Buildings - Private Offices (Page 55) Best Practice Guide for Office Buildings - Private Offices (Page 56) Best Practice Guide for Office Buildings - Private Offices (Page 57) Best Practice Guide for Office Buildings - Private Offices (Page 58) Best Practice Guide for Office Buildings - Private Offices (Page 59) Best Practice Guide for Office Buildings - Private Offices (Page 60) Best Practice Guide for Office Buildings - Private Offices (Page 61) Best Practice Guide for Office Buildings - Restrooms (Page 62) Best Practice Guide for Office Buildings - Restrooms (Page 63) Best Practice Guide for Office Buildings - Restrooms (Page 64) Best Practice Guide for Office Buildings - Restrooms (Page 65) Best Practice Guide for Office Buildings - Stairwells (Page 66) Best Practice Guide for Office Buildings - Stairwells (Page 67) Best Practice Guide for Office Buildings - Stairwells (Page 68) Best Practice Guide for Office Buildings - Stairwells (Page 69) Best Practice Guide for Office Buildings - Storage Closets (Page 70) Best Practice Guide for Office Buildings - Storage Closets (Page 71) Best Practice Guide for Office Buildings - Exterior Lighting (Page 72) Best Practice Guide for Office Buildings - Exterior Lighting (Page 73) Best Practice Guide for Office Buildings - Exterior Lighting (Page 74) Best Practice Guide for Office Buildings - Exterior Lighting (Page 75) Best Practice Guide for Office Buildings - Summary of Energy Codes (Page 76) Best Practice Guide for Office Buildings - Summary of Energy Codes (Page 77) Best Practice Guide for Office Buildings - Summary of Energy Codes (Page 78)
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.