Contract - October 2015 - 75

PHOTOGRAPHY: SEAN AIRHART/NBBJ (OPPOSITE, MIDDLE LEFT); BRUCE DAMONTE (ALL OTHERS)

A pendant fixture by LightArt
"Bringing the outside in" is not typically a concept associated
hangs above the reception
with healthcare design. That may change with the arrival
desk (top right), which
of
more medical facilities such as the Sutter Health/Palo Alto
is wrapped with Richlite
paneling with a CNC-milled
Medical Foundation (PAMF) clinic in the San Francisco Bay
pattern. Some waiting areas
Area. Designed by global firm NBBJ, the 198,000-square-foot
are bright and airy (above),
San Carlos Center emphasizes the beauty of the natural
while those for the diagnostic
imaging clinic (above right)-
world, providing a sense of well-being right from the entrance.
where patients often sit in
It's likely the only medical center in the world to have
robes and drink bad-tasting
a
45-foot-long, live-edge bench-a single continuous slice
liquids for imaging purposes-
are dimly lit and hung with
from the trunk of a native Claro walnut tree.
dark curtains. A custom
"We were trying to create an environment that exudes
45-foot-long, live-edge bench
healing
for people," says Josie Briggs, a senior associate at NBBJ.
(opposite, top two) lines
one side of the glass-walled
"The design celebrates natural light and honest materials."
corridor, which overlooks
PAMF needed a new facility to serve a rapidly
gardens (opposite, bottom).
growing
population along the San Francisco Peninsula,
Redwood-lined overhangs
(opposite, middle right)
and it commissioned NBBJ to design a medical complex that
warmly greet patients
would accommodate 100 physicians. The facility occupies
and visitors.

a prominent 18-acre property that separates downtown
San Carlos from the area's main freeway. PAMF asked the
designers to find an architectural style for the four-level
clinic that would speak to the local community. The result

is contemporary yet warm and non-institutional, thanks
to influences that include California Mission style, evident
in the center's tan Santa Barbara stucco finish, and mountain
lodges, recalled by the redwood-lined overhangs and cleft-cut
sandstone walls.
"First and foremost, we wanted to give patients the
feeling that they'd come to the right place. We wanted to make
it comfortable and not threatening," says David Jury, PAMF's
vice president of support services and facilities development.

Transparency and natural touches
The building emphasizes transparency throughout, with
significant natural light that also aids in wayfinding. The
parking garage has a lofty, glassed-in staircase that encourages
patients to use the stairs and allows them to easily determine
where they need to go. The expansive 3,570-square-foot
reception area and adjoining 1,130-car garage were designed
to also serve a hospital building, postponed to a later phase
of construction. The lobby's back wall is covered in massive,
end-block reclaimed Douglas fir, allowing the space to feel
more like a hospitality interior. Around the corner, the wood

contract



Contract - October 2015

Table of Contents for the Digital Edition of Contract - October 2015

Contract - October 2015
Contents
Editorial
Industry News
Columnist: Building a Purpose-driven Practice
Product Focus: Waiting Patiently
Healthcare Design Expo Product Preview
Healthcare Design Expo Product Preview
Kaiser Permanente Kraemer Radiation Oncology Center
UNC Hospitals Hillsborough Campus
Palo Alto Medical Foundation San Carlos Center
2015 Healthcare Environment Awards
Ambulatory Care Winner
Ambulatory Care Honorable Mention
Acute Care Winner: Meander Medisch Centrum
Acute Care Winner: Roberts Pavilion Floors 8 and 9
Long-Term Care Winner
Conceptual Design Honorable Mention
Student Winner and Honorable Mention
Book Review: Modern Clinic Design: Strategies for an Era of Change
Designers Select: Healthcare
Sources
Ad Index
Installation: Vibrant Mosaics Greet Visitors to the Newest New York Subway Entrance
Contract - October 2015 - Intro
Contract - October 2015 - Contract - October 2015
Contract - October 2015 - Cover2
Contract - October 2015 - 1
Contract - October 2015 - 2
Contract - October 2015 - 3
Contract - October 2015 - 4
Contract - October 2015 - 5
Contract - October 2015 - Contents
Contract - October 2015 - 7
Contract - October 2015 - 8
Contract - October 2015 - 9
Contract - October 2015 - 10
Contract - October 2015 - 11
Contract - October 2015 - 12
Contract - October 2015 - 13
Contract - October 2015 - 14
Contract - October 2015 - 15
Contract - October 2015 - 16
Contract - October 2015 - 17
Contract - October 2015 - 18
Contract - October 2015 - 19
Contract - October 2015 - Editorial
Contract - October 2015 - 21
Contract - October 2015 - 22
Contract - October 2015 - 23
Contract - October 2015 - 24
Contract - October 2015 - Industry News
Contract - October 2015 - 26
Contract - October 2015 - 27
Contract - October 2015 - 28
Contract - October 2015 - 29
Contract - October 2015 - 30
Contract - October 2015 - 31
Contract - October 2015 - Columnist: Building a Purpose-driven Practice
Contract - October 2015 - 33
Contract - October 2015 - 34
Contract - October 2015 - 35
Contract - October 2015 - Product Focus: Waiting Patiently
Contract - October 2015 - 37
Contract - October 2015 - Healthcare Design Expo Product Preview
Contract - October 2015 - 39
Contract - October 2015 - 40
Contract - October 2015 - 41
Contract - October 2015 - 42
Contract - October 2015 - 43
Contract - October 2015 - 44
Contract - October 2015 - 45
Contract - October 2015 - 46
Contract - October 2015 - 47
Contract - October 2015 - 48
Contract - October 2015 - 49
Contract - October 2015 - 50
Contract - October 2015 - 51
Contract - October 2015 - 52
Contract - October 2015 - 53
Contract - October 2015 - Healthcare Design Expo Product Preview
Contract - October 2015 - 55
Contract - October 2015 - 56
Contract - October 2015 - 57
Contract - October 2015 - 58
Contract - October 2015 - 59
Contract - October 2015 - 60
Contract - October 2015 - 61
Contract - October 2015 - Kaiser Permanente Kraemer Radiation Oncology Center
Contract - October 2015 - 63
Contract - October 2015 - 64
Contract - October 2015 - 65
Contract - October 2015 - 66
Contract - October 2015 - 67
Contract - October 2015 - UNC Hospitals Hillsborough Campus
Contract - October 2015 - 69
Contract - October 2015 - 70
Contract - October 2015 - 71
Contract - October 2015 - Palo Alto Medical Foundation San Carlos Center
Contract - October 2015 - 73
Contract - October 2015 - 74
Contract - October 2015 - 75
Contract - October 2015 - 76
Contract - October 2015 - 77
Contract - October 2015 - 78
Contract - October 2015 - 79
Contract - October 2015 - 80
Contract - October 2015 - 2015 Healthcare Environment Awards
Contract - October 2015 - Ambulatory Care Winner
Contract - October 2015 - 83
Contract - October 2015 - 84
Contract - October 2015 - 85
Contract - October 2015 - 86
Contract - October 2015 - 87
Contract - October 2015 - Ambulatory Care Honorable Mention
Contract - October 2015 - 89
Contract - October 2015 - 90
Contract - October 2015 - 91
Contract - October 2015 - Acute Care Winner: Meander Medisch Centrum
Contract - October 2015 - 93
Contract - October 2015 - Acute Care Winner: Roberts Pavilion Floors 8 and 9
Contract - October 2015 - 95
Contract - October 2015 - Long-Term Care Winner
Contract - October 2015 - 97
Contract - October 2015 - Conceptual Design Honorable Mention
Contract - October 2015 - 99
Contract - October 2015 - Student Winner and Honorable Mention
Contract - October 2015 - 101
Contract - October 2015 - Book Review: Modern Clinic Design: Strategies for an Era of Change
Contract - October 2015 - 103
Contract - October 2015 - Designers Select: Healthcare
Contract - October 2015 - 105
Contract - October 2015 - Sources
Contract - October 2015 - 107
Contract - October 2015 - 108
Contract - October 2015 - 109
Contract - October 2015 - Ad Index
Contract - October 2015 - 111
Contract - October 2015 - Installation: Vibrant Mosaics Greet Visitors to the Newest New York Subway Entrance
Contract - October 2015 - Cover3
Contract - October 2015 - Cover4
https://www.nxtbook.com/nxtbooks/contract/202007
https://www.nxtbook.com/nxtbooks/contract/202006
https://www.nxtbook.com/nxtbooks/contract/20200405
https://www.nxtbook.com/nxtbooks/contract/20200203
https://www.nxtbook.com/nxtbooks/contract/202001
https://www.nxtbook.com/nxtbooks/contract/201912
https://www.nxtbook.com/nxtbooks/contract/201911
https://www.nxtbook.com/nxtbooks/contract/201910
https://www.nxtbook.com/nxtbooks/contract/womeninbusiness_2019
https://www.nxtbook.com/nxtbooks/contract/201909
https://www.nxtbook.com/nxtbooks/contract/201908
https://www.nxtbook.com/nxtbooks/contract/20190607
https://www.nxtbook.com/nxtbooks/contract/onpp-foresight_2019
https://www.nxtbook.com/nxtbooks/contract/201905
https://www.nxtbook.com/nxtbooks/contract/201904
https://www.nxtbook.com/nxtbooks/contract/201903
https://www.nxtbook.com/nxtbooks/contract/20190102
https://www.nxtbook.com/nxtbooks/contract/201812
https://www.nxtbook.com/nxtbooks/contract/womeninbusiness_2018
https://www.nxtbook.com/nxtbooks/contract/201811
https://www.nxtbook.com/nxtbooks/contract/201810
https://www.nxtbook.com/nxtbooks/contract/201809
https://www.nxtbook.com/nxtbooks/contract/20180708
https://www.nxtbook.com/nxtbooks/contract/201806
https://www.nxtbook.com/nxtbooks/contract/201805
https://www.nxtbook.com/nxtbooks/contract/201804
https://www.nxtbook.com/nxtbooks/contract/201803
https://www.nxtbook.com/nxtbooks/contract/20180102
https://www.nxtbook.com/nxtbooks/contract/201712
https://www.nxtbook.com/nxtbooks/contract/201711
https://www.nxtbook.com/nxtbooks/contract/201710
https://www.nxtbook.com/nxtbooks/contract/201709
https://www.nxtbook.com/nxtbooks/contract/2017neocon
https://www.nxtbook.com/nxtbooks/contract/20170708
https://www.nxtbook.com/nxtbooks/contract/201706
https://www.nxtbook.com/nxtbooks/contract/201705
https://www.nxtbook.com/nxtbooks/contract/201704
https://www.nxtbook.com/nxtbooks/contract/201703
https://www.nxtbook.com/nxtbooks/contract/20170102
https://www.nxtbook.com/nxtbooks/contract/201612
https://www.nxtbook.com/nxtbooks/contract/201611
https://www.nxtbook.com/nxtbooks/contract/201610
https://www.nxtbook.com/nxtbooks/contract/201609
https://www.nxtbook.com/nxtbooks/contract/2016neocon
https://www.nxtbook.com/nxtbooks/contract/201607
https://www.nxtbook.com/nxtbooks/contract/201606
https://www.nxtbook.com/nxtbooks/contract/201605
https://www.nxtbook.com/nxtbooks/contract/201604
https://www.nxtbook.com/nxtbooks/contract/201603
https://www.nxtbook.com/nxtbooks/contract/20160102
https://www.nxtbook.com/nxtbooks/contract/201512
https://www.nxtbook.com/nxtbooks/contract/201511
https://www.nxtbook.com/nxtbooks/contract/201510
https://www.nxtbook.com/nxtbooks/contract/201509
https://www.nxtbook.com/nxtbooks/contract/20150708
https://www.nxtbook.com/nxtbooks/contract/2015neocon
https://www.nxtbook.com/nxtbooks/contract/201506
https://www.nxtbook.com/nxtbooks/contract/201505
https://www.nxtbook.com/nxtbooks/contract/201504
https://www.nxtbook.com/nxtbooks/contract/201503
https://www.nxtbook.com/nxtbooks/contract/201501
https://www.nxtbook.com/nxtbooks/contract/201412
https://www.nxtbook.com/nxtbooks/contract/201411
https://www.nxtbook.com/nxtbooks/contract/201410
https://www.nxtbook.com/nxtbooks/contract/201409
https://www.nxtbook.com/nxtbooks/contract/2014neocon
https://www.nxtbook.com/nxtbooks/contract/20140708
https://www.nxtbook.com/nxtbooks/contract/201406
https://www.nxtbook.com/nxtbooks/contract/201405
https://www.nxtbook.com/nxtbooks/contract/201404
https://www.nxtbook.com/nxtbooks/contract/201403
https://www.nxtbook.com/nxtbooks/contract/iida_red2014
https://www.nxtbook.com/nxtbooks/contract/201401
https://www.nxtbook.com/nxtbooks/nielsen/contract_201312
https://www.nxtbook.com/nxtbooks/nielsen/contract_201311
https://www.nxtbook.com/nxtbooks/nielsen/contract_201310
https://www.nxtbook.com/nxtbooks/nielsen/contract_201310_v2
https://www.nxtbook.com/nxtbooks/nielsen/contract_201309
https://www.nxtbook.com/nxtbooks/nielsen/contract_20130708
https://www.nxtbook.com/nxtbooks/nielsen/contract_20130708_neocon_supplement
https://www.nxtbook.com/nxtbooks/nielsen/contract_201306
https://www.nxtbook.com/nxtbooks/nielsen/contract_201305
https://www.nxtbook.com/nxtbooks/nielsen/contract_201304
https://www.nxtbook.com/nxtbooks/nielsen/contract_201303
https://www.nxtbook.com/nxtbooks/nielsen/contract_20130102
https://www.nxtbook.com/nxtbooks/nielsen/contract_201212
https://www.nxtbook.com/nxtbooks/nielsen/contract_201211
https://www.nxtbook.com/nxtbooks/nielsen/contract_201210
https://www.nxtbook.com/nxtbooks/nielsen/contract_201209
https://www.nxtbook.com/nxtbooks/nielsen/contract_ncw_201208
https://www.nxtbook.com/nxtbooks/nielsen/contract_201208
https://www.nxtbook.com/nxtbooks/nielsen/contract_201206
https://www.nxtbook.com/nxtbooks/nielsen/contract_201205
https://www.nxtbook.com/nxtbooks/nielsen/contract_201204
https://www.nxtbook.com/nxtbooks/nielsen/contract_201203
https://www.nxtbook.com/nxtbooks/nielsen/contract_20120102
https://www.nxtbook.com/nxtbooks/nielsen/contract_20111112
https://www.nxtbook.com/nxtbooks/nielsen/contract_201110
https://www.nxtbook.com/nxtbooks/nielsen/contract_201109
https://www.nxtbook.com/nxtbooks/nielsen/contract_2011neoconwinners
https://www.nxtbook.com/nxtbooks/nielsen/contract_201108
https://www.nxtbook.com/nxtbooks/nielsen/contract_201106
https://www.nxtbook.com/nxtbooks/nielsen/contract_201105
https://www.nxtbook.com/nxtbooks/nielsen/contract_201104
https://www.nxtbook.com/nxtbooks/nielsen/contract_201103
https://www.nxtbook.com/nxtbooks/nielsen/contract_20110102
https://www.nxtbook.com/nxtbooks/nielsen/contract_20101112
https://www.nxtbook.com/nxtbooks/nielsen/contract_201010
https://www.nxtbook.com/nxtbooks/nielsen/contract_201009
https://www.nxtbook.com/nxtbooks/nielsen/contract_20100708
https://www.nxtbook.com/nxtbooks/nielsen/contract_201006
https://www.nxtbook.com/nxtbooks/nielsen/contract_201005
https://www.nxtbook.com/nxtbooks/nielsen/contract_201004
https://www.nxtbook.com/nxtbooks/nielsen/contract_201003
https://www.nxtbook.com/nxtbooks/nielsen/contract_20100102
https://www.nxtbook.com/nxtbooks/nielsen/contract_200911
https://www.nxtbook.com/nxtbooks/nielsen/contract_200909
https://www.nxtbook.com/nxtbooks/nielsen/contract_200910
https://www.nxtbook.com/nxtbooks/nielsen/contract_200908
https://www.nxtbook.com/nxtbooks/nielsen/contract_200907
https://www.nxtbook.com/nxtbooks/nielsen/contract_200906
https://www.nxtbook.com/nxtbooks/nielsen/contract_200905
https://www.nxtbook.com/nxtbooks/nielsen/contract_200904
https://www.nxtbook.com/nxtbooks/nielsen/contract_200903
https://www.nxtbook.com/nxtbooks/nielsen/contract_200902
https://www.nxtbook.com/nxtbooks/nielsen/contract_200901
https://www.nxtbookmedia.com