severe injury to untrained personnel. Access Limited provided certified nozzlemen to ensure the safety and quality of the work throughout construction. Embankment stabilized The unique combination of this geosynethically reinforced soil structure with soil nail and shotcrete supported face was an innovative way to ensure the performance of the MSE structure while managing the risks of building over unfavorable soil. The use of wick drains below the structure and geocomposite drainage further enhance stability by mitigating the migration of retained fill, facilitating efficient water drainage and reducing hydrostatic pressure behind the walls. By managing water effectively, the drainage boards contribute to the long-term integrity of the retaining structures. The innovative design of Earth Engineering and the execution by Richard E. Pierson Construction Co. and Access Limited ensured the project work was completed within budget and on time, with the embankment stabilization being fully completed by fall 2023 to provide the museum and its visitors with enhanced accessibility for the museum's grand opening and for years to come. G >> For more, search " geosynthetic soil " at GeosyntheticsMagazine.com. The use of wick drains below the structure and geocomposite drainage further enhance stability by mitigating the migration of retained fill, facilitating efficient water drainage and reducing hydrostatic pressure behind the walls. Stay Connected to your industry GeosyntheticsMagazine.com features everything the magazine has and more: » Exclusive feature content » Industry news updated daily » In-depth research on the latest products and projects Visit today! GeosyntheticsMagazine.com 35http://www.GeosyntheticsMagazine.com http://www.GeosyntheticsMagazine.com http://www.GeosyntheticsMagazine.com