Best Practice Guide for Warehouses 2008 - (Page 37) WAREHOUSE Installation Notes BUILDINGS Bulk 1. Refer to Lighting Integrator Installation and Operation Summary for detailed installation and operation instructions of the lighting control panel. 2. Assign relays to the channels as shown on the Lighting Integrator relay schedule. 3. Commission the clock according to the Network Clock Automation Scenarios documentation, and test the operation after commissioning. 4. Test the operation of lighting control panels and low voltage switches after installation. 5. Use stainless steel switch plates to facilitate cleaning and minimize damage from impact. 6. Most applications require UL Listed, 18 to 22 gauge, three-conductor, Class 2 cable for low voltage wiring. For plenum return ceilings use UL Listed plenum-approved cables. 7. Confirm night light / egress lighting requirements with local code officials. & Equipment Schedule Rack Catalog No. LI 48S-48GA-115 HCLK8SS RS2-3 Qty 1 1 1 per 9,600ft² & 10,000ft² 1 per 9,600ft² & 10,000ft² Description Lighting Integrator lighting control panel, 48 relay interior, surface mount, 48 relays, 115/277V power supply Network clock/programmer for LI lighting control panel Unlighted two-button momentary override switch. One per established override zone. Wall plate, Pass & Seymour/Legrand, type 430 stainless steel finish, singlegang SL1 Storage 37 www.wattstopper.com • 800.879.8585 www.wattstopper.com • 800.879.8585 W-WA4.0 0508 http://www.wattstopper.com http://www.wattstopper.com
For optimal viewing of this digital publication, please enable JavaScript and then refresh the page. If you would like to try to load the digital publication without using Flash Player detection, please click here.