Canadian Dam Association Bulletin - Winter 2018 - 25

Hansen, E.M., D.D. Fenn, L.C. Schreiner, R.W.

Tomlinson, E.M., 1993: Probable Maximum

Stodt, and J.F. Miller, 1988: Probable Maximum

Precipitation Study for Michigan and

Precipitation Estimates - United States

Wisconsin, Electric Power Research Institute,

Between the Continental Divide and the 103rd

Palo Alto, Ca, TR-101554, V1.

Basins, The University of Alberta, Edmonton,
Alberta, 321 pp.
World Meteorological Organization, 1986:
Manual for Estimation of Probable

Meridian. Hydrometeorological Report No.

Tomlinson, E.M., Kappel, W.D., and T.W.

Maximum Precipitation , Operational

55A, U.S. Department of Commerce, Silver

Parzybok, December 2008: Statewide

Hydrology Report No 1, 2nd Edition, WMO,

Spring, MD, 242 pp.

Probable Maximum Precipitation (PMP)

Hansen, E.M., D.D. Fenn, P. Corrigan, J.L. Vogel,

Study for the State of Nebraska.

Geneva, 269 pp.
World Meteorological Organization, 2009: Manual

L.C. Schreiner, and R.W. Stodt, 1994: Probable

Tomlinson, E.M. and W. D. Kappel, October 2009:

for Estimation of Probable Maximum

Maximum Precipitation-Pacific Northwest

Revisiting PMPs, Hydro Review, Vol. 28, No.

Precipitation, Operational Hydrology Report

States, Hydrometeorological Report Number

7, 10-17.

No 1045, WMO, Geneva, 259 pp.

57, National Weather Service, National

Vershuren, J.P., and L. Wojtiw, 1980: Estimate of the

Oceanic and Atmospheric Administration,

Maximum Probable Precipitation for Albert River

■

U. S. Department of Commerce, Silver Spring,
MD, 338 pp.
Kappel, W.D., Hultstrand, D.M., Tomlinson, E.M.,
and G.A., Muhlestein, August 2012: SiteSpecific Probable Maximum Precipitation
(PMP) Study for the Tarrant Regional Water
District-Benbrook and Floodway Basins,
Ft Worth, TX.
Kappel, W.D., Hultstrand, D.M., Muhlestein,
G.A., Steinhilber, K., McGlone, D., Parzybok,
T.W, and E.M. Tomlinson, December 2014:
Statewide Probable Maximum Precipitation
(PMP) Study for Wyoming.
Kappel, W.D., Hultstrand, D.M., Muhlestein,
G.A., Steinhilber, K., McGlone, D., Lovisone,
S., and B. Lawrence, April 2015: Site-specific
Probable Maximum Precipitation for the
Thomson Dam Basin, Minnesota.
Kappel, W.D., Hultstrand, D.M., Muhlestein, G.A.,
Steinhilber, K., McGlone, D., Parzybok, T.W.,
and B. Lawrence, August 2015: Regional
Probable Maximum Precipitation for the
Tennessee Valley Authority.
Kappel, W.D., Hultstrand, D.M., Muhlestein,
G.A., Steinhilber, K., and McGlone, D,
August 2015: Site-Specific Probable
Maximum Precipitation for the Altoona
Water Authority.
Kappel, W.D., Hultstrand, D.M., Muhlestein, G.A.,
Steinhilber, K., McGlone, D., Parzybok, T.W.,
and B. Lawrence, November 2015: Statewide
Probable Maximum Precipitation for Virginia.
Minty, L.J., Meighen, J. and Kennedy, M.R. (1996)
Development of the Generalised Southeast
Australia Method for Estimating Probable
Maximum Precipitation, HRS Report
No. 4, Hydrology Report Series, Bureau
of Meteorology, Melbourne, Australia,
August 1996.
Northwest Hydraulic Consultants, 1990:
Little Bow River Project Little Bow River
Dam Probable Maximum Flood, Volume
I, Overview Report and Appendices,
Edmonton, Alberta, 308 pp.

Canadian Dam Association * Winter 2018

891937_American.indd 1

07/11/17 25
2:17 am


http://www.americanbabbitt.com http://www.americanbabbitt.com

Table of Contents for the Digital Edition of Canadian Dam Association Bulletin - Winter 2018

BOARD OF DIRECTORS
PRESIDENT’S MESSAGE
UPDATING PMP FOR THE ELBOW RIVER: COMPLEX TERRAIN, UNIQUE SOLUTIONS
KELOWNA 2017
CDA AWARDS
ANNUAL GENERAL MEETING 2017
YOUNG PROFESSIONALS UPDATE
DAMS AND DIKES, WIKI STYLE
2017 FINANCE REPORT
CDA 2018 CONFERENCE: THE MANAGEMENT OF AGING DAMS
CDA NEWS BRIEF
BUYERS’ GUIDE AND TRADE LIST
Canadian Dam Association Bulletin - Winter 2018 - Intro
Canadian Dam Association Bulletin - Winter 2018 - cover1
Canadian Dam Association Bulletin - Winter 2018 - cover2
Canadian Dam Association Bulletin - Winter 2018 - 3
Canadian Dam Association Bulletin - Winter 2018 - 4
Canadian Dam Association Bulletin - Winter 2018 - 5
Canadian Dam Association Bulletin - Winter 2018 - 6
Canadian Dam Association Bulletin - Winter 2018 - BOARD OF DIRECTORS
Canadian Dam Association Bulletin - Winter 2018 - PRESIDENT’S MESSAGE
Canadian Dam Association Bulletin - Winter 2018 - 9
Canadian Dam Association Bulletin - Winter 2018 - UPDATING PMP FOR THE ELBOW RIVER: COMPLEX TERRAIN, UNIQUE SOLUTIONS
Canadian Dam Association Bulletin - Winter 2018 - 11
Canadian Dam Association Bulletin - Winter 2018 - 12
Canadian Dam Association Bulletin - Winter 2018 - 13
Canadian Dam Association Bulletin - Winter 2018 - 14
Canadian Dam Association Bulletin - Winter 2018 - 15
Canadian Dam Association Bulletin - Winter 2018 - 16
Canadian Dam Association Bulletin - Winter 2018 - 17
Canadian Dam Association Bulletin - Winter 2018 - 18
Canadian Dam Association Bulletin - Winter 2018 - 19
Canadian Dam Association Bulletin - Winter 2018 - 20
Canadian Dam Association Bulletin - Winter 2018 - 21
Canadian Dam Association Bulletin - Winter 2018 - 22
Canadian Dam Association Bulletin - Winter 2018 - 23
Canadian Dam Association Bulletin - Winter 2018 - 24
Canadian Dam Association Bulletin - Winter 2018 - 25
Canadian Dam Association Bulletin - Winter 2018 - KELOWNA 2017
Canadian Dam Association Bulletin - Winter 2018 - 27
Canadian Dam Association Bulletin - Winter 2018 - CDA AWARDS
Canadian Dam Association Bulletin - Winter 2018 - 29
Canadian Dam Association Bulletin - Winter 2018 - ANNUAL GENERAL MEETING 2017
Canadian Dam Association Bulletin - Winter 2018 - 31
Canadian Dam Association Bulletin - Winter 2018 - YOUNG PROFESSIONALS UPDATE
Canadian Dam Association Bulletin - Winter 2018 - 33
Canadian Dam Association Bulletin - Winter 2018 - DAMS AND DIKES, WIKI STYLE
Canadian Dam Association Bulletin - Winter 2018 - 35
Canadian Dam Association Bulletin - Winter 2018 - 2017 FINANCE REPORT
Canadian Dam Association Bulletin - Winter 2018 - 37
Canadian Dam Association Bulletin - Winter 2018 - 38
Canadian Dam Association Bulletin - Winter 2018 - 39
Canadian Dam Association Bulletin - Winter 2018 - CDA 2018 CONFERENCE: THE MANAGEMENT OF AGING DAMS
Canadian Dam Association Bulletin - Winter 2018 - 41
Canadian Dam Association Bulletin - Winter 2018 - CDA NEWS BRIEF
Canadian Dam Association Bulletin - Winter 2018 - 43
Canadian Dam Association Bulletin - Winter 2018 - 44
Canadian Dam Association Bulletin - Winter 2018 - BUYERS’ GUIDE AND TRADE LIST
Canadian Dam Association Bulletin - Winter 2018 - 46
Canadian Dam Association Bulletin - Winter 2018 - cover3
Canadian Dam Association Bulletin - Winter 2018 - cover4
https://www.nxtbook.com/naylor/CDAQ/CDAQ0119
https://www.nxtbook.com/naylor/CDAQ/CDAQ0418
https://www.nxtbook.com/naylor/CDAQ/CDAQ0318
https://www.nxtbook.com/naylor/CDAQ/CDAQ0218
https://www.nxtbook.com/naylor/CDAQ/CDAQ0118
https://www.nxtbook.com/naylor/CDAQ/CDAQ0417
https://www.nxtbook.com/naylor/CDAQ/CDAQ0317
https://www.nxtbook.com/naylor/CDAQ/CDAQ0217
https://www.nxtbook.com/naylor/CDAQ/CDAQ0117
https://www.nxtbook.com/naylor/CDAQ/CDAQ0416
https://www.nxtbook.com/naylor/CDAQ/CDAQ0316
https://www.nxtbook.com/naylor/CDAQ/CDAQ0216
https://www.nxtbook.com/naylor/CDAQ/CDAQ0116
https://www.nxtbook.com/naylor/CDAQ/CDAQ0415
https://www.nxtbook.com/naylor/CDAQ/CDAQ0315
https://www.nxtbook.com/naylor/CDAQ/CDAQ0215
https://www.nxtbook.com/naylor/CDAQ/CDAQ0115
https://www.nxtbookmedia.com