Ontario Pipeline - Fall 2018 - 14

Figure 2: Pam London
and Akmed Nangle
(operations) are taking
process water samples
for online verifications.

changes, changes in raw water or treatment water quality and especially look
for anomalies; a turbidity spike could be
a potential pathogen breakthrough. In the
process of setting up trend graphs, ensure
that the scaling allows for abnormal conditions; ensure that the data is not capped as
it important to capture worst case scenario.
Management and operational staff should
review trends on a routine basis to stay in
tune with the plant's changes to be able
to offer support with making informed

process decisions. This is assuming that
you have reliable data.
A quality control and quality assurance
program needs to undergo continuous
evaluation to seek out opportunities
for improvement as well as effectiveness. Your QA/QC program should help
strengthen your facility's ability to identify
areas of weakness or areas of concern. The
collection and analysis of good reputable
data is very important in a water treatment plant.

Emily Jarvis is an optimization specialist with
Veolia water supporting efforts to optimize
the Haldimand County water facilities to
excel beyond the regulatory requirements
through facilitating workshops and supporting skills transfer.
Pam London-Exner is the lab manager of the
Tampa Bay Regional Surface Water Treatment
Plant operated by Veolia. She is the Chair for
the Florida Section of the AWWA Technical
and Education Council

WE DO IT ALL

CORROSION PROTECTION & SEALING SYSTEMS YOU CAN DEPEND ON

Extend Structure Life,
Reduce Maintenance & Repair Costs
* for industrial steelwork, pipework & road surfaces
* above & below ground pipe, valves, ļ¬ttings & steel
* offshore marine piling protection
* road, bridge, airport & asphalt applications
A member of Winn & Coales International.

14596337_Denso.indd
| O N T A R I O 1 P I P E L I N E | FALL 2018

www.densona.com
Toronto * Edmonton
Denso North America Inc.
90 Ironside Cres. Unit 12 Toronto, ON M1X 1M3
Tel: 416.291.3435 Fax: 416.291.0898

7/13/12 12:55:57 PM


http://www.densona.com http://www.densona.com

Ontario Pipeline - Fall 2018

Table of Contents for the Digital Edition of Ontario Pipeline - Fall 2018

The OWWA Report
The OMWA Report
The OWWEA Report
Ontario Provincial Standards are Made for Life in Ontario
QA/QC for the Operational Lab & Online Equipment
The Perils of Misreading and Misusing Standards
Control & Prevention of Disinfection By-product Formation
The Great Lakes Water Festival
Committee Reports
Certification Corner
OWWEA Member Listing
Index to Advertisers
Ontario Pipeline - Fall 2018 - Intro
Ontario Pipeline - Fall 2018 - bellyband1
Ontario Pipeline - Fall 2018 - bellyband2
Ontario Pipeline - Fall 2018 - cover1
Ontario Pipeline - Fall 2018 - cover2
Ontario Pipeline - Fall 2018 - 3
Ontario Pipeline - Fall 2018 - The OWWA Report
Ontario Pipeline - Fall 2018 - The OMWA Report
Ontario Pipeline - Fall 2018 - The OWWEA Report
Ontario Pipeline - Fall 2018 - 7
Ontario Pipeline - Fall 2018 - Ontario Provincial Standards are Made for Life in Ontario
Ontario Pipeline - Fall 2018 - 9
Ontario Pipeline - Fall 2018 - 10
Ontario Pipeline - Fall 2018 - 11
Ontario Pipeline - Fall 2018 - QA/QC for the Operational Lab & Online Equipment
Ontario Pipeline - Fall 2018 - 13
Ontario Pipeline - Fall 2018 - 14
Ontario Pipeline - Fall 2018 - The Perils of Misreading and Misusing Standards
Ontario Pipeline - Fall 2018 - 16
Ontario Pipeline - Fall 2018 - 17
Ontario Pipeline - Fall 2018 - Control & Prevention of Disinfection By-product Formation
Ontario Pipeline - Fall 2018 - 19
Ontario Pipeline - Fall 2018 - 20
Ontario Pipeline - Fall 2018 - 21
Ontario Pipeline - Fall 2018 - The Great Lakes Water Festival
Ontario Pipeline - Fall 2018 - 23
Ontario Pipeline - Fall 2018 - Committee Reports
Ontario Pipeline - Fall 2018 - 25
Ontario Pipeline - Fall 2018 - 26
Ontario Pipeline - Fall 2018 - 27
Ontario Pipeline - Fall 2018 - 28
Ontario Pipeline - Fall 2018 - 29
Ontario Pipeline - Fall 2018 - 30
Ontario Pipeline - Fall 2018 - 31
Ontario Pipeline - Fall 2018 - 32
Ontario Pipeline - Fall 2018 - Certification Corner
Ontario Pipeline - Fall 2018 - OWWEA Member Listing
Ontario Pipeline - Fall 2018 - 35
Ontario Pipeline - Fall 2018 - 36
Ontario Pipeline - Fall 2018 - 37
Ontario Pipeline - Fall 2018 - Index to Advertisers
Ontario Pipeline - Fall 2018 - cover3
Ontario Pipeline - Fall 2018 - cover4
https://www.nxtbook.com/naylor/OWWQ/OWWQ0318
https://www.nxtbook.com/naylor/OWWQ/OWWQ0218
https://www.nxtbook.com/naylor/OWWQ/OWWQ0118
https://www.nxtbook.com/naylor/OWWQ/OWWQ0417
https://www.nxtbook.com/naylor/OWWQ/OWWQ0317
https://www.nxtbook.com/naylor/OWWQ/OWWQ0217
https://www.nxtbook.com/naylor/OWWQ/OWWQ0117
https://www.nxtbook.com/naylor/OWWQ/OWWQ0416
https://www.nxtbook.com/naylor/OWWQ/OWWQ0316
https://www.nxtbook.com/naylor/OWWQ/OWWQ0216
https://www.nxtbook.com/naylor/OWWQ/OWWQ0116
https://www.nxtbook.com/naylor/OWWQ/OWWQ0415
https://www.nxtbook.com/naylor/OWWQ/OWWQ0315
https://www.nxtbook.com/naylor/OWWQ/OWWQ0215
https://www.nxtbook.com/naylor/OWWQ/OWWQ0115
https://www.nxtbookmedia.com