Contract - October 2015 - 106

sources

King Abdullah Specialty
Children's Hospital (page 54)
who Architect and interior
designer: Perkins+Will. Architect
of record: Dar Al-Handasah.
Architecture project team: Robert
Jones Lindgren, AIA, James H.
Smith, AIA, Diedra Woodring, AIA,
Dawn Mixon-Bennett, AIA. Interior
design project team: Amy Sickeler,
Brenda Smith, IIDA. Contractor:
Saudi Binladen Group.
Engineering: Dar Al-Handasah.
Landscape design: Perkins+Will.
Graphics: Perkins+Will.
what Wallcoverings: MDC, digital
print Ecore wallcovering. Paint:
Benjamin Moore; Roberts Paint.
Laminate: Abet Laminati;
Nevamar; Wilsonart. Drywall:
USG. Movable wall: Skyfold. Hard
flooring: Traco marble and
granite; Emperador Light;
Meadowlark; White Thassos;
Lapis Lazuli; Giallo Sienna.
Resinous flooring: Stonehard.
Resilient flooring: Forbo
Linoleum; Mondo Rubber.
Carpet/carpet tile: Tandus
Centiva, broadloom; Interface,
carpet tile; Shaw Contract Group,
carpet tile. Ceiling: Armstrong.
Lighting: Focal Point; Fail-safe;
Zumtobel. Task/fluorescent/
industrial/exterior lighting:
Philips. Floor/table lamps:
Artemide. Pendants/chandeliers:
local art source, custom
chandelier. Architectural glass/
glazing/decorative panels/
partitions: 3form. Window
treatments: Mechoshade.
Workstations: Teknion. Lounge/
reception seating: Davis; Moroso;
Nienkamper; Bernhardt;
Coalesse. Patient seating:
Carolina Business Furniture.
Cafeteria/dining seating: Davis.
Auditorium seating: Sedia
Systems. Upholstery: Arc-Com;
Maharam; Unika Vaev;
Designtex; Knoll. Conference
tables: local source. Cafeteria/
dining tables: Orange Box.
Reception desk: custom millwork.
Side tables: Davis. Files: Teknion.
Shelving: Metro Shelving.
Drawers/case goods: Teknion.
Plumbing fixtures/fittings:
Kohler; RAK. Textile treatments/
finishes: Crypton; Nano-Tex.
Kaiser Permanente Kraemer
Radiation Oncology Center
(page 62)
who Architect: Yazdani Studio
of CannonDesign. Architecture
project team: Mehrdad Yazdani,
design principal and lead
designer; Carlos Amato, AIA,
principal and lead medical
planner; Kevin Spady, AIA,
principal and project manager.
Project team: Hansol Park, AIA,
Jennifer Ries, Jessica Yi, Jack

106

Poulin, IIDA, Jenny Tse, Jay
Whisenant, AIA, Joe O'Neill, AIA,
Harold Sibley, AIA. Contractor:
Turner Construction. Lighting:
Atelier Ten. Engineer: RBF
Engineering, civil; Mazzetti Nash
Lipseyburch, M/P; DPB
Engineering, Inc., electrical; John
A. Martin & Associates, structural.
Landscape architect: AHBE
Landscape Architects. Security:
Guidepost Solutions.
what Paint: Dunn Edwards.
Laminate: Pionite; Neuamar;
Wilsonart. Polycarbonate panels:
3form. Wood veneer walls: Kaiser
Vernon. Hard flooring: Corrodini,
terrazzo. Tile: Crossville. Resilient
flooring: Forbo. Carpet/carpet
tile: J+J Invision. Ceiling:
Armstrong. Recessed lighting:
Lithonia. Exterior lighting:
Spectra; Bega; Gardco. Curtain
wall: Bagatelos Architectural
Glass Systems, Inc. Window
treatments: Mechoshade.
Workstations: Steelcase;
Tangram Interiors. Workstation/
task/conference seating:
Steelcase. Lounge/reception
seating: Coalesse. Patient
seating: Steelcase. Cafeteria/
dining seating: Steelcase.
Upholstery: Designtex; Maharam.
Conference/cafeteria/dining/
side tables: Coalesse. Files/
shelving: Steelcase. Lockers/
cubbies: Steelcase. Cubical
curtains upholstery: Maharam.
Architectural/custom
woodworking: Kaiser Vernon.
Plumbing fixtures/fittings:
Kohler; American Standard.
UNC Hospitals Hillsborough
Campus (page 68)
who Architect and interior
designer: ZGF Architects.
Associate architect: BJAC/EYP.
Contractor: Skanska. Lighting:
Affiliated Engineers, Inc. Medical
equipment planner: Walsh
Consulting Group, Inc.
Engineering: Affiliated Engineers,
Inc., MEP; Stewart Engineering,
Inc., structural; Summit Design
and Engineering Services, PLLC,
civil. Kitchen: SSA Food Service
Design + Consulting. Landscape:
Sears Design Group. Graphics:
SignCraft Solutions, wayfinding
signage. Cost estimator:
Vermeulens Cost Consultants.
what Paint: Sherwin Williams.
Laminate: Wilsonart; Formica;
Laminart; Trespa. Drywall:
National Gypsum Company.
Masonry walls: Oldcastle-Adams,
CMU; Taylor Clay Products, Inc.,
face brick. Movable walls:
Modernfold. Cross-corridor fire
doors: McKeon Door Co., fire
shutter and fire curtain;
Won-Door Corporation, folding
fire partition. Hard flooring: David

Allen Company, epoxy terrazzo;
Dex-O-Tex and Stonhard,
fluid-applied; Daltile, quarry tile,
ceramic tile, porcelain tile.
Resilient flooring: Johnsonite,
Burke, Roppe, wall base; Gerbert
Polyflor, sheet vinyl; Armstrong,
vinyl tile; Forbo, linoluem sheet
(wall protection); Mannington,
Armstrong, luxury vinyl tile. ECO
Surfaces, rubber flooring; USF
Contract, cork. Carpet/carpet
tile: Tandus Centiva; Mannington.
Ceiling: Armstrong; Ceilings Plus.
Other decorative: Lumivisions,
illuminated graphic panels.
Hardware: Ingersoll Rand, LCN,
Ives, Schlage; ASSA ABLOY Von
Duprin, Corbin Russwin; Horton;
and others. Doors: Steelcraft,
steel doors; VT Industries, wood
doors; Besam/ASSA ABLOY,
sliding entrance and ICU doors.
Architectural glass/glazing:
Oldcastle Building Envelope,
curtain wall and storefront;
Dorma, all-glass doors and walls.
Decorative glass panels/
partitions: Skyline Design;
Livinglass. Window treatments:
Hunter Douglas. Workstations:
STORR Office Environments;
Steelcase, Answer/Universal
systems products. Workstation/
task seating: Global, Roma;
Steelcase, Cachet. Conference
seating: Safco, Sassy Lounge/
reception seating: Carolina
Business Furniture, Voyage,
Retrospect, Silver Ion. Patient
seating: Carolina Business
Furniture, Orchestra, Retrospect.
Cafeteria/dining seating: Falcon.
Other seating: Gunlocke, Molti;
Steelcase, Sorrel; Studio Q,
Beacon; FurnitureLab, Venus
booths. Upholstery: Arc-Com;
CF Stinson; Momentum. Tables:
STORR Office Environments.
Conference tables: First Office,
Applause. Cafeteria/dining
tables: FurnitureLab. Training
tables: First Office, Applause.
Reception desk: provided by
Skanska. Side/other tables:
Carolina Business Furniture,
Embrace. Files/shelving:
Steelcase. Lockers/cubbies:
Republic Storage Systems, LLC.,
metal lockers; Ideal Products, Inc.,
wood lockers. Drawers/case
goods: First Office, Staks.
Architectural/custom
woodworking: Blankenship
Associates, Inc.; SJ Morse.
Planters/accessories: Landscape
Forms; Jay Scotts. Signage:
Craven Sign Services, Inc.
Palo Alto Medical Foundation
San Carlos Center (page 72)
who Architect and interior
designer: NBBJ. Architecture
project team: Dale Alberta,
Kimball Bergerud, CJ Brockway,

Mary Butenschon, Rich Dallam,
Barb Gipple, Jon Gray, Jay
Halleran, Mas Haruyama, Chad
Harnish, Dylan Henry, Wayne
Hiranaka, Chuck Jackson,
Euiseok Jeong, Ross Leventhal,
Craig Matheny, Andrew
Molchany, Rob Murray, Angela
O'Brien-Ruff, John Pangrazio, Bill
Parker, Larry Parrett, Matt Powell,
Jesse Prince, Celeste Robinette,
Robert Seelenbacher, Lynne
Shira, Larry Smith, Dave Swain,
Kimberly Taylor, Diane
Vondruska, William Wagner,
Emily Wong-Suh. Interior design
project team: Dale Alberta, Josie
Briggs, Shannon Coughlin, Rich
Dallam, Katie Davis, Ashlee
Holtman, Diane Lasko, Diane
Lindberg-Nigh, Pete Lorimer,
Anna McCune, Sarah Oliver, Tara
Schneider, Rysia Suchecka,
Christina Yates. Contractor:
Skanska. Lighting: NBBJ.
Engineering: KPFF, structural;
Mazzetti, MEP; BKF Engineers,
civil. Landscape: Office of Cheryl
Barton. Graphics: NBBJ; Weidner
Signage. Acoustician: Sparling.
Environmental graphic design:
Kate Keating Associates.
Medical equipment planning:
NBBJ. Lab planning: Strategic
Facilities Planning. Glazing/metal
panels/sunshades, custom laser
cut steel bridge canopy/interior
glass and mirrors: Royal Glass.
Framing/drywall/plaster: KHS&S.
Custom casework and wood
paneling: Mission Bell. Structural
steel and stairs: Schuff Steel.
Mechanical trade partner:
Southland Industries. Electrical
trade partner: Redwood Electric
Group. Doors/frames/hardware
trade partner: Walters & Wolf
Interiors. Site work and
landscaping trade partner:
McGuire & Hester. Roofing trade
partner: Alliance Roofing Co., Inc.
Concrete: Charles Pankow
Builders, Ltd. Fire protection:
Superior Automatic Sprinkler
Company. Furniture dealer:
One Workplace.
what Paint: Benjamin Moore;
A & B Painting. Masonry walls:
Colorado Stone Company. Wood
walls: Terramai. Movable walls:
DIRTT. Column wrap: Alpi. Wall
protection: Acrovyn. Custom
troweled wall: KHS&S. Hard
flooring: Kaswell Flooring; Daltile.
Resilient flooring: Forbo; Nora.
Carpet/carpet tile: Shaw
Contract Group. Stone cladding
and tile floors: Superior Tile.
Flooring: RE Cuddie, resilient
flooring, carpet, base. Ceiling:
Armstrong; San Francisco
Interiors, acoustical ceilings and
reclaimed redwood soffits.
Stretched fabric ceiling: Clipso;
Maharam. Custom metal ceiling:

Pohl Inc. of America. Recessed
lighting: Tech Lighting; Kirlin;
Portfolio; Gotham; Spectrum;
Intense. Track lighting: Edison
Price. Task lighting: H.E. Williams.
Fluorescent/industrial: Kennal;
Vista; Litecontrol; Alight;
Lithonia; Columbia; Pinnacle;
Prudential; iO; Belfer. Pendants/
chandeliers: 3form LightArt;
Shaper; Ledalite. Sconces: Rezek;
Insight. Other decorative:
Electric Mirror. Exterior lighting:
Beta LED; Visionaire; Lithonia;
Rebelle; Bronzelite; Winoona;
Insight; Bega; Gardco; Hydrel;
Targetti, Shaper; Celestial;
Fail-safe; Lumiere. Sliding
aluminum glass doors: Raumplus
North America. Sliding ICU
doors: Horton Automatics.
Architectural glass/glazing: PPG,
SolarBan 70XL. Decorative glass
panels/partitions: Skyline
Design; Creative Central; 3form;
Peter David. Workstations:
Steelcase; One Workplace.
Workstation/task/conference
seating: Steelcase. Lounge/
reception seating: Steelcase;
Flexform; Brent Comber; Martin
Brattrud. Patient seating:
Steelcase. Custom bench at
bridge: Woodtech, live edge.
Upholstery: Architex;
Ultrafabrics; Carnegie; Sina
Pearson; Edelman Leather;
Maharam; Arc-Com;
Spinneybeck Leather. Exam
room chairs: Steelcase.
Literature holder: Takeform.
Accessories organizer: Takeform.
Computer accessories:
Humanscale. Cubicle curtain:
Carnegie. Conference/training/
side tables: Steelcase. Reception
desk: Casework. Other tables:
Brent Comber. Files: Steelcase.
Shelving: Woodtech; Steelcase.
Lockers/cubbies: Steelcase
Health. Architectural/custom
woodworking: Woodtech;
Richlite. Accessories: Landscape
Forms, exterior bench. Window
shades: Peninsulators. Modular
casework: Carleton Group,
Midmark. Interior accessories:
Rebarber. Medical equipment:
Philips, imaging. Medical
equipment: Stryker, surgery.
Niche photography: Sean Airhart,
Rob Murray.
Memorial Sloan Kettering
Cancer Center: West Harrison
(page 82)
who Architect: EwingCole.
Architecture project team:
Andrew Jarvis, principal-incharge; Mary Frazier, managing
principal and healthcare planner;
Oscar Gomes, project manager;
Saul Jabbawy, project designer;
Carl Speroff, lighting designer;
continued on page 108

contractdesign.com

OCTOBER 2015


http://www.contractdesign.com

Contract - October 2015

Table of Contents for the Digital Edition of Contract - October 2015

Contract - October 2015
Contents
Editorial
Industry News
Columnist: Building a Purpose-driven Practice
Product Focus: Waiting Patiently
Healthcare Design Expo Product Preview
Healthcare Design Expo Product Preview
Kaiser Permanente Kraemer Radiation Oncology Center
UNC Hospitals Hillsborough Campus
Palo Alto Medical Foundation San Carlos Center
2015 Healthcare Environment Awards
Ambulatory Care Winner
Ambulatory Care Honorable Mention
Acute Care Winner: Meander Medisch Centrum
Acute Care Winner: Roberts Pavilion Floors 8 and 9
Long-Term Care Winner
Conceptual Design Honorable Mention
Student Winner and Honorable Mention
Book Review: Modern Clinic Design: Strategies for an Era of Change
Designers Select: Healthcare
Sources
Ad Index
Installation: Vibrant Mosaics Greet Visitors to the Newest New York Subway Entrance
Contract - October 2015 - Intro
Contract - October 2015 - Contract - October 2015
Contract - October 2015 - Cover2
Contract - October 2015 - 1
Contract - October 2015 - 2
Contract - October 2015 - 3
Contract - October 2015 - 4
Contract - October 2015 - 5
Contract - October 2015 - Contents
Contract - October 2015 - 7
Contract - October 2015 - 8
Contract - October 2015 - 9
Contract - October 2015 - 10
Contract - October 2015 - 11
Contract - October 2015 - 12
Contract - October 2015 - 13
Contract - October 2015 - 14
Contract - October 2015 - 15
Contract - October 2015 - 16
Contract - October 2015 - 17
Contract - October 2015 - 18
Contract - October 2015 - 19
Contract - October 2015 - Editorial
Contract - October 2015 - 21
Contract - October 2015 - 22
Contract - October 2015 - 23
Contract - October 2015 - 24
Contract - October 2015 - Industry News
Contract - October 2015 - 26
Contract - October 2015 - 27
Contract - October 2015 - 28
Contract - October 2015 - 29
Contract - October 2015 - 30
Contract - October 2015 - 31
Contract - October 2015 - Columnist: Building a Purpose-driven Practice
Contract - October 2015 - 33
Contract - October 2015 - 34
Contract - October 2015 - 35
Contract - October 2015 - Product Focus: Waiting Patiently
Contract - October 2015 - 37
Contract - October 2015 - Healthcare Design Expo Product Preview
Contract - October 2015 - 39
Contract - October 2015 - 40
Contract - October 2015 - 41
Contract - October 2015 - 42
Contract - October 2015 - 43
Contract - October 2015 - 44
Contract - October 2015 - 45
Contract - October 2015 - 46
Contract - October 2015 - 47
Contract - October 2015 - 48
Contract - October 2015 - 49
Contract - October 2015 - 50
Contract - October 2015 - 51
Contract - October 2015 - 52
Contract - October 2015 - 53
Contract - October 2015 - Healthcare Design Expo Product Preview
Contract - October 2015 - 55
Contract - October 2015 - 56
Contract - October 2015 - 57
Contract - October 2015 - 58
Contract - October 2015 - 59
Contract - October 2015 - 60
Contract - October 2015 - 61
Contract - October 2015 - Kaiser Permanente Kraemer Radiation Oncology Center
Contract - October 2015 - 63
Contract - October 2015 - 64
Contract - October 2015 - 65
Contract - October 2015 - 66
Contract - October 2015 - 67
Contract - October 2015 - UNC Hospitals Hillsborough Campus
Contract - October 2015 - 69
Contract - October 2015 - 70
Contract - October 2015 - 71
Contract - October 2015 - Palo Alto Medical Foundation San Carlos Center
Contract - October 2015 - 73
Contract - October 2015 - 74
Contract - October 2015 - 75
Contract - October 2015 - 76
Contract - October 2015 - 77
Contract - October 2015 - 78
Contract - October 2015 - 79
Contract - October 2015 - 80
Contract - October 2015 - 2015 Healthcare Environment Awards
Contract - October 2015 - Ambulatory Care Winner
Contract - October 2015 - 83
Contract - October 2015 - 84
Contract - October 2015 - 85
Contract - October 2015 - 86
Contract - October 2015 - 87
Contract - October 2015 - Ambulatory Care Honorable Mention
Contract - October 2015 - 89
Contract - October 2015 - 90
Contract - October 2015 - 91
Contract - October 2015 - Acute Care Winner: Meander Medisch Centrum
Contract - October 2015 - 93
Contract - October 2015 - Acute Care Winner: Roberts Pavilion Floors 8 and 9
Contract - October 2015 - 95
Contract - October 2015 - Long-Term Care Winner
Contract - October 2015 - 97
Contract - October 2015 - Conceptual Design Honorable Mention
Contract - October 2015 - 99
Contract - October 2015 - Student Winner and Honorable Mention
Contract - October 2015 - 101
Contract - October 2015 - Book Review: Modern Clinic Design: Strategies for an Era of Change
Contract - October 2015 - 103
Contract - October 2015 - Designers Select: Healthcare
Contract - October 2015 - 105
Contract - October 2015 - Sources
Contract - October 2015 - 107
Contract - October 2015 - 108
Contract - October 2015 - 109
Contract - October 2015 - Ad Index
Contract - October 2015 - 111
Contract - October 2015 - Installation: Vibrant Mosaics Greet Visitors to the Newest New York Subway Entrance
Contract - October 2015 - Cover3
Contract - October 2015 - Cover4
https://www.nxtbook.com/nxtbooks/contract/202007
https://www.nxtbook.com/nxtbooks/contract/202006
https://www.nxtbook.com/nxtbooks/contract/20200405
https://www.nxtbook.com/nxtbooks/contract/20200203
https://www.nxtbook.com/nxtbooks/contract/202001
https://www.nxtbook.com/nxtbooks/contract/201912
https://www.nxtbook.com/nxtbooks/contract/201911
https://www.nxtbook.com/nxtbooks/contract/201910
https://www.nxtbook.com/nxtbooks/contract/womeninbusiness_2019
https://www.nxtbook.com/nxtbooks/contract/201909
https://www.nxtbook.com/nxtbooks/contract/201908
https://www.nxtbook.com/nxtbooks/contract/20190607
https://www.nxtbook.com/nxtbooks/contract/onpp-foresight_2019
https://www.nxtbook.com/nxtbooks/contract/201905
https://www.nxtbook.com/nxtbooks/contract/201904
https://www.nxtbook.com/nxtbooks/contract/201903
https://www.nxtbook.com/nxtbooks/contract/20190102
https://www.nxtbook.com/nxtbooks/contract/201812
https://www.nxtbook.com/nxtbooks/contract/womeninbusiness_2018
https://www.nxtbook.com/nxtbooks/contract/201811
https://www.nxtbook.com/nxtbooks/contract/201810
https://www.nxtbook.com/nxtbooks/contract/201809
https://www.nxtbook.com/nxtbooks/contract/20180708
https://www.nxtbook.com/nxtbooks/contract/201806
https://www.nxtbook.com/nxtbooks/contract/201805
https://www.nxtbook.com/nxtbooks/contract/201804
https://www.nxtbook.com/nxtbooks/contract/201803
https://www.nxtbook.com/nxtbooks/contract/20180102
https://www.nxtbook.com/nxtbooks/contract/201712
https://www.nxtbook.com/nxtbooks/contract/201711
https://www.nxtbook.com/nxtbooks/contract/201710
https://www.nxtbook.com/nxtbooks/contract/201709
https://www.nxtbook.com/nxtbooks/contract/2017neocon
https://www.nxtbook.com/nxtbooks/contract/20170708
https://www.nxtbook.com/nxtbooks/contract/201706
https://www.nxtbook.com/nxtbooks/contract/201705
https://www.nxtbook.com/nxtbooks/contract/201704
https://www.nxtbook.com/nxtbooks/contract/201703
https://www.nxtbook.com/nxtbooks/contract/20170102
https://www.nxtbook.com/nxtbooks/contract/201612
https://www.nxtbook.com/nxtbooks/contract/201611
https://www.nxtbook.com/nxtbooks/contract/201610
https://www.nxtbook.com/nxtbooks/contract/201609
https://www.nxtbook.com/nxtbooks/contract/2016neocon
https://www.nxtbook.com/nxtbooks/contract/201607
https://www.nxtbook.com/nxtbooks/contract/201606
https://www.nxtbook.com/nxtbooks/contract/201605
https://www.nxtbook.com/nxtbooks/contract/201604
https://www.nxtbook.com/nxtbooks/contract/201603
https://www.nxtbook.com/nxtbooks/contract/20160102
https://www.nxtbook.com/nxtbooks/contract/201512
https://www.nxtbook.com/nxtbooks/contract/201511
https://www.nxtbook.com/nxtbooks/contract/201510
https://www.nxtbook.com/nxtbooks/contract/201509
https://www.nxtbook.com/nxtbooks/contract/20150708
https://www.nxtbook.com/nxtbooks/contract/2015neocon
https://www.nxtbook.com/nxtbooks/contract/201506
https://www.nxtbook.com/nxtbooks/contract/201505
https://www.nxtbook.com/nxtbooks/contract/201504
https://www.nxtbook.com/nxtbooks/contract/201503
https://www.nxtbook.com/nxtbooks/contract/201501
https://www.nxtbook.com/nxtbooks/contract/201412
https://www.nxtbook.com/nxtbooks/contract/201411
https://www.nxtbook.com/nxtbooks/contract/201410
https://www.nxtbook.com/nxtbooks/contract/201409
https://www.nxtbook.com/nxtbooks/contract/2014neocon
https://www.nxtbook.com/nxtbooks/contract/20140708
https://www.nxtbook.com/nxtbooks/contract/201406
https://www.nxtbook.com/nxtbooks/contract/201405
https://www.nxtbook.com/nxtbooks/contract/201404
https://www.nxtbook.com/nxtbooks/contract/201403
https://www.nxtbook.com/nxtbooks/contract/iida_red2014
https://www.nxtbook.com/nxtbooks/contract/201401
https://www.nxtbook.com/nxtbooks/nielsen/contract_201312
https://www.nxtbook.com/nxtbooks/nielsen/contract_201311
https://www.nxtbook.com/nxtbooks/nielsen/contract_201310
https://www.nxtbook.com/nxtbooks/nielsen/contract_201310_v2
https://www.nxtbook.com/nxtbooks/nielsen/contract_201309
https://www.nxtbook.com/nxtbooks/nielsen/contract_20130708
https://www.nxtbook.com/nxtbooks/nielsen/contract_20130708_neocon_supplement
https://www.nxtbook.com/nxtbooks/nielsen/contract_201306
https://www.nxtbook.com/nxtbooks/nielsen/contract_201305
https://www.nxtbook.com/nxtbooks/nielsen/contract_201304
https://www.nxtbook.com/nxtbooks/nielsen/contract_201303
https://www.nxtbook.com/nxtbooks/nielsen/contract_20130102
https://www.nxtbook.com/nxtbooks/nielsen/contract_201212
https://www.nxtbook.com/nxtbooks/nielsen/contract_201211
https://www.nxtbook.com/nxtbooks/nielsen/contract_201210
https://www.nxtbook.com/nxtbooks/nielsen/contract_201209
https://www.nxtbook.com/nxtbooks/nielsen/contract_ncw_201208
https://www.nxtbook.com/nxtbooks/nielsen/contract_201208
https://www.nxtbook.com/nxtbooks/nielsen/contract_201206
https://www.nxtbook.com/nxtbooks/nielsen/contract_201205
https://www.nxtbook.com/nxtbooks/nielsen/contract_201204
https://www.nxtbook.com/nxtbooks/nielsen/contract_201203
https://www.nxtbook.com/nxtbooks/nielsen/contract_20120102
https://www.nxtbook.com/nxtbooks/nielsen/contract_20111112
https://www.nxtbook.com/nxtbooks/nielsen/contract_201110
https://www.nxtbook.com/nxtbooks/nielsen/contract_201109
https://www.nxtbook.com/nxtbooks/nielsen/contract_2011neoconwinners
https://www.nxtbook.com/nxtbooks/nielsen/contract_201108
https://www.nxtbook.com/nxtbooks/nielsen/contract_201106
https://www.nxtbook.com/nxtbooks/nielsen/contract_201105
https://www.nxtbook.com/nxtbooks/nielsen/contract_201104
https://www.nxtbook.com/nxtbooks/nielsen/contract_201103
https://www.nxtbook.com/nxtbooks/nielsen/contract_20110102
https://www.nxtbook.com/nxtbooks/nielsen/contract_20101112
https://www.nxtbook.com/nxtbooks/nielsen/contract_201010
https://www.nxtbook.com/nxtbooks/nielsen/contract_201009
https://www.nxtbook.com/nxtbooks/nielsen/contract_20100708
https://www.nxtbook.com/nxtbooks/nielsen/contract_201006
https://www.nxtbook.com/nxtbooks/nielsen/contract_201005
https://www.nxtbook.com/nxtbooks/nielsen/contract_201004
https://www.nxtbook.com/nxtbooks/nielsen/contract_201003
https://www.nxtbook.com/nxtbooks/nielsen/contract_20100102
https://www.nxtbook.com/nxtbooks/nielsen/contract_200911
https://www.nxtbook.com/nxtbooks/nielsen/contract_200909
https://www.nxtbook.com/nxtbooks/nielsen/contract_200910
https://www.nxtbook.com/nxtbooks/nielsen/contract_200908
https://www.nxtbook.com/nxtbooks/nielsen/contract_200907
https://www.nxtbook.com/nxtbooks/nielsen/contract_200906
https://www.nxtbook.com/nxtbooks/nielsen/contract_200905
https://www.nxtbook.com/nxtbooks/nielsen/contract_200904
https://www.nxtbook.com/nxtbooks/nielsen/contract_200903
https://www.nxtbook.com/nxtbooks/nielsen/contract_200902
https://www.nxtbook.com/nxtbooks/nielsen/contract_200901
https://www.nxtbookmedia.com