Pond. When repairs were ongoing,
the dams were rebuilt to the height
of the Whirl Pond Dam.
Although the dams were repaired
in 2010, the rebuild of the plant was
not completed until 2011. The damage to the Port Union Development
totalled over $1,500,000, with a largest portion of the costs being associated with rebuilding the plant due to
water inundation.
4.2 Lawn Development
At the Lawn development, the overtopping flows eroded the downstream
rock fill buttress and damaged the concrete, railing, and penstock supports.
Meco recommended the reinstatement
of the downstream buttress as it is
required to meet stability criteria and
the repair of the damaged concrete
and railing.
Newfoundland Power originally
tendered this work in Fall 2010 to be
completed before the reservoir iced
over. Because the work was tendered
late in the construction season and
construction contractors were very
busy due to storm cleanup projects,
contract prices were unfeasible. The
bulk of the work was postponed to
2011 with minor works completed in
Fall 2010 to ensure the dams stability
through the winter. Newfoundland
Power stabilized the penstock and
elected to install several temporary
water recirculation devices to keep
ice from forming during the winter
months. Replacement of the downstream rock fill buttress and other
repairs were completed in 2011. The
total cost of the damage to the Lawn
development as a result of Hurricane
Igor totalled over $400,000, with most
of the cost being associated with the
repairs at the dam structure.

Figure 10: Flooding at Port Union During Hurricane Igor; Whirl Pond (left) and Powerhouse (right)

BUOYS - FLOATS - CHANNEL MARKERS

Oval
Floats

Round
Floats

5. CONCLUSION
Estimated flood intensities at Port
Union and Lawn watersheds during
Hurricane Igor occurring September
2010 are provided. The hurricane struck
the eastern part of the island for almost
twenty (20) hours and dumped heavy
rainfall over an extended area across
a swath of central Newfoundland. The
resulting floods caused a significant
amount of damage to the hydroelectric
Canadian Dam Association * Summer 2017

Float Collar Can & Regulatory Buoys / Channel Markers

463383_Worthington.indd 1

Call l 800.899.2977

Click l www.tuffbuoy.com
33 AM
2/23/10 11:03:43


http://www.tuffbuoy.com

Table of Contents for the Digital Edition of Canadian Dam Association Bulletin - Summer 2017

Board of Directors
President's Message
Roller Compacted Concrete Buttress at the Site C Clean Energy Project
Hurricane Igor's Impact on Newfoundland Power's Small Hydro
CDA Conference Heads to Kelowna!
CDA Directors & Officers - Call for Nominations
2017 CDA Awards - Call for Nominations
CDA Developing New Ways to Distribute Guidelines
Notice of Annual General Meeting
Time to Renew Your Membership
Buyers' Guide and Trade List
Canadian Dam Association Bulletin - Summer 2017 - intro
Canadian Dam Association Bulletin - Summer 2017 - 1
Canadian Dam Association Bulletin - Summer 2017 - 2
Canadian Dam Association Bulletin - Summer 2017 - 3
Canadian Dam Association Bulletin - Summer 2017 - 4
Canadian Dam Association Bulletin - Summer 2017 - 5
Canadian Dam Association Bulletin - Summer 2017 - 6
Canadian Dam Association Bulletin - Summer 2017 - Board of Directors
Canadian Dam Association Bulletin - Summer 2017 - 8
Canadian Dam Association Bulletin - Summer 2017 - President's Message
Canadian Dam Association Bulletin - Summer 2017 - 10
Canadian Dam Association Bulletin - Summer 2017 - 11
Canadian Dam Association Bulletin - Summer 2017 - Roller Compacted Concrete Buttress at the Site C Clean Energy Project
Canadian Dam Association Bulletin - Summer 2017 - 13
Canadian Dam Association Bulletin - Summer 2017 - 14
Canadian Dam Association Bulletin - Summer 2017 - 15
Canadian Dam Association Bulletin - Summer 2017 - 16
Canadian Dam Association Bulletin - Summer 2017 - 17
Canadian Dam Association Bulletin - Summer 2017 - 18
Canadian Dam Association Bulletin - Summer 2017 - 19
Canadian Dam Association Bulletin - Summer 2017 - 20
Canadian Dam Association Bulletin - Summer 2017 - 21
Canadian Dam Association Bulletin - Summer 2017 - 22
Canadian Dam Association Bulletin - Summer 2017 - 23
Canadian Dam Association Bulletin - Summer 2017 - Hurricane Igor's Impact on Newfoundland Power's Small Hydro
Canadian Dam Association Bulletin - Summer 2017 - 25
Canadian Dam Association Bulletin - Summer 2017 - 26
Canadian Dam Association Bulletin - Summer 2017 - 27
Canadian Dam Association Bulletin - Summer 2017 - 28
Canadian Dam Association Bulletin - Summer 2017 - 29
Canadian Dam Association Bulletin - Summer 2017 - 30
Canadian Dam Association Bulletin - Summer 2017 - 31
Canadian Dam Association Bulletin - Summer 2017 - 32
Canadian Dam Association Bulletin - Summer 2017 - 33
Canadian Dam Association Bulletin - Summer 2017 - 34
Canadian Dam Association Bulletin - Summer 2017 - 35
Canadian Dam Association Bulletin - Summer 2017 - CDA Conference Heads to Kelowna!
Canadian Dam Association Bulletin - Summer 2017 - 37
Canadian Dam Association Bulletin - Summer 2017 - 38
Canadian Dam Association Bulletin - Summer 2017 - 39
Canadian Dam Association Bulletin - Summer 2017 - 40
Canadian Dam Association Bulletin - Summer 2017 - 41
Canadian Dam Association Bulletin - Summer 2017 - 42
Canadian Dam Association Bulletin - Summer 2017 - 43
Canadian Dam Association Bulletin - Summer 2017 - 44
Canadian Dam Association Bulletin - Summer 2017 - 45
Canadian Dam Association Bulletin - Summer 2017 - CDA Directors & Officers - Call for Nominations
Canadian Dam Association Bulletin - Summer 2017 - 47
Canadian Dam Association Bulletin - Summer 2017 - 2017 CDA Awards - Call for Nominations
Canadian Dam Association Bulletin - Summer 2017 - 49
Canadian Dam Association Bulletin - Summer 2017 - CDA Developing New Ways to Distribute Guidelines
Canadian Dam Association Bulletin - Summer 2017 - 51
Canadian Dam Association Bulletin - Summer 2017 - 52
Canadian Dam Association Bulletin - Summer 2017 - Notice of Annual General Meeting
Canadian Dam Association Bulletin - Summer 2017 - Time to Renew Your Membership
Canadian Dam Association Bulletin - Summer 2017 - Buyers' Guide and Trade List
Canadian Dam Association Bulletin - Summer 2017 - 56
Canadian Dam Association Bulletin - Summer 2017 - 57
Canadian Dam Association Bulletin - Summer 2017 - 58
Canadian Dam Association Bulletin - Summer 2017 - 59
Canadian Dam Association Bulletin - Summer 2017 - 60
https://www.nxtbook.com/naylor/CDAQ/CDAQ0119
https://www.nxtbook.com/naylor/CDAQ/CDAQ0418
https://www.nxtbook.com/naylor/CDAQ/CDAQ0318
https://www.nxtbook.com/naylor/CDAQ/CDAQ0218
https://www.nxtbook.com/naylor/CDAQ/CDAQ0118
https://www.nxtbook.com/naylor/CDAQ/CDAQ0417
https://www.nxtbook.com/naylor/CDAQ/CDAQ0317
https://www.nxtbook.com/naylor/CDAQ/CDAQ0217
https://www.nxtbook.com/naylor/CDAQ/CDAQ0117
https://www.nxtbook.com/naylor/CDAQ/CDAQ0416
https://www.nxtbook.com/naylor/CDAQ/CDAQ0316
https://www.nxtbook.com/naylor/CDAQ/CDAQ0216
https://www.nxtbook.com/naylor/CDAQ/CDAQ0116
https://www.nxtbook.com/naylor/CDAQ/CDAQ0415
https://www.nxtbook.com/naylor/CDAQ/CDAQ0315
https://www.nxtbook.com/naylor/CDAQ/CDAQ0215
https://www.nxtbook.com/naylor/CDAQ/CDAQ0115
https://www.nxtbookmedia.com