HYDROGEN INFRASTRUCTURE DEVELOPMENT
and jetties are not included, as it is assumed that the existing
infrastructure in both Qatar and the UK will be used. However,
due to the requirement for the LNG value chain to have two
types of ships-LNG carriers and CO2
berthing CO2
ships-CAPEX for
ships was included in both Qatar and the UK.
The system boundary for each option is detailed in the folbeing
lowing
sections. A simple heat and material balance is developed
for each option, resulting in the same quantity of H2
delivered into the UK grid. Depending on the various losses of
product through the value chain, each option requires a different
quantity of natural gas feed.
The study is essentially based on 500 metric tons per day
capacity. The resulting individual unit pro(metric
tpd) of H2
cesses are sized based on the best information available for realistic
or available equipment. This methodology also applies to
typical ship sizes for the different products. LH2
value chains do
not exist at present, so all unit sizes were selected on the most
realistic size with accompanying CAPEX data. Included are optimistic,
scaled-up unit sizes and optimistic energy reduction
targets cited in the literature, so a sensitivity case is included to
capture potential savings as the LH2
The same H2
value chain is developed.
production configuration was used for all
options, and any additional heat integration opportunities in
the processes are not considered. For example, " cold " recovery
from LNG and LH2
heat recovery from the NH3
Operating days per year is assumed to be 350 days, and turnregasification
is not explored, nor is
and MCH processes. Therefore,
good energy savings may be found in the further development
of these processes.
Shipping fuel requirements proved particularly difficult to
establish. It was assumed that the LNG, CO2
ships could run on LNG, and the LH2
, NH3 and MCH
ship would run on LH2
boil-off gas (BOG). It seems likely that ships can be fueled by
NH3
tently between the different options.
The Qatargas 2 project9
in the future, but for this study it was decided to keep the
, where BOG reliquefication on the ship is unlikely to be
usage was carried out, using a simplistic method, consisLNG
value chain capacity includes
fuel consistent between the options with the exception of the
LH2
economic. Converting ship power requirements into LNG/
LH2
2 × 7.8-MMtpy LNG mega-trains (APCI AP-X), 5 × 145,000m3
LNG
storage tanks, LPG, additional condensate berths, sulLNG
tanks in the UK and regas facilities with a colEqs.
5-7 are used to determine the storage tank volumes and
number of tanks. A margin for the delayed arrival of a ship is
considered.
Frequency (days) = Operating days / Total round trip (5)
Working volume (m3
) = Carrier size (m3
)
frequency or 7 days × Rundown rate (m3
) + Minimum
÷ day)
Number of storage tanks = Working volume (m3
Tank capacity (m3
fur facilities, a fleet of 14 Q-Flex and Q-Max ships in Qatar, 3 ×
220,000 m3
lective capacity of 15.6 MMtpy. CAPEX and OPEX are costed
on a factor of (0.54 ÷ 15.6) for the entire value chain, excluding
the byproducts and additional berths. Only one Q-Max ship
was considered in the CAPEX.
Storage, loading, unloading and transportation costs are a
significant proportion of the overall value chain. The ship size
selected for each option is based on typical sizes cited in literature
and referenced later; however, this may not give the most
optimum or economic solution, as some options have lower
ship utilization than others, which is a key parameter for optimization
in any future study.
Selecting the ship size and speed defines the voyage duration
and number of trips and, therefore, the number of ships
required. It also defines the minimum onshore storage capacity
required. For the sake of simplicity, the same capacity was
assumed in Qatar and the UK. A minimum margin of 7 days of
) ÷
(7)
Cost estimation. The value chain for each option is defined,
and CAPEX and OPEX were calculated for each unit within
the process. For each part of the value chain, it is assumed that
there are 350 operational days/yr, and the overall lifetime is
30 yr. Data gathered for each unit are scaled up or down, as required
for the required unit size, using the standard estimation
factor to a power. A geographical estimating factor of 0.9 for
Qatar to 1 for the UK was also applied where necessary. Currency
conversion factors of pounds sterling (GBP) to U.S. dollars
(USD) of 1.32, and euros to USD of 1.14 are used where
necessary. Feed and utility costs for each location are detailed
in TABLE 1.
The approach taken in this study to determine the capital
cost of a plant, is calculated based on the scaling factor and corresponding
reference capital cost and capacity as outlined in Eq. 8:
Capital investment (S) = Capital investmentref
(S0
[Capacity (C) / (Capacityref
H2Tech | Q3 2021 | H2-Tech.com
(C0
)]n
) ×
(8)
(6)
around time in port (which consist of loading and unloading
hours) is assumed to be 3 days. Therefore, the number of ships
can be calculated as shown in Eq. 4:
Total number of ships = Total number of trips /
Number of trips per yr
(4)
Number of days per trip = [Distance (km / Ship) ×
speed (km / hr)]÷ 24
Number of trips per yr = Operating days in yr /
Number of days per trip + turnaround days
(2)
(3)
SPECIAL FOCUS
storage is included to allow for shipping delays, such as weather
or ship outages.
To determine the number of ships, it is important to identify
the number of trips required to transfer the total product from
the export terminal to the import terminal. The total number
of trips to transport a certain amount of product is calculated
using the carrier capacity shown in Eq. 1:
Total number of trips = Transported capacity (metric t ÷
yr) ÷ Ship capacity (metric t)
(1)
The maximum number of trips each ship can make per year
must then be determined. This is achieved by calculating the
number of days per trip, which depends on the carrier sea speed,
calculated as shown in Eqs. 2 and 3:
http://www.H2-Tech.com

HP March 2022 eBook—Energy Transition

Table of Contents for the Digital Edition of HP March 2022 eBook—Energy Transition

Contents
HP March 2022 eBook—Energy Transition - Cover1
HP March 2022 eBook—Energy Transition - Cover2
HP March 2022 eBook—Energy Transition - 3
HP March 2022 eBook—Energy Transition - Contents
HP March 2022 eBook—Energy Transition - 5
HP March 2022 eBook—Energy Transition - 6
HP March 2022 eBook—Energy Transition - 7
HP March 2022 eBook—Energy Transition - 8
HP March 2022 eBook—Energy Transition - 9
HP March 2022 eBook—Energy Transition - 10
HP March 2022 eBook—Energy Transition - 11
HP March 2022 eBook—Energy Transition - 12
HP March 2022 eBook—Energy Transition - 13
HP March 2022 eBook—Energy Transition - 14
HP March 2022 eBook—Energy Transition - 15
HP March 2022 eBook—Energy Transition - 16
HP March 2022 eBook—Energy Transition - 17
HP March 2022 eBook—Energy Transition - 18
HP March 2022 eBook—Energy Transition - 19
HP March 2022 eBook—Energy Transition - 20
HP March 2022 eBook—Energy Transition - 21
HP March 2022 eBook—Energy Transition - 22
HP March 2022 eBook—Energy Transition - 23
HP March 2022 eBook—Energy Transition - 24
HP March 2022 eBook—Energy Transition - 25
HP March 2022 eBook—Energy Transition - 26
HP March 2022 eBook—Energy Transition - 27
HP March 2022 eBook—Energy Transition - 28
HP March 2022 eBook—Energy Transition - 29
HP March 2022 eBook—Energy Transition - 30
HP March 2022 eBook—Energy Transition - 31
HP March 2022 eBook—Energy Transition - 32
HP March 2022 eBook—Energy Transition - 33
HP March 2022 eBook—Energy Transition - 34
HP March 2022 eBook—Energy Transition - 35
HP March 2022 eBook—Energy Transition - 36
HP March 2022 eBook—Energy Transition - 37
HP March 2022 eBook—Energy Transition - 38
HP March 2022 eBook—Energy Transition - 39
HP March 2022 eBook—Energy Transition - 40
HP March 2022 eBook—Energy Transition - 41
HP March 2022 eBook—Energy Transition - 42
HP March 2022 eBook—Energy Transition - 43
HP March 2022 eBook—Energy Transition - 44
HP March 2022 eBook—Energy Transition - 45
HP March 2022 eBook—Energy Transition - 46
HP March 2022 eBook—Energy Transition - 47
HP March 2022 eBook—Energy Transition - 48
HP March 2022 eBook—Energy Transition - 49
HP March 2022 eBook—Energy Transition - 50
HP March 2022 eBook—Energy Transition - 51
HP March 2022 eBook—Energy Transition - 52
HP March 2022 eBook—Energy Transition - 53
HP March 2022 eBook—Energy Transition - 54
HP March 2022 eBook—Energy Transition - 55
HP March 2022 eBook—Energy Transition - 56
HP March 2022 eBook—Energy Transition - 57
HP March 2022 eBook—Energy Transition - 58
HP March 2022 eBook—Energy Transition - 59
HP March 2022 eBook—Energy Transition - 60
HP March 2022 eBook—Energy Transition - 61
HP March 2022 eBook—Energy Transition - 62
HP March 2022 eBook—Energy Transition - 63
HP March 2022 eBook—Energy Transition - 64
HP March 2022 eBook—Energy Transition - 65
HP March 2022 eBook—Energy Transition - 66
HP March 2022 eBook—Energy Transition - 67
HP March 2022 eBook—Energy Transition - 68
HP March 2022 eBook—Energy Transition - 69
HP March 2022 eBook—Energy Transition - 70
HP March 2022 eBook—Energy Transition - 71
HP March 2022 eBook—Energy Transition - 72
HP March 2022 eBook—Energy Transition - 73
HP March 2022 eBook—Energy Transition - 74
HP March 2022 eBook—Energy Transition - 75
HP March 2022 eBook—Energy Transition - 76
HP March 2022 eBook—Energy Transition - 77
HP March 2022 eBook—Energy Transition - 78
HP March 2022 eBook—Energy Transition - 79
HP March 2022 eBook—Energy Transition - 80
HP March 2022 eBook—Energy Transition - 81
HP March 2022 eBook—Energy Transition - 82
HP March 2022 eBook—Energy Transition - 83
HP March 2022 eBook—Energy Transition - 84
HP March 2022 eBook—Energy Transition - 85
HP March 2022 eBook—Energy Transition - 86
HP March 2022 eBook—Energy Transition - 87
HP March 2022 eBook—Energy Transition - 88
HP March 2022 eBook—Energy Transition - 89
HP March 2022 eBook—Energy Transition - 90
HP March 2022 eBook—Energy Transition - 91
HP March 2022 eBook—Energy Transition - 92
HP March 2022 eBook—Energy Transition - 93
HP March 2022 eBook—Energy Transition - 94
HP March 2022 eBook—Energy Transition - 95
HP March 2022 eBook—Energy Transition - 96
HP March 2022 eBook—Energy Transition - 97
HP March 2022 eBook—Energy Transition - 98
HP March 2022 eBook—Energy Transition - 99
HP March 2022 eBook—Energy Transition - 100
HP March 2022 eBook—Energy Transition - 101
HP March 2022 eBook—Energy Transition - 102
HP March 2022 eBook—Energy Transition - 103
HP March 2022 eBook—Energy Transition - 104
HP March 2022 eBook—Energy Transition - 105
HP March 2022 eBook—Energy Transition - 106
HP March 2022 eBook—Energy Transition - 107
HP March 2022 eBook—Energy Transition - 108
HP March 2022 eBook—Energy Transition - 109
HP March 2022 eBook—Energy Transition - 110
HP March 2022 eBook—Energy Transition - 111
HP March 2022 eBook—Energy Transition - 112
HP March 2022 eBook—Energy Transition - 113
HP March 2022 eBook—Energy Transition - 114
HP March 2022 eBook—Energy Transition - 115
HP March 2022 eBook—Energy Transition - 116
HP March 2022 eBook—Energy Transition - 117
HP March 2022 eBook—Energy Transition - 118
HP March 2022 eBook—Energy Transition - 119
HP March 2022 eBook—Energy Transition - 120
HP March 2022 eBook—Energy Transition - 121
HP March 2022 eBook—Energy Transition - 122
HP March 2022 eBook—Energy Transition - 123
HP March 2022 eBook—Energy Transition - 124
HP March 2022 eBook—Energy Transition - 125
HP March 2022 eBook—Energy Transition - 126
HP March 2022 eBook—Energy Transition - 127
HP March 2022 eBook—Energy Transition - 128
HP March 2022 eBook—Energy Transition - 129
HP March 2022 eBook—Energy Transition - 130
HP March 2022 eBook—Energy Transition - 131
HP March 2022 eBook—Energy Transition - 132
HP March 2022 eBook—Energy Transition - 133
HP March 2022 eBook—Energy Transition - 134
HP March 2022 eBook—Energy Transition - 135
HP March 2022 eBook—Energy Transition - 136
HP March 2022 eBook—Energy Transition - 137
HP March 2022 eBook—Energy Transition - 138
HP March 2022 eBook—Energy Transition - 139
HP March 2022 eBook—Energy Transition - 140
HP March 2022 eBook—Energy Transition - 141
HP March 2022 eBook—Energy Transition - 142
HP March 2022 eBook—Energy Transition - Cover3
HP March 2022 eBook—Energy Transition - Cover4
https://www.nxtbook.com/gulfenergyinfo/gulfpub/HPI-Market-Data-2023-v3
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2024-v2
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2024
https://www.nxtbook.com/gulfenergyinfo/gulfpub/gas-processes-handbook-2022_v2
https://www.nxtbook.com/gulfenergyinfo/gulfpub/gas-processes-handbook-2022
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hp_202212
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2023-v2
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hp_202211
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202210
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202209
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202208
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202207_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202207
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202206_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202206
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202205_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202205
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202204_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202204
https://www.nxtbook.com/nxtbooks/gulfpub/hp_032022
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202203
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202202
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202201
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202112
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202111
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202110
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2022_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2022
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202109
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202108
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_processes_handbook_2021_v2
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_processes_handbook_2021
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202107
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202106
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202105
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202104
https://www.nxtbook.com/nxtbooks/gulfpub/hp_ebooks
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202103
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202102
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202101
https://www.nxtbook.com/nxtbooks/gulfpub/catalyst_handbook_2020_v2
https://www.nxtbook.com/nxtbooks/gulfpub/catalyst_handbook_2020
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202012
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202011
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202010
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2021
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202009
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202008
https://www.nxtbook.com/nxtbooks/gulfpub/refining_processes_handbook_2020
https://www.nxtbook.com/nxtbooks/gulfpub/refining_processes_handbook_2020_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202007
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202006
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202005
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202004
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202003
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202002
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202001
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201912
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201911
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2020_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2020
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201910
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201909
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201908
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201907
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201906
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201905
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201904
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201903
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201902
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201901
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_2018_v2
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_2018
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201812
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2019_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2019
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201811
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201810
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201809
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201808
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201807
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201806
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201805
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201804
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201803
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201802
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201801
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201712
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201711
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201710
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201709
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201708
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201707
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201706
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201705
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201704
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201703
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201702
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201701
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2017mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201612
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201611
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201610
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201609
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201608
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201607
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201606
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201605
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201604
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201603
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201602
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201601
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201512
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201511
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201510
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2016mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201509
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201508
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201507
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2015tmsd
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201506
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201505
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201504
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201503
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201502
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201501
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201412
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201411
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2015mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201410
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201409
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201408
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201407
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014petrochemicalprocesses_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014petrochemicalprocesses
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201406
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201405
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201404
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201403
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014calendar
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201402
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201401
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201312
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201311
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201310
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201309
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201308
https://www.nxtbook.com/nxtbooks/gulfpub/hp_srsguide2013
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201307
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201306
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201305
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201304
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201303
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201302
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201301
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201212
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201211
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201210
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201209
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201208
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201207
https://www.nxtbook.com/nxtbooks/gulfpub/hp_srsguide2012
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201206
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201205
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201204
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201203
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201202
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201201
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201112
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201111
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201110
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201109
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201108
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201107_srsguide
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201107
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201106
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201105
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201104
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201103
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201102
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201101
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201012
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201011
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201010
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201009
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201008
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201007
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201006
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201005
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201004
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201003
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201002
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201001
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200912
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200911
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200910
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200909
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200908
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200907
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200906
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200905
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200904
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200903
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200902
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200901
https://www.nxtbookmedia.com