Completed panel excavation at the downstream end of the project Cutter working in close proximity to a conveyor belt Cutter excavating bedrock at the upstream end of the project (Stan Musial Bridge in the background) DEEP FOUNDATIONS * SEPT/OCT 2023 * 93