Engineering Inc - July/August 2017 - T7

8

MEDIA LIST
E-mail addresses of local newspapers, TV, radio stations and
other media outlets where your project can be highlighted in
Excel format. If the state MO or entrant prefers to handle all
local and national publicity for the project, include a statement
to that effect. Specifications: Excel file; 8.5" x 11" or 11" x 17".

9

PRESS RELEASE (two pages max.)
Press release that clearly and concisely describes the project
and the entrant's participation, based on information presented
in the Project Description. Also describe the value of the
project to the community including information such as the
number of people served, cost savings, etc. Do not reference
other awards the project has won. Specifications: double-spaced;
8.5" x 11"; PDF or Word format.

10

POWERPOINT PRESENTATION
PowerPoint file, containing 8 slides including a title
slide with ACEC and EEA logos, firm name, project name,
project location: city and state, followed by 6 slides that
include photos 1 through 6 (same photos as Item 6 above),
plus the last slide that contains the photographic display panel.
This presentation will be used by the judges as part of their
evaluation. Do not include sound, transition effects, animation,
preset timing, or slide show sequencing. A sample PowerPoint
presentation is downloadable from the ACEC website.

11

SUPPLEMENTARY REPORT
Include a supplementary report containing the findings
portrayed with text, graphs, or photos, as needed.
NOTE: This report is ONLY required for Category A submittals.

Specifications: PDF format.

II. USB FLASH DRIVE
USB Contents & Specifications: One USB flash drive (to be sent
to ACEC with Photographic Display Panel). Include labels on
USB and Photographic Display Panel with firm name, project
name and category. Test the USB flash drive on different
computers to ensure that it is not machine-dependent.
Include each of the following items in the file type indicated, in
the order given, and with the titles shown:
01
02
03
04
05
06
07
08
09
10
11

Electronic Project Submission Form
Client/Owner Letter
Executive Summary
Project Description
Key Participants
Six Photos or Graphics
(Photo Captions: Type separately in a Word document)
Photographic Display Panel
Media List; Excel File
Press Release
PowerPoint Presentation
Supplemental Report

W W W. A C E C . O R G

III. PHOTOGRAPHIC DISPLAY PANEL
Panel text and photos should demonstrate the challenges,
solutions, innovation, complexity and unique aspects of key
project elements. The panel should be prepared with highquality photos and graphics with minimal text.
Photographic panel requirements:
1. PANEL SIZE: 30" x 30" square, with a matte finish,
laminated front and back as follows:
a. Front lamination thickness: 5 mil
b. Back lamination thickness: 5 mil
c. Panel stock thickness before lamination: no more
than 5-6 mil
d. Total panel (with lamination) thickness: 15-16 mil
NOTE: Framed or mounted panels will NOT
be accepted.
2. VELCRO ATTACHMENTS: Four, 9-inch long strips of
Velcro (the hook side only) must be placed vertically on
the back, near each corner of the panel.
3. PHOTOS/GRAPHICS: Maximum of 6 photos and/
or graphics shall be used on the panel. Each image shall
be a minimum of 7" x 5" or 35 square inches in area. A
background photo is not considered a photograph.
4. TEXT/FONTS: Panel text may not exceed 250 words
total, not including captions. Font sizes: 32 pt. minimum
font for text or descriptions; 28 pt. minimum font for
captions and graphics.
5. REQUIRED ELEMENTS: The front of the panel shall
also include the ACEC and EEA logos (download from
ACEC website), title and location of the project or study,
client/ owner's name and location, and entering firm's name
and location (minimum 32 pt. font size).
6. CORNER SPACE: Leave a 2"x 2" space in the upper
right-hand corner of the panel that is free of text or images.
Do not leave the "blank" space as a white square; the
background scheme should continue, but will be partially
covered by the review committee's coding label.
7. BACK OF PANEL LABEL: Add a label to the back of the
panel with the name of the entrant's firm, the firm address,
the project name, and the entry category.
NOTE: If production/printing services for your photographic
display panel are not available in your community, contact
Daisy Nappier at ACEC for sources.

SHIPPING
Photographic display panels must be rolled and shipped in mailing tubes.
All materials including the electronic submission must be received by
January 5, 2018.
Ship USB flash drive and Photographic display panel to:
American Council of Engineering Companies
Attn: Daisy Nappier
1015 15th Street, NW, 8th Floor
Washington, D.C. 20005-2605

7
7



Table of Contents for the Digital Edition of Engineering Inc - July/August 2017

Engineering Inc - July/august 2017
Contents
From Acec to You
Market Watch
Legislative Action
Working on a Cure
Year of Engagement
Employment Recovery
Brand Perception
Digital Documentation
Pli Market Remains Strong
Standing Tall
Mcmahon Power
Guest Column
Mergers and Acquisitions
Members in the News
Business Insights
Engineering Inc - July/August 2017 - Intro
Engineering Inc - July/August 2017 - Engineering Inc - July/august 2017
Engineering Inc - July/August 2017 - Cover2
Engineering Inc - July/August 2017 - T1
Engineering Inc - July/August 2017 - T2
Engineering Inc - July/August 2017 - T3
Engineering Inc - July/August 2017 - T4
Engineering Inc - July/August 2017 - T5
Engineering Inc - July/August 2017 - T6
Engineering Inc - July/August 2017 - T7
Engineering Inc - July/August 2017 - T8
Engineering Inc - July/August 2017 - Contents
Engineering Inc - July/August 2017 - 2
Engineering Inc - July/August 2017 - 3
Engineering Inc - July/August 2017 - From Acec to You
Engineering Inc - July/August 2017 - 5
Engineering Inc - July/August 2017 - Market Watch
Engineering Inc - July/August 2017 - 7
Engineering Inc - July/August 2017 - Legislative Action
Engineering Inc - July/August 2017 - 9
Engineering Inc - July/August 2017 - Working on a Cure
Engineering Inc - July/August 2017 - 11
Engineering Inc - July/August 2017 - 12
Engineering Inc - July/August 2017 - 13
Engineering Inc - July/August 2017 - Year of Engagement
Engineering Inc - July/August 2017 - 15
Engineering Inc - July/August 2017 - 16
Engineering Inc - July/August 2017 - 17
Engineering Inc - July/August 2017 - Employment Recovery
Engineering Inc - July/August 2017 - 19
Engineering Inc - July/August 2017 - 20
Engineering Inc - July/August 2017 - 21
Engineering Inc - July/August 2017 - Brand Perception
Engineering Inc - July/August 2017 - 23
Engineering Inc - July/August 2017 - 24
Engineering Inc - July/August 2017 - 25
Engineering Inc - July/August 2017 - Digital Documentation
Engineering Inc - July/August 2017 - 27
Engineering Inc - July/August 2017 - 28
Engineering Inc - July/August 2017 - 29
Engineering Inc - July/August 2017 - 30
Engineering Inc - July/August 2017 - Pli Market Remains Strong
Engineering Inc - July/August 2017 - 32
Engineering Inc - July/August 2017 - 33
Engineering Inc - July/August 2017 - 34
Engineering Inc - July/August 2017 - Standing Tall
Engineering Inc - July/August 2017 - 36
Engineering Inc - July/August 2017 - 37
Engineering Inc - July/August 2017 - 38
Engineering Inc - July/August 2017 - 39
Engineering Inc - July/August 2017 - Mcmahon Power
Engineering Inc - July/August 2017 - 41
Engineering Inc - July/August 2017 - 42
Engineering Inc - July/August 2017 - 43
Engineering Inc - July/August 2017 - Guest Column
Engineering Inc - July/August 2017 - 45
Engineering Inc - July/August 2017 - Mergers and Acquisitions
Engineering Inc - July/August 2017 - 47
Engineering Inc - July/August 2017 - 48
Engineering Inc - July/August 2017 - Members in the News
Engineering Inc - July/August 2017 - 50
Engineering Inc - July/August 2017 - 51
Engineering Inc - July/August 2017 - Business Insights
Engineering Inc - July/August 2017 - Cover3
Engineering Inc - July/August 2017 - Cover4
https://www.nxtbook.com/nxtbooks/acec/engineeringinc_spring2020
https://www.nxtbook.com/nxtbooks/acec/engineeringinc_winter2020
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1119
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0919
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0719
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0519
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0319
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0119
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1118
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0918
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0718
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0518
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0318
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0118
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1117
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0917
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0717
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0517
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0317
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0117
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1116
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0916
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0716
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0516
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0316
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0116
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1115
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0915
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0715
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0515
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0315
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0115
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1114
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0914
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0714
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0514
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0314
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0114
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1113
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0913
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0713
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0513
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0313
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0113
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1112
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0912
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0712
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0512
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0312
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0112
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1111
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0911
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0711
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0511
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0311
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0111
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1110
https://www.nxtbook.com/nxtbooks/acec/engineeringincSeptOct
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0910
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0710
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0510
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0310
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0110
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1109
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0909
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0709
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0309
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0109_v2
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0109
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1108
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0908
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0708
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0508
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0308
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0108
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1107
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0907
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0707
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0507
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0307
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0107
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0505
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0305
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1105
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0306
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0105
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1103
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0906
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0903
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0703
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0106
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0506
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0503
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0303
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0904
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1104
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0704
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0504
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0304
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0905
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0705
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0104
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1106
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0706
https://www.nxtbookmedia.com