EQUIPMENT PACKAGING " Downtime and changeover become some of the obstacles when outlining your production schedule. " - VICTORIA LOPEZ, FOX PACKAGING imperative to pack according to size, this minimizes the amount of adjustments that will need to be made to the machine when changing the line over. DeCou, Volm: Consider changeover as part of your overall cost of doing business and factor the ROI of more repeatable conversions can be to your equipment. Reducing the time of the change is the beginning, but considering the downstream effects of reduced initial quality and intermittent stoppages to regain smooth operation at rate again needs to be factored into your operation. Upfront options to some solutions come at greater initial cost, but pay off over time when implemented effectively. Fox, Somic: A producer needs to look at this from both ends. Do you really need to provide 12 different customers all with their own formats? Many companies do not recognize the tremendous cost in dealing with different formats, from Industry Insight On Your Own Schedule On-Demand Webinars Watch Now at produceprocessing.net 20 JULY/AUGUST 2 0 2 0http://www.produceprocessing.net