PAINTED SURFACE BY OTHERS EQUIPMENT BY OTHERS 11 497 6 3 4 " 39 78 " 41 " 25 1 8 " 8 " 8 " Hospitality Team Allegheny Millwork met 6 18 " SOLID SURFACE BY OTHERS ACCESS COUNTER 1212 " 6 18 " 22 " PLAN @ RECEPTION DESK 3 3 69 " 81 1 4 " 36 " 8 " 6 18 " weekly with the design team and general contractor- either in-person or on a conference call to review, outline and present details of making the design intent a reality, reports Bell. " Everything from wood joinery, metal fabrication best practices and fabrication solutions were on the table and thoroughly collaborated upon. With such specific design elements that intended to draw upon Kentucky roots, it was important to initiate personal meetings to fully understand the design end game. " Throughout the project, Allegheny Millwork offered value engineering suggestions and alternates in the way of materials and fabrication execution, he continues. " Time and money were saved in a significant way as the value engineering was adopted and implemented. The general contractor stuck to a very tight and organized schedule and by 'staffing up' installation and production we were able to be a proactive driving force on the project. " winter 2022 I designsolutions 23