Building Industry Magazine - December 2011 - (Page 12)

ContractsAwarded Back to School A hefty 76 percent of the value of the contracts awarded in October is for school work, and much of it for University of Hawaii (UH) projects. That equates to 51 percent of the 29 contracts listed here. Seven are for UH, nine for public schools. The two biggest contributors are a $41.7 million contract to dck pacific construction, LLC for construction of a new information technology center, followed by a $15.3 million UH Edmonson Hall project won by Hawaiian Dredging Construction Co., Inc. While the building industry welcomes the school work more than students do, with a year-to-date total of $354,546,113, it brings us nowhere near last year’s $831,994,834 YTD total, leaving us still 57 percent down from the same time last year. Looks like we’ll need to keep those sharpened pencils close at hand... Kauai Maui DOE Hawaii DOT Oahu UH Awards By Area Oahu............................... 74,069,054 Hawaii ............................ 10,236,292 Kauai ................................ 4,839,545 Maui ................................. 2,401,000 TOTAL ............................91,545,891 Awards By Agency UH....................................65,611,747 DOT................................. 22,319,069 DOE ...................................3,615,075 TOTAL ............................91,545,891 OCTOBER 2011 Oahu (Awards are rounded up to the nearest dollar.) Allied Builders System .................2,913,676 Cagewash and Viviarium Improvements Biomedical Sciences Building, University of Hawaii at Manoa Triton Marine Construction..........2,682,091 Interstate Route H-1 - Salt Lake Viaduct Deck Repair Eastbound Continental Mechanical...............2,216,676 Upgrades to Loop C, R/R Chilled Water Distribution System Equipment and Controls University of Hawaii at Manoa C C Engineering ................................ 816,500 Waianae Intermediate School - Miscellaneous Repair and Maintenance for Race to the Top, Zones of School Innovation Stan’s Contracting ............................574,300 Replacement of Air Conditioning and Roof at Wilson Elementary School - Department of Education District Office Mega Construction .......................... 569,935 Traffic Operational Maintenance at Various Locations - Vicinity of Kamehameha Highway and Mokulele Drive Color Dynamics ................................ 534,500 Repair and Repaint Exterior, Building 8827 – Cosmetology and Building 8806 – Administration, Honolulu Community College, University of Hawaii Certified Construction ..................... 521,000 Farrington High School - Building I and J Reroof Projects Enterprises ........................ 446,000 Dole Middle School, Building I - Reroof; Building I - Replace Kitchen Vents MJ Construction Co.......................... 333,000 Campbell High School, Building N - Replace Chain Link Fence With Walls PER ..................................................... 313,000 Nanakuli Elementary School - Miscellaneous Repair and Maintenance for Race to the Top, Zones of School Innovation dck pacific construction ........... 41,691,850 Information Technology Center - University of Hawaii Systemwide Hawaiian Dredging .................... 15,338,000 General Repairs to Edmonson Hall - University of Hawaii at Manoa Grace Pacific..................................4,042,215 Fort Weaver Road Pavement Preservation - Renton Road to the Vicinity of Ewa Beach Road OCTOBER’S TOP 10 CONTRACTORS 1) dck pacific construction, LLC ......................................41,691,850 2) Hawaiian Dredging Construction Co., Inc. ................ 17,739,000 3) Grace Pacific Corp. .......................................................10,246,753 4) Jas W. Glover, Ltd. ......................................................... 4,472,309 5) Allied Builders System .................................................... 2,913,676 6) Triton Marine Construction Corp. ............................... 2,682,091 7) Continental Mechanical of the Pacific..........................2,216,676 8) Nan, Inc. .........................................................................1,864,143 9) Harry Asato Painting, Inc.............................................. 1,724,000 10) C C Engineering & Construction, Inc. ............................ 816,500 Information is summarized from the Contracts Awarded section of BIDService Weekly, compiled by research editor Alfonso R. Rivera. 12 | BUILDING INDUSTRY | DECEMBER 2011

Table of Contents for the Digital Edition of Building Industry Magazine - December 2011

Contents
Datebook
Career Days Hits Record
New Retail Coming to Ewa Plain
And the Winner is…
City Dedicates Wahiawa Transit Center
New Big Island Zipline Completed
Best Practices
Contracts Awarded
NAWIC Welcomes New Board
Top Stories, Issues and Projects
Concept to Completion: Hickam Historic Homes
Guam
Spotlight on Success: Aulani, a Disney Resort & Spa
GCA Early Bird Saves $100
Low Bids
News Makers
New Products

Building Industry Magazine - December 2011

https://www.nxtbook.com/trade/bi/0315
https://www.nxtbook.com/trade/bi/0215
https://www.nxtbook.com/trade/bi/0115
https://www.nxtbook.com/trade/bi/1214
https://www.nxtbook.com/trade/bi/1114
https://www.nxtbook.com/trade/bi/1014
https://www.nxtbook.com/trade/bi/0914
https://www.nxtbook.com/trade/bi/0814
https://www.nxtbook.com/trade/bi/0714
https://www.nxtbook.com/trade/bi/0614
https://www.nxtbook.com/trade/bi/0514
https://www.nxtbook.com/trade/bi/0414
https://www.nxtbook.com/trade/bi/0314
https://www.nxtbook.com/trade/bi/0214
https://www.nxtbook.com/trade/bi/0114
https://www.nxtbook.com/trade/bi/1213
https://www.nxtbook.com/trade/bi/1113
https://www.nxtbook.com/trade/bi/1013
https://www.nxtbook.com/trade/bi/0913
https://www.nxtbook.com/trade/bi/0813
https://www.nxtbook.com/trade/bi/0713
https://www.nxtbook.com/trade/bi/0613
https://www.nxtbook.com/trade/bi/0513
https://www.nxtbook.com/trade/bi/0413
https://www.nxtbook.com/trade/bi/0313
https://www.nxtbook.com/trade/bi/0213
https://www.nxtbook.com/trade/bi/0113
https://www.nxtbook.com/trade/bi/1212
https://www.nxtbook.com/trade/bi/1112
https://www.nxtbook.com/trade/bi/1012
https://www.nxtbook.com/trade/bi/0912
https://www.nxtbook.com/trade/bi/0812
https://www.nxtbook.com/trade/bi/0712
https://www.nxtbook.com/trade/bi/0612
https://www.nxtbook.com/trade/bi/0512
https://www.nxtbook.com/trade/bi/0412
https://www.nxtbook.com/trade/bi/0312
https://www.nxtbook.com/trade/bi/0212
https://www.nxtbook.com/trade/bi/0112
https://www.nxtbook.com/trade/bi/1211
https://www.nxtbook.com/trade/bi/1111
https://www.nxtbook.com/trade/bi/1011
https://www.nxtbook.com/trade/bi/0911
https://www.nxtbook.com/trade/bi/0811
https://www.nxtbook.com/trade/bi/0711
https://www.nxtbook.com/trade/bi/0611
https://www.nxtbook.com/trade/bi/0511
https://www.nxtbook.com/trade/bi/201103_bldngIndustry_nxtd
https://www.nxtbook.com/trade/bi/0411
https://www.nxtbookmedia.com