Hydrocarbon Processing - October 2021 - 67

Engineering and Construction
take much imagination to see the large impact and cost that this
simple but poorly thought-out engineering decision incurred.
Passive management of pipe spool fabrication. Of the
four basic categories of materials (major equipment, fabricated
systems, standard components and consumables), fabricated
systems require the highest level of collaboration and they suffer
the most when the EPC contractor passively manages the process.
Fabricated systems can take many forms, but the two most
prevalent in a process plant are pipe spools and structural steel.
With the piping design, the supply, fabrication and erection
processes are almost always on a secondary critical path, if not
the primary path-and EPC contractors who actively engage
with pipe spool fabricators reap a smoother construction path,
particularly where the materials management team takes the lead.
In another example, two projects were being executed in
parallel for the same client. Each project had similar scopes
and logistical challenges, but were managed by two different
project teams. Both projects awarded the fabrication PO to the
same fabricator, and, due to their compressed schedules and
logistical challenges, both chose to free-issue spool materials
for fabrication as opposed to relying on the fabricator to supply
the spool materials.
Project A took a passive approach, with the procurement
organization managing the spool fabricator. While its procurement
team shared high-level priorities with the fabricator, assuming
that the spool component materials would be received
upon shipment, it did not integrate systems with the fabricator.
Instead, this team relied on the fabricator to work according to
project priorities by using the fabricator's standard cascade allocation
execution. Unsatisfactories, overs, shorts and deficiencies
(UOS&Ds) were not addressed upon shipment receipt. The
project team produced delivery curves from its sophisticated materials
management tool, but only at the ISO level, as that was the
finest granularity that the project engineering team could deliver.
Project B had its materials manager manage the spool fabricator,
proactively coordinating engineering and construction aspects,
as well as procurement aspects, of the PO. High-level priorities
were shared with the fabricator, but, in contrast to Project A,
project systems were integrated with the fabricator. The project
team was able to deliver priorities at the spool level directly into
the fabricator's system. Project B received the finer granularity of
takeoff at the spool level (which the project's engineering team
was unable to do) and included the fabricator's receipt data, capturing
UOS&Ds in the project materials management system. As
a result, instead of being forced to rely on the fabricator's cascade
allocation system to release spools into fabrication, Project B utilized
the project's sophisticated construction priorities materials
management tool and specifically directed the fabrication of each
spool. As a result, not only did Project B's spool fabrication go
smoother, but so did its downstream piping erection program.
Fabricators generally utilize a cascade allocation system, designed
to get as many spools as possible into fabrication. While
this approach can achieve the intended goal, it does so to the detriment
of individual spool delivery priorities.
TABLE 1 depicts the differing delivery sequence for two identical
spools. The first path is via a cascade system, which does
not hold inventory for otherwise non-releasable spools if that
inventory can be used to put a lower-priority spool into fabrication.
The second path is through a priorities system that reserves
10
15
20
25
30
35
40
45
50
55
5
Area Priorities (10) -
Earliest to Latest (left to right)
90% delivered
70% delivered
50% delivered
Erectability Trend Line
10 weeks
10
15
20
25
30
35
40
45
50
55
5
Area Priorities (57) -
Earliest to Latest (left to right)
FIG. 3. Pipe spool delivery curves: Project A (left) vs. Project B (right).
inventory for spools by priority, even if the spool has other materials
not available. The cascade system will get more spools
delivered sooner; however, these spools tend to be the wrong
ones. TABLE 1 shows that, for the two spools in question, while
the cascade system has an enhanced delivery curve, it gets one
spool to the jobsite too early, and the other spool arrives there
too late. In contrast, while the priorities system has a delayed
delivery curve relative to the cascade system, this system gets
the spools to the jobsite when they are needed. The cascade system
not only negatively impacts erection, but it also requires the
jobsite's warehousing team to unnecessarily store and manage
spools. Multiply this by 10,000 for a project with 20,000 spools
and the ensuing chaos is obvious.
Project A's early delivery curves were not grounded in hard
data, but on the fabricator working to project priorities. Spools
were cannibalized by the fabricator's cascade system as the fabrication
process proceeded, causing the curves to slip more than
6 mos to the right. Project B's curves were initially less optimistic,
but, as they were grounded on hard data from the integration,
they proved to be more accurate. Project B's actual delivery
curve never slipped outside of a +/- 10% delivery time frame.
FIG. 3 shows flat spool delivery on Project A, relative to actual
construction priorities, as opposed to the far steeper and more
desirable curve on Project B.
Project A communicated only 10 priorities to the fabricator
and allowed the fabricator to release spools into fabrication,
utilizing the fabricator's cascade allocation process. The net effect
was that the first priority area achieved erectability (i.e., the
level of spool deliveries at the jobsite necessary to support the
start of erection) 30 wk after deliveries began. The last priority
area achieved erectability at 40 wk-only 10 wk after the first
priority. This delayed the start of pipe spool erection at the jobsite
and created an undesirable peak in resource staffing.
Project B communicated 57 priorities to the fabricator, integrated
the fabricator's enterprise resource planning system with
Project B's materials management tool, and directed the fabricator
to release spools into fabrication on an individual spool basis
by using Project B's materials management tool. The net effect
was that the first priority area achieved erectability 15 wk after
deliveries began. The last priority achieved erectability at 48
wk, a 33-wk difference. This facilitated an early pipe spool erecHydrocarbon
Processing | OCTOBER 2021 67
90% delivered
70% delivered
50% delivered
Erectability Trend Line
33 weeks
Weeks
Weeks

Hydrocarbon Processing - October 2021

Table of Contents for the Digital Edition of Hydrocarbon Processing - October 2021

Contents
Hydrocarbon Processing - October 2021 - Cover1
Hydrocarbon Processing - October 2021 - Cover2
Hydrocarbon Processing - October 2021 - Contents
Hydrocarbon Processing - October 2021 - 4
Hydrocarbon Processing - October 2021 - 5
Hydrocarbon Processing - October 2021 - 6
Hydrocarbon Processing - October 2021 - 7
Hydrocarbon Processing - October 2021 - 8
Hydrocarbon Processing - October 2021 - 9
Hydrocarbon Processing - October 2021 - 10
Hydrocarbon Processing - October 2021 - 11
Hydrocarbon Processing - October 2021 - 12
Hydrocarbon Processing - October 2021 - 13
Hydrocarbon Processing - October 2021 - 14
Hydrocarbon Processing - October 2021 - 15
Hydrocarbon Processing - October 2021 - 16
Hydrocarbon Processing - October 2021 - 17
Hydrocarbon Processing - October 2021 - 18
Hydrocarbon Processing - October 2021 - 19
Hydrocarbon Processing - October 2021 - 20
Hydrocarbon Processing - October 2021 - 21
Hydrocarbon Processing - October 2021 - 22
Hydrocarbon Processing - October 2021 - 23
Hydrocarbon Processing - October 2021 - 24
Hydrocarbon Processing - October 2021 - 25
Hydrocarbon Processing - October 2021 - 26
Hydrocarbon Processing - October 2021 - 27
Hydrocarbon Processing - October 2021 - 28
Hydrocarbon Processing - October 2021 - 29
Hydrocarbon Processing - October 2021 - 30
Hydrocarbon Processing - October 2021 - 31
Hydrocarbon Processing - October 2021 - 32
Hydrocarbon Processing - October 2021 - 33
Hydrocarbon Processing - October 2021 - 34
Hydrocarbon Processing - October 2021 - 35
Hydrocarbon Processing - October 2021 - 36
Hydrocarbon Processing - October 2021 - 37
Hydrocarbon Processing - October 2021 - 38
Hydrocarbon Processing - October 2021 - 39
Hydrocarbon Processing - October 2021 - 40
Hydrocarbon Processing - October 2021 - 41
Hydrocarbon Processing - October 2021 - 42
Hydrocarbon Processing - October 2021 - 43
Hydrocarbon Processing - October 2021 - 44
Hydrocarbon Processing - October 2021 - 45
Hydrocarbon Processing - October 2021 - 46
Hydrocarbon Processing - October 2021 - 47
Hydrocarbon Processing - October 2021 - 48
Hydrocarbon Processing - October 2021 - 49
Hydrocarbon Processing - October 2021 - 50
Hydrocarbon Processing - October 2021 - 51
Hydrocarbon Processing - October 2021 - 52
Hydrocarbon Processing - October 2021 - 53
Hydrocarbon Processing - October 2021 - 54
Hydrocarbon Processing - October 2021 - 55
Hydrocarbon Processing - October 2021 - 56
Hydrocarbon Processing - October 2021 - 57
Hydrocarbon Processing - October 2021 - 58
Hydrocarbon Processing - October 2021 - 59
Hydrocarbon Processing - October 2021 - 60
Hydrocarbon Processing - October 2021 - 61
Hydrocarbon Processing - October 2021 - 62
Hydrocarbon Processing - October 2021 - 63
Hydrocarbon Processing - October 2021 - 64
Hydrocarbon Processing - October 2021 - 65
Hydrocarbon Processing - October 2021 - 66
Hydrocarbon Processing - October 2021 - 67
Hydrocarbon Processing - October 2021 - 68
Hydrocarbon Processing - October 2021 - 69
Hydrocarbon Processing - October 2021 - 70
Hydrocarbon Processing - October 2021 - 71
Hydrocarbon Processing - October 2021 - 72
Hydrocarbon Processing - October 2021 - 73
Hydrocarbon Processing - October 2021 - 74
Hydrocarbon Processing - October 2021 - 75
Hydrocarbon Processing - October 2021 - 76
Hydrocarbon Processing - October 2021 - 77
Hydrocarbon Processing - October 2021 - 78
Hydrocarbon Processing - October 2021 - 79
Hydrocarbon Processing - October 2021 - 80
Hydrocarbon Processing - October 2021 - 81
Hydrocarbon Processing - October 2021 - 82
Hydrocarbon Processing - October 2021 - 83
Hydrocarbon Processing - October 2021 - 84
Hydrocarbon Processing - October 2021 - 85
Hydrocarbon Processing - October 2021 - 86
Hydrocarbon Processing - October 2021 - 87
Hydrocarbon Processing - October 2021 - 88
Hydrocarbon Processing - October 2021 - 89
Hydrocarbon Processing - October 2021 - 90
Hydrocarbon Processing - October 2021 - Cover3
Hydrocarbon Processing - October 2021 - Cover4
Hydrocarbon Processing - October 2021 - GP-1
Hydrocarbon Processing - October 2021 - GP-2
Hydrocarbon Processing - October 2021 - GP-3
Hydrocarbon Processing - October 2021 - GP-4
Hydrocarbon Processing - October 2021 - GP-5
Hydrocarbon Processing - October 2021 - GP-6
Hydrocarbon Processing - October 2021 - GP-7
Hydrocarbon Processing - October 2021 - GP-8
Hydrocarbon Processing - October 2021 - GP-9
Hydrocarbon Processing - October 2021 - GP-10
Hydrocarbon Processing - October 2021 - GP-11
Hydrocarbon Processing - October 2021 - GP-12
Hydrocarbon Processing - October 2021 - GP-13
Hydrocarbon Processing - October 2021 - GP-14
Hydrocarbon Processing - October 2021 - GP-15
Hydrocarbon Processing - October 2021 - GP-16
Hydrocarbon Processing - October 2021 - GP-17
Hydrocarbon Processing - October 2021 - GP-18
Hydrocarbon Processing - October 2021 - GP-19
Hydrocarbon Processing - October 2021 - GP-20
Hydrocarbon Processing - October 2021 - GP-21
Hydrocarbon Processing - October 2021 - GP-22
Hydrocarbon Processing - October 2021 - GP-23
Hydrocarbon Processing - October 2021 - GP-24
Hydrocarbon Processing - October 2021 - GP-25
Hydrocarbon Processing - October 2021 - GP-26
Hydrocarbon Processing - October 2021 - GP-27
Hydrocarbon Processing - October 2021 - GP-28
Hydrocarbon Processing - October 2021 - GP-29
Hydrocarbon Processing - October 2021 - GP-30
Hydrocarbon Processing - October 2021 - GP-31
Hydrocarbon Processing - October 2021 - GP-32
Hydrocarbon Processing - October 2021 - GP-33
Hydrocarbon Processing - October 2021 - GP-34
Hydrocarbon Processing - October 2021 - GP-35
Hydrocarbon Processing - October 2021 - GP-36
Hydrocarbon Processing - October 2021 - GP-37
Hydrocarbon Processing - October 2021 - GP-38
Hydrocarbon Processing - October 2021 - GP-39
Hydrocarbon Processing - October 2021 - GP-40
Hydrocarbon Processing - October 2021 - GP-41
Hydrocarbon Processing - October 2021 - GP-42
Hydrocarbon Processing - October 2021 - GP-43
Hydrocarbon Processing - October 2021 - GP-44
https://www.nxtbook.com/gulfenergyinfo/gulfpub/HPI-Market-Data-2023-v3
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2024-v2
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2024
https://www.nxtbook.com/gulfenergyinfo/gulfpub/gas-processes-handbook-2022_v2
https://www.nxtbook.com/gulfenergyinfo/gulfpub/gas-processes-handbook-2022
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hp_202212
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2023-v2
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hp_202211
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202210
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202209
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202208
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202207_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202207
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202206_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202206
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202205_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202205
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202204_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202204
https://www.nxtbook.com/nxtbooks/gulfpub/hp_032022
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202203
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202202
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202201
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202112
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202111
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202110
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2022_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2022
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202109
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202108
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_processes_handbook_2021_v2
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_processes_handbook_2021
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202107
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202106
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202105
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202104
https://www.nxtbook.com/nxtbooks/gulfpub/hp_ebooks
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202103
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202102
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202101
https://www.nxtbook.com/nxtbooks/gulfpub/catalyst_handbook_2020_v2
https://www.nxtbook.com/nxtbooks/gulfpub/catalyst_handbook_2020
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202012
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202011
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202010
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2021
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202009
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202008
https://www.nxtbook.com/nxtbooks/gulfpub/refining_processes_handbook_2020
https://www.nxtbook.com/nxtbooks/gulfpub/refining_processes_handbook_2020_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202007
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202006
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202005
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202004
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202003
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202002
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202001
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201912
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201911
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2020_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2020
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201910
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201909
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201908
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201907
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201906
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201905
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201904
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201903
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201902
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201901
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_2018_v2
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_2018
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201812
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2019_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2019
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201811
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201810
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201809
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201808
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201807
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201806
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201805
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201804
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201803
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201802
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201801
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201712
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201711
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201710
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201709
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201708
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201707
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201706
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201705
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201704
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201703
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201702
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201701
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2017mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201612
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201611
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201610
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201609
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201608
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201607
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201606
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201605
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201604
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201603
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201602
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201601
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201512
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201511
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201510
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2016mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201509
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201508
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201507
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2015tmsd
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201506
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201505
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201504
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201503
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201502
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201501
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201412
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201411
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2015mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201410
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201409
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201408
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201407
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014petrochemicalprocesses_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014petrochemicalprocesses
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201406
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201405
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201404
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201403
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014calendar
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201402
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201401
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201312
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201311
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201310
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201309
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201308
https://www.nxtbook.com/nxtbooks/gulfpub/hp_srsguide2013
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201307
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201306
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201305
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201304
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201303
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201302
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201301
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201212
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201211
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201210
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201209
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201208
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201207
https://www.nxtbook.com/nxtbooks/gulfpub/hp_srsguide2012
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201206
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201205
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201204
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201203
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201202
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201201
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201112
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201111
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201110
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201109
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201108
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201107_srsguide
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201107
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201106
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201105
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201104
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201103
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201102
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201101
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201012
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201011
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201010
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201009
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201008
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201007
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201006
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201005
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201004
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201003
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201002
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201001
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200912
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200911
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200910
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200909
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200908
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200907
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200906
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200905
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200904
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200903
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200902
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200901
https://www.nxtbookmedia.com