Contract Magazine - April/May 2020 - 49

"drawing from all over the DESIGN spectrum..."
How did you end up working with Bernhardt Design?
Cowper: We were first introduced to Jerry through email. Jerry saw
an image online somewhere of a project of ours called Gang Bench
that we shared at IMM Cologne as part of the Pure Talents contest in
January of last year. We didn't see his email for ages because it went
straight to our spam folder. Luckily, we did eventually see it, because
it might have been lost forever.
Then how did the conversation evolve?
Surrage: He proposed the idea of making a mix of tables based
on density-thick and thin. They're all different, but they all
have something that brings them together in kind of a weird,
patchwork way.
Was there any interior-design trend that Jerry was trying to hit
on, or a problem he wanted to solve through this collection?
Cowper: On the trend side of things, we met him at the Hotel Café
Royal in London, and we sort of walked around the hotel lobby
looking at the kind of furniture they had in there, because hotels like
that are the types of clients that Bernhardt caters for. On the trend
side, they had mini collections of furniture, so there would be three
different tables.
Surrage: It's more like they're curated, rather than a family of the
same tables.
So tell me how they're unified more like a modern family,
and what distinguishes each from the others?
Cowper: Jerry said that he wanted one that was Scandinavian-style,
one that was very dense and solid, and others that were very
lightweight. He was drawing from all over the design spectrum-
something that was more organic to something that was more
architectural.
Could you take me through the thinking behind one of the tables?
Cowper: We just got renders of each one yesterday. We'll start with
the Bassa table. It has a very lightweight, traditional-looking base,
and then the top is dished, so it's not flat-it's like a big dish and then
flat across the top.
Surrage: It's a detail that you wouldn't necessarily notice from above,
but when you see it, it gives a very uplifting feeling because the
edges are so thin.
Cowper: This was our sort of Scandinavian concept. This is available
with a wooden top and also a spun metal top, which looks really cool.
We're really exploring how the design, mixed with manufacturing
process, mixed with material could really make something all come
together in one design, which looks really quite dynamic.
Surrage: I don't think Bernhardt had ever spun anything this large
before.
Cowper: So this is a new discovery for both them and us.
Surrage: That's one that we're really proud of.

Changing out the type of material from wood to metal really
alters the table's sensibility.
Cowper: Yeah, and I think it has an honesty to it, because the pattern
on the metal from the spinning process is not adding a finish to
it to make it cool; it looks the way it is because of its manufacturing
process. When you see it, you can kind of connect to how it's made.
Speaking of the production process, were there any hiccups-
any problems that you needed to solve-along the way?
Surrage: With our table called the Colvid. It originally started off
square, but the legs came diagonally across it, making it look like
the corners were levitating, which sounded too good to be true,
and it was.
Cowper: It functioned well as a table, but it really couldn't take
a lot of weight. Two corners were really strong, but if you sat on one
of the overhangs, it would probably bend a bit. It did look cool, but it
wouldn't stand up to the sort of toll of the market it's going to go into.
The final product is round and still has the optical illusion that we
were going for.
Coming out of this process, what did you learn? What was
a big takeaway for you?
Surrage: The speed of the project is something we hadn't
experienced before. We've spent half a year on a project-designing
and making the prototype and sourcing all the materials, whereas
this sort of takes all of that out of our hands. And the best person
has the best job.
Cowper: Yeah, Jerry has a talent for seeing who's the best at doing
each different job. You constantly feel like you're working with
somebody who knows everything about each aspect of the project.
How long was the project from start to finish?
Surrage: About a month.
If you were to work for Bernhardt Design again, is there anything
that you'd like to design for Jerry?
Cowper: I think we're pretty open to designing anything.
Surrage: I mean, we've designed watering cans before. We've
designed cutlery. It really doesn't matter to us. We just really
enjoy creating.

contract



Contract Magazine - April/May 2020

Table of Contents for the Digital Edition of Contract Magazine - April/May 2020

Contract Magazine - April/May 2020
Contents
Editorial
Industry News
Show Director’s Letter
Product Briefs: Made in Italy
Product Trend: Nostalgic Luxury
Rising Hospitality Firms
Material Sensibility
Soft Contract
A World of Design
Matrix: Kitchen and Bath
Matrix: Textiles and Materials
Matrix: Residential Crossover
Matrix: Hospitality
Designers Select: Hospitality
Wilsonart Challenges Student Chair Design Competition
Contract Magazine - April/May 2020 - Contract Magazine - April/May 2020
Contract Magazine - April/May 2020 - Cover2
Contract Magazine - April/May 2020 - 1
Contract Magazine - April/May 2020 - 2
Contract Magazine - April/May 2020 - 3
Contract Magazine - April/May 2020 - Contents
Contract Magazine - April/May 2020 - 5
Contract Magazine - April/May 2020 - 6
Contract Magazine - April/May 2020 - 7
Contract Magazine - April/May 2020 - 8
Contract Magazine - April/May 2020 - 9
Contract Magazine - April/May 2020 - 10
Contract Magazine - April/May 2020 - 11
Contract Magazine - April/May 2020 - 12
Contract Magazine - April/May 2020 - 13
Contract Magazine - April/May 2020 - Editorial
Contract Magazine - April/May 2020 - 15
Contract Magazine - April/May 2020 - 16
Contract Magazine - April/May 2020 - 17
Contract Magazine - April/May 2020 - Industry News
Contract Magazine - April/May 2020 - 19
Contract Magazine - April/May 2020 - Show Director’s Letter
Contract Magazine - April/May 2020 - 21
Contract Magazine - April/May 2020 - 22
Contract Magazine - April/May 2020 - 23
Contract Magazine - April/May 2020 - Product Briefs: Made in Italy
Contract Magazine - April/May 2020 - 25
Contract Magazine - April/May 2020 - 26
Contract Magazine - April/May 2020 - 27
Contract Magazine - April/May 2020 - Product Trend: Nostalgic Luxury
Contract Magazine - April/May 2020 - 29
Contract Magazine - April/May 2020 - 30
Contract Magazine - April/May 2020 - 31
Contract Magazine - April/May 2020 - 32
Contract Magazine - April/May 2020 - 33
Contract Magazine - April/May 2020 - 34
Contract Magazine - April/May 2020 - Rising Hospitality Firms
Contract Magazine - April/May 2020 - 36
Contract Magazine - April/May 2020 - 37
Contract Magazine - April/May 2020 - 38
Contract Magazine - April/May 2020 - 39
Contract Magazine - April/May 2020 - 40
Contract Magazine - April/May 2020 - 41
Contract Magazine - April/May 2020 - 42
Contract Magazine - April/May 2020 - 43
Contract Magazine - April/May 2020 - 44
Contract Magazine - April/May 2020 - 45
Contract Magazine - April/May 2020 - Material Sensibility
Contract Magazine - April/May 2020 - 47
Contract Magazine - April/May 2020 - 48
Contract Magazine - April/May 2020 - 49
Contract Magazine - April/May 2020 - Soft Contract
Contract Magazine - April/May 2020 - 51
Contract Magazine - April/May 2020 - 52
Contract Magazine - April/May 2020 - 53
Contract Magazine - April/May 2020 - 54
Contract Magazine - April/May 2020 - 55
Contract Magazine - April/May 2020 - 56
Contract Magazine - April/May 2020 - 57
Contract Magazine - April/May 2020 - A World of Design
Contract Magazine - April/May 2020 - 59
Contract Magazine - April/May 2020 - 60
Contract Magazine - April/May 2020 - 61
Contract Magazine - April/May 2020 - 62
Contract Magazine - April/May 2020 - 63
Contract Magazine - April/May 2020 - 64
Contract Magazine - April/May 2020 - 65
Contract Magazine - April/May 2020 - Matrix: Kitchen and Bath
Contract Magazine - April/May 2020 - 67
Contract Magazine - April/May 2020 - Matrix: Textiles and Materials
Contract Magazine - April/May 2020 - 69
Contract Magazine - April/May 2020 - Matrix: Residential Crossover
Contract Magazine - April/May 2020 - 71
Contract Magazine - April/May 2020 - 72
Contract Magazine - April/May 2020 - 73
Contract Magazine - April/May 2020 - Matrix: Hospitality
Contract Magazine - April/May 2020 - 75
Contract Magazine - April/May 2020 - 76
Contract Magazine - April/May 2020 - 77
Contract Magazine - April/May 2020 - Designers Select: Hospitality
Contract Magazine - April/May 2020 - 79
Contract Magazine - April/May 2020 - Wilsonart Challenges Student Chair Design Competition
Contract Magazine - April/May 2020 - Cover3
Contract Magazine - April/May 2020 - Cover4
https://www.nxtbook.com/nxtbooks/contract/202007
https://www.nxtbook.com/nxtbooks/contract/202006
https://www.nxtbook.com/nxtbooks/contract/20200405
https://www.nxtbook.com/nxtbooks/contract/20200203
https://www.nxtbook.com/nxtbooks/contract/202001
https://www.nxtbook.com/nxtbooks/contract/201912
https://www.nxtbook.com/nxtbooks/contract/201911
https://www.nxtbook.com/nxtbooks/contract/201910
https://www.nxtbook.com/nxtbooks/contract/womeninbusiness_2019
https://www.nxtbook.com/nxtbooks/contract/201909
https://www.nxtbook.com/nxtbooks/contract/201908
https://www.nxtbook.com/nxtbooks/contract/20190607
https://www.nxtbook.com/nxtbooks/contract/onpp-foresight_2019
https://www.nxtbook.com/nxtbooks/contract/201905
https://www.nxtbook.com/nxtbooks/contract/201904
https://www.nxtbook.com/nxtbooks/contract/201903
https://www.nxtbook.com/nxtbooks/contract/20190102
https://www.nxtbook.com/nxtbooks/contract/201812
https://www.nxtbook.com/nxtbooks/contract/womeninbusiness_2018
https://www.nxtbook.com/nxtbooks/contract/201811
https://www.nxtbook.com/nxtbooks/contract/201810
https://www.nxtbook.com/nxtbooks/contract/201809
https://www.nxtbook.com/nxtbooks/contract/20180708
https://www.nxtbook.com/nxtbooks/contract/201806
https://www.nxtbook.com/nxtbooks/contract/201805
https://www.nxtbook.com/nxtbooks/contract/201804
https://www.nxtbook.com/nxtbooks/contract/201803
https://www.nxtbook.com/nxtbooks/contract/20180102
https://www.nxtbook.com/nxtbooks/contract/201712
https://www.nxtbook.com/nxtbooks/contract/201711
https://www.nxtbook.com/nxtbooks/contract/201710
https://www.nxtbook.com/nxtbooks/contract/201709
https://www.nxtbook.com/nxtbooks/contract/2017neocon
https://www.nxtbook.com/nxtbooks/contract/20170708
https://www.nxtbook.com/nxtbooks/contract/201706
https://www.nxtbook.com/nxtbooks/contract/201705
https://www.nxtbook.com/nxtbooks/contract/201704
https://www.nxtbook.com/nxtbooks/contract/201703
https://www.nxtbook.com/nxtbooks/contract/20170102
https://www.nxtbook.com/nxtbooks/contract/201612
https://www.nxtbook.com/nxtbooks/contract/201611
https://www.nxtbook.com/nxtbooks/contract/201610
https://www.nxtbook.com/nxtbooks/contract/201609
https://www.nxtbook.com/nxtbooks/contract/2016neocon
https://www.nxtbook.com/nxtbooks/contract/201607
https://www.nxtbook.com/nxtbooks/contract/201606
https://www.nxtbook.com/nxtbooks/contract/201605
https://www.nxtbook.com/nxtbooks/contract/201604
https://www.nxtbook.com/nxtbooks/contract/201603
https://www.nxtbook.com/nxtbooks/contract/20160102
https://www.nxtbook.com/nxtbooks/contract/201512
https://www.nxtbook.com/nxtbooks/contract/201511
https://www.nxtbook.com/nxtbooks/contract/201510
https://www.nxtbook.com/nxtbooks/contract/201509
https://www.nxtbook.com/nxtbooks/contract/20150708
https://www.nxtbook.com/nxtbooks/contract/2015neocon
https://www.nxtbook.com/nxtbooks/contract/201506
https://www.nxtbook.com/nxtbooks/contract/201505
https://www.nxtbook.com/nxtbooks/contract/201504
https://www.nxtbook.com/nxtbooks/contract/201503
https://www.nxtbook.com/nxtbooks/contract/201501
https://www.nxtbook.com/nxtbooks/contract/201412
https://www.nxtbook.com/nxtbooks/contract/201411
https://www.nxtbook.com/nxtbooks/contract/201410
https://www.nxtbook.com/nxtbooks/contract/201409
https://www.nxtbook.com/nxtbooks/contract/2014neocon
https://www.nxtbook.com/nxtbooks/contract/20140708
https://www.nxtbook.com/nxtbooks/contract/201406
https://www.nxtbook.com/nxtbooks/contract/201405
https://www.nxtbook.com/nxtbooks/contract/201404
https://www.nxtbook.com/nxtbooks/contract/201403
https://www.nxtbook.com/nxtbooks/contract/iida_red2014
https://www.nxtbook.com/nxtbooks/contract/201401
https://www.nxtbook.com/nxtbooks/nielsen/contract_201312
https://www.nxtbook.com/nxtbooks/nielsen/contract_201311
https://www.nxtbook.com/nxtbooks/nielsen/contract_201310
https://www.nxtbook.com/nxtbooks/nielsen/contract_201310_v2
https://www.nxtbook.com/nxtbooks/nielsen/contract_201309
https://www.nxtbook.com/nxtbooks/nielsen/contract_20130708
https://www.nxtbook.com/nxtbooks/nielsen/contract_20130708_neocon_supplement
https://www.nxtbook.com/nxtbooks/nielsen/contract_201306
https://www.nxtbook.com/nxtbooks/nielsen/contract_201305
https://www.nxtbook.com/nxtbooks/nielsen/contract_201304
https://www.nxtbook.com/nxtbooks/nielsen/contract_201303
https://www.nxtbook.com/nxtbooks/nielsen/contract_20130102
https://www.nxtbook.com/nxtbooks/nielsen/contract_201212
https://www.nxtbook.com/nxtbooks/nielsen/contract_201211
https://www.nxtbook.com/nxtbooks/nielsen/contract_201210
https://www.nxtbook.com/nxtbooks/nielsen/contract_201209
https://www.nxtbook.com/nxtbooks/nielsen/contract_ncw_201208
https://www.nxtbook.com/nxtbooks/nielsen/contract_201208
https://www.nxtbook.com/nxtbooks/nielsen/contract_201206
https://www.nxtbook.com/nxtbooks/nielsen/contract_201205
https://www.nxtbook.com/nxtbooks/nielsen/contract_201204
https://www.nxtbook.com/nxtbooks/nielsen/contract_201203
https://www.nxtbook.com/nxtbooks/nielsen/contract_20120102
https://www.nxtbook.com/nxtbooks/nielsen/contract_20111112
https://www.nxtbook.com/nxtbooks/nielsen/contract_201110
https://www.nxtbook.com/nxtbooks/nielsen/contract_201109
https://www.nxtbook.com/nxtbooks/nielsen/contract_2011neoconwinners
https://www.nxtbook.com/nxtbooks/nielsen/contract_201108
https://www.nxtbook.com/nxtbooks/nielsen/contract_201106
https://www.nxtbook.com/nxtbooks/nielsen/contract_201105
https://www.nxtbook.com/nxtbooks/nielsen/contract_201104
https://www.nxtbook.com/nxtbooks/nielsen/contract_201103
https://www.nxtbook.com/nxtbooks/nielsen/contract_20110102
https://www.nxtbook.com/nxtbooks/nielsen/contract_20101112
https://www.nxtbook.com/nxtbooks/nielsen/contract_201010
https://www.nxtbook.com/nxtbooks/nielsen/contract_201009
https://www.nxtbook.com/nxtbooks/nielsen/contract_20100708
https://www.nxtbook.com/nxtbooks/nielsen/contract_201006
https://www.nxtbook.com/nxtbooks/nielsen/contract_201005
https://www.nxtbook.com/nxtbooks/nielsen/contract_201004
https://www.nxtbook.com/nxtbooks/nielsen/contract_201003
https://www.nxtbook.com/nxtbooks/nielsen/contract_20100102
https://www.nxtbook.com/nxtbooks/nielsen/contract_200911
https://www.nxtbook.com/nxtbooks/nielsen/contract_200909
https://www.nxtbook.com/nxtbooks/nielsen/contract_200910
https://www.nxtbook.com/nxtbooks/nielsen/contract_200908
https://www.nxtbook.com/nxtbooks/nielsen/contract_200907
https://www.nxtbook.com/nxtbooks/nielsen/contract_200906
https://www.nxtbook.com/nxtbooks/nielsen/contract_200905
https://www.nxtbook.com/nxtbooks/nielsen/contract_200904
https://www.nxtbook.com/nxtbooks/nielsen/contract_200903
https://www.nxtbook.com/nxtbooks/nielsen/contract_200902
https://www.nxtbook.com/nxtbooks/nielsen/contract_200901
https://www.nxtbookmedia.com