Contract - June 2015 - 92

connections are elegant, as in any Piano-designed
museum. Heart pine flooring, which was reused
from two separate factories in the Northeast
and the South, gives each floor an intentionally
weathered, imperfect look.
The fifth floor features 18,000 square feet
of columnless gallery space-the largest of its kind
in New York-but the impact of that openness is not
realized in the initial exhibition in which the interior
is divided by numerous hanging walls for art. Still,
patrons are drawn to either end of the fifth floor,
where floor-to-ceiling glass and comfortable seating
offer views of the Hudson River and New Jersey
to the west and the city to the east.
That vista of the city is also the focus of
the outdoor terraces. Four levels of terraces are
accessible from the gallery floors on the eastern
edge of the building and can be traversed via
outdoor stairs. The terraces, which can
accommodate large outdoor sculptures, visually
and metaphorically connect the patrons to the
surrounding context. That was the intent, according
to Scott Newman, FAIA, a principal with Cooper
Robertson who worked closely with Piano. "Making
visual connections among the art, the city, and

across the river contextualizes the display rather
than distracts from it," Newman told Contract. "The
quality of the natural light and the ability to display
art outside on stepped elevated terraces enhances
the visitor experience."
On the third floor, the museum includes
a theater and performance space with a picture
window facing the Hudson River. Offices and
meeting areas for curators, conservators, and
preparators all have enviable views and are located
along the north and northwestern portions of upper
floors, within close proximity to the galleries.
"The offices and staff areas were designed to reinforce
the museum's commitment to artists and art,"
Newman says. "Design of the workspaces also
reflects that essential relationship with a vocabulary
of simple materials, such as plywood, and the
straightforward expression of building elements,
such as structural cross-bracing."
Designed for resilience
During construction, the museum and its design
team encountered what, in hindsight, was a
near-disaster: Hurricane Sandy. The storm struck
in fall 2012 when the steel framing was up, but

the building was not yet enclosed. While the ground
floor and the outdoor plaza had been designed
to consider the FEMA 500-year flood elevation,
the storm surge swept over that level and filled
the open basement with more than six million
gallons of water, according to Newman. "Since
the project was in a relatively early stage of
construction, we were able to redesign and renovate
the building with new flood protection elements to
harden the building against future storms and still
maintain the overall schedule," Newman says. "Given
the location, we had planned for the art to be
exhibited and stored on floor five and higher, so our
planning assumptions proved consistent with best
practices for resilient museum design."
Resilient. Pragmatically, that may be the
best word to describe the Whitney Museum design
in the context of severe storm possibilities. But
it is also apt in portraying this 84-year-old museum's
relationship to the changing, complicated city,
and the evolving view of what excellence in museum
design is today. Appropriately, it is a resilient
museum of American art. c

Curatorial offices along the
northwest edge of the museum
have portal-like windows with
views of the Hudson River and
New Jersey. Simple materials,
such as plywood, are used to
demarcate workspaces. The
two-level curatorial library
(far left) has upper-level
stacks and areas for meetings
or study one level below.

92

contractdesign.com

JUNE 2015


http://www.contractdesign.com

Contract - June 2015

Table of Contents for the Digital Edition of Contract - June 2015

Contract - June 2015
Contents
Editorial
Industry News
Columnist: Retaining the Next Generation of Leaders
At Home at Work
NeoConĀ® Preview
Whitney Museum of American Art
Volksbank
City of Rotterdam Municipal Offices
Index Ventures
Thumbtack
Designers Select: Seating
Sources
Ad Index
Preview: SHoP Architects and Studio O+A Design New Uber Headquarters
Contract - June 2015 - Intro
Contract - June 2015 - Contract - June 2015
Contract - June 2015 - Cover2
Contract - June 2015 - 1
Contract - June 2015 - 2
Contract - June 2015 - 3
Contract - June 2015 - 4
Contract - June 2015 - 5
Contract - June 2015 - 6
Contract - June 2015 - 7
Contract - June 2015 - Contents
Contract - June 2015 - 9
Contract - June 2015 - 10
Contract - June 2015 - 11
Contract - June 2015 - 12
Contract - June 2015 - 13
Contract - June 2015 - 14
Contract - June 2015 - 15
Contract - June 2015 - 16
Contract - June 2015 - 17
Contract - June 2015 - 18
Contract - June 2015 - 19
Contract - June 2015 - 20
Contract - June 2015 - 21
Contract - June 2015 - 22
Contract - June 2015 - 23
Contract - June 2015 - 24
Contract - June 2015 - 25
Contract - June 2015 - 26
Contract - June 2015 - 27
Contract - June 2015 - Editorial
Contract - June 2015 - 29
Contract - June 2015 - 30
Contract - June 2015 - 31
Contract - June 2015 - 32
Contract - June 2015 - 33
Contract - June 2015 - Industry News
Contract - June 2015 - 35
Contract - June 2015 - 36
Contract - June 2015 - 37
Contract - June 2015 - 38
Contract - June 2015 - 39
Contract - June 2015 - 40
Contract - June 2015 - 41
Contract - June 2015 - 42
Contract - June 2015 - 43
Contract - June 2015 - Columnist: Retaining the Next Generation of Leaders
Contract - June 2015 - 45
Contract - June 2015 - 46
Contract - June 2015 - 47
Contract - June 2015 - 48
Contract - June 2015 - 49
Contract - June 2015 - At Home at Work
Contract - June 2015 - 51
Contract - June 2015 - NeoConĀ® Preview
Contract - June 2015 - 53
Contract - June 2015 - 54
Contract - June 2015 - 55
Contract - June 2015 - 56
Contract - June 2015 - 57
Contract - June 2015 - 58
Contract - June 2015 - 59
Contract - June 2015 - 60
Contract - June 2015 - 61
Contract - June 2015 - 62
Contract - June 2015 - 63
Contract - June 2015 - 64
Contract - June 2015 - 65
Contract - June 2015 - 66
Contract - June 2015 - 67
Contract - June 2015 - 68
Contract - June 2015 - 69
Contract - June 2015 - 70
Contract - June 2015 - 71
Contract - June 2015 - 72
Contract - June 2015 - 73
Contract - June 2015 - 74
Contract - June 2015 - 75
Contract - June 2015 - 76
Contract - June 2015 - 77
Contract - June 2015 - 78
Contract - June 2015 - 79
Contract - June 2015 - 80
Contract - June 2015 - 81
Contract - June 2015 - 82
Contract - June 2015 - 83
Contract - June 2015 - 84
Contract - June 2015 - 85
Contract - June 2015 - Whitney Museum of American Art
Contract - June 2015 - 87
Contract - June 2015 - 88
Contract - June 2015 - 89
Contract - June 2015 - 90
Contract - June 2015 - 91
Contract - June 2015 - 92
Contract - June 2015 - 93
Contract - June 2015 - 94
Contract - June 2015 - 95
Contract - June 2015 - 96
Contract - June 2015 - 97
Contract - June 2015 - Volksbank
Contract - June 2015 - 99
Contract - June 2015 - 100
Contract - June 2015 - 101
Contract - June 2015 - 102
Contract - June 2015 - 103
Contract - June 2015 - 104
Contract - June 2015 - 105
Contract - June 2015 - City of Rotterdam Municipal Offices
Contract - June 2015 - 107
Contract - June 2015 - 108
Contract - June 2015 - 109
Contract - June 2015 - 110
Contract - June 2015 - 111
Contract - June 2015 - 112
Contract - June 2015 - 113
Contract - June 2015 - Index Ventures
Contract - June 2015 - 115
Contract - June 2015 - 116
Contract - June 2015 - 117
Contract - June 2015 - 118
Contract - June 2015 - 119
Contract - June 2015 - 120
Contract - June 2015 - 121
Contract - June 2015 - Thumbtack
Contract - June 2015 - 123
Contract - June 2015 - 124
Contract - June 2015 - 125
Contract - June 2015 - 126
Contract - June 2015 - 127
Contract - June 2015 - Designers Select: Seating
Contract - June 2015 - 129
Contract - June 2015 - Sources
Contract - June 2015 - 131
Contract - June 2015 - 132
Contract - June 2015 - 133
Contract - June 2015 - Ad Index
Contract - June 2015 - 135
Contract - June 2015 - Preview: SHoP Architects and Studio O+A Design New Uber Headquarters
Contract - June 2015 - Cover3
Contract - June 2015 - Cover4
https://www.nxtbook.com/nxtbooks/contract/202007
https://www.nxtbook.com/nxtbooks/contract/202006
https://www.nxtbook.com/nxtbooks/contract/20200405
https://www.nxtbook.com/nxtbooks/contract/20200203
https://www.nxtbook.com/nxtbooks/contract/202001
https://www.nxtbook.com/nxtbooks/contract/201912
https://www.nxtbook.com/nxtbooks/contract/201911
https://www.nxtbook.com/nxtbooks/contract/201910
https://www.nxtbook.com/nxtbooks/contract/womeninbusiness_2019
https://www.nxtbook.com/nxtbooks/contract/201909
https://www.nxtbook.com/nxtbooks/contract/201908
https://www.nxtbook.com/nxtbooks/contract/20190607
https://www.nxtbook.com/nxtbooks/contract/onpp-foresight_2019
https://www.nxtbook.com/nxtbooks/contract/201905
https://www.nxtbook.com/nxtbooks/contract/201904
https://www.nxtbook.com/nxtbooks/contract/201903
https://www.nxtbook.com/nxtbooks/contract/20190102
https://www.nxtbook.com/nxtbooks/contract/201812
https://www.nxtbook.com/nxtbooks/contract/womeninbusiness_2018
https://www.nxtbook.com/nxtbooks/contract/201811
https://www.nxtbook.com/nxtbooks/contract/201810
https://www.nxtbook.com/nxtbooks/contract/201809
https://www.nxtbook.com/nxtbooks/contract/20180708
https://www.nxtbook.com/nxtbooks/contract/201806
https://www.nxtbook.com/nxtbooks/contract/201805
https://www.nxtbook.com/nxtbooks/contract/201804
https://www.nxtbook.com/nxtbooks/contract/201803
https://www.nxtbook.com/nxtbooks/contract/20180102
https://www.nxtbook.com/nxtbooks/contract/201712
https://www.nxtbook.com/nxtbooks/contract/201711
https://www.nxtbook.com/nxtbooks/contract/201710
https://www.nxtbook.com/nxtbooks/contract/201709
https://www.nxtbook.com/nxtbooks/contract/2017neocon
https://www.nxtbook.com/nxtbooks/contract/20170708
https://www.nxtbook.com/nxtbooks/contract/201706
https://www.nxtbook.com/nxtbooks/contract/201705
https://www.nxtbook.com/nxtbooks/contract/201704
https://www.nxtbook.com/nxtbooks/contract/201703
https://www.nxtbook.com/nxtbooks/contract/20170102
https://www.nxtbook.com/nxtbooks/contract/201612
https://www.nxtbook.com/nxtbooks/contract/201611
https://www.nxtbook.com/nxtbooks/contract/201610
https://www.nxtbook.com/nxtbooks/contract/201609
https://www.nxtbook.com/nxtbooks/contract/2016neocon
https://www.nxtbook.com/nxtbooks/contract/201607
https://www.nxtbook.com/nxtbooks/contract/201606
https://www.nxtbook.com/nxtbooks/contract/201605
https://www.nxtbook.com/nxtbooks/contract/201604
https://www.nxtbook.com/nxtbooks/contract/201603
https://www.nxtbook.com/nxtbooks/contract/20160102
https://www.nxtbook.com/nxtbooks/contract/201512
https://www.nxtbook.com/nxtbooks/contract/201511
https://www.nxtbook.com/nxtbooks/contract/201510
https://www.nxtbook.com/nxtbooks/contract/201509
https://www.nxtbook.com/nxtbooks/contract/20150708
https://www.nxtbook.com/nxtbooks/contract/2015neocon
https://www.nxtbook.com/nxtbooks/contract/201506
https://www.nxtbook.com/nxtbooks/contract/201505
https://www.nxtbook.com/nxtbooks/contract/201504
https://www.nxtbook.com/nxtbooks/contract/201503
https://www.nxtbook.com/nxtbooks/contract/201501
https://www.nxtbook.com/nxtbooks/contract/201412
https://www.nxtbook.com/nxtbooks/contract/201411
https://www.nxtbook.com/nxtbooks/contract/201410
https://www.nxtbook.com/nxtbooks/contract/201409
https://www.nxtbook.com/nxtbooks/contract/2014neocon
https://www.nxtbook.com/nxtbooks/contract/20140708
https://www.nxtbook.com/nxtbooks/contract/201406
https://www.nxtbook.com/nxtbooks/contract/201405
https://www.nxtbook.com/nxtbooks/contract/201404
https://www.nxtbook.com/nxtbooks/contract/201403
https://www.nxtbook.com/nxtbooks/contract/iida_red2014
https://www.nxtbook.com/nxtbooks/contract/201401
https://www.nxtbook.com/nxtbooks/nielsen/contract_201312
https://www.nxtbook.com/nxtbooks/nielsen/contract_201311
https://www.nxtbook.com/nxtbooks/nielsen/contract_201310
https://www.nxtbook.com/nxtbooks/nielsen/contract_201310_v2
https://www.nxtbook.com/nxtbooks/nielsen/contract_201309
https://www.nxtbook.com/nxtbooks/nielsen/contract_20130708
https://www.nxtbook.com/nxtbooks/nielsen/contract_20130708_neocon_supplement
https://www.nxtbook.com/nxtbooks/nielsen/contract_201306
https://www.nxtbook.com/nxtbooks/nielsen/contract_201305
https://www.nxtbook.com/nxtbooks/nielsen/contract_201304
https://www.nxtbook.com/nxtbooks/nielsen/contract_201303
https://www.nxtbook.com/nxtbooks/nielsen/contract_20130102
https://www.nxtbook.com/nxtbooks/nielsen/contract_201212
https://www.nxtbook.com/nxtbooks/nielsen/contract_201211
https://www.nxtbook.com/nxtbooks/nielsen/contract_201210
https://www.nxtbook.com/nxtbooks/nielsen/contract_201209
https://www.nxtbook.com/nxtbooks/nielsen/contract_ncw_201208
https://www.nxtbook.com/nxtbooks/nielsen/contract_201208
https://www.nxtbook.com/nxtbooks/nielsen/contract_201206
https://www.nxtbook.com/nxtbooks/nielsen/contract_201205
https://www.nxtbook.com/nxtbooks/nielsen/contract_201204
https://www.nxtbook.com/nxtbooks/nielsen/contract_201203
https://www.nxtbook.com/nxtbooks/nielsen/contract_20120102
https://www.nxtbook.com/nxtbooks/nielsen/contract_20111112
https://www.nxtbook.com/nxtbooks/nielsen/contract_201110
https://www.nxtbook.com/nxtbooks/nielsen/contract_201109
https://www.nxtbook.com/nxtbooks/nielsen/contract_2011neoconwinners
https://www.nxtbook.com/nxtbooks/nielsen/contract_201108
https://www.nxtbook.com/nxtbooks/nielsen/contract_201106
https://www.nxtbook.com/nxtbooks/nielsen/contract_201105
https://www.nxtbook.com/nxtbooks/nielsen/contract_201104
https://www.nxtbook.com/nxtbooks/nielsen/contract_201103
https://www.nxtbook.com/nxtbooks/nielsen/contract_20110102
https://www.nxtbook.com/nxtbooks/nielsen/contract_20101112
https://www.nxtbook.com/nxtbooks/nielsen/contract_201010
https://www.nxtbook.com/nxtbooks/nielsen/contract_201009
https://www.nxtbook.com/nxtbooks/nielsen/contract_20100708
https://www.nxtbook.com/nxtbooks/nielsen/contract_201006
https://www.nxtbook.com/nxtbooks/nielsen/contract_201005
https://www.nxtbook.com/nxtbooks/nielsen/contract_201004
https://www.nxtbook.com/nxtbooks/nielsen/contract_201003
https://www.nxtbook.com/nxtbooks/nielsen/contract_20100102
https://www.nxtbook.com/nxtbooks/nielsen/contract_200911
https://www.nxtbook.com/nxtbooks/nielsen/contract_200909
https://www.nxtbook.com/nxtbooks/nielsen/contract_200910
https://www.nxtbook.com/nxtbooks/nielsen/contract_200908
https://www.nxtbook.com/nxtbooks/nielsen/contract_200907
https://www.nxtbook.com/nxtbooks/nielsen/contract_200906
https://www.nxtbook.com/nxtbooks/nielsen/contract_200905
https://www.nxtbook.com/nxtbooks/nielsen/contract_200904
https://www.nxtbook.com/nxtbooks/nielsen/contract_200903
https://www.nxtbook.com/nxtbooks/nielsen/contract_200902
https://www.nxtbook.com/nxtbooks/nielsen/contract_200901
https://www.nxtbookmedia.com