Underground Construction - October 2017 - 34

20 17 C A PA B I LITI E S G U I D E
SPECIAL ADVERTISING SECTION

A Buried Maze of Pipes Puts
the FastBack® System to the Test

O

Our customer was a large gas distribution contractor who was facing
a tough challenge: they had a short bore job that required crossing six
different utilities. This 120-foot bore to install a 3-inch polyethylene gas
main meant weaving through one 6-inch high pressure gas main, one
6-inch low pressure cast iron gas main, one 6-inch water main and three
communications lines. It was a three-dimensional puzzle buried in the
ground. Though the red clay soil made for relatively easy drilling, this job
required precision and careful attention. There was no room for error.

The pilot bore went smoothly. Once at the receiving pit, the directional
housing had two FastReam Cutter Blocks installed. Two of the MudBoost
fluid ports were opened up to supply more fluid during the reaming and
pullback. A QuickSwivel was bolted to the blade and the 3" polyethylene
pipe was attached.
The two FastReam Cutter Blocks make a great backreamer for soft
to medium-hard soils. But another advantage is that there are only two
blades spaced apart and offset 180 degrees from one another. Because of
this, the operator was able to carefully adjust the position of the blades to
avoid a strike on one of the existing utilities while crossing. This was the
perfect set-up for a job of this complexity.
FastBack reamers are inspired by the design of our Terminator-style
reamer, which was originally developed or drilling clay. It's an efficient
cutter in soft to medium soils-but its advantage is that it only has two
blades. Because of this, the operator can carefully adjust the position of
the blades to avoid a strike on a line. Our pullback got off to a great start.
Everything was going beautifully. And then we reached the utilities.
When we got to the exposed pipes in each pit, we stopped the job to
assess the situation. This is where we had to be very careful. But the FastBack System was up to the job. We pulled one blade over, then rotated
180 degrees. Then we pulled the other blade over.
With a normal reamer, this action is impossible because the blades are
positioned too close. But the FastBack design is primed for this type of
accuracy. We were able to lace the pipe through while maintaining enough
clearance from all other lines.

34

ucononline.com

Before we began, the crew was skeptical. Why not just trench the job?
they asked. There was the inevitable grumbling that comes with trying
something new. After we finished, however, the crew was blown away
with the amount of time it saved. With a full trench, this job would have
taken at least two days for trenching, install and backfill. With the FastBack System, the whole job was completed in a single day. The drilling
only took a couple of hours. The majority of the time was spent manually
hollowing out the areas surrounding the existing lines.
Our FastBack System was the perfect solution to a complicated job like
this one. But our original impetus to develop this groundbreaking (no pun
intended) tooling was to make drillers safer and more efficient. The FastBack System reduces the need to haul a breakout system down into the
pit to install the reamer. Now crews can simply install FastReam cutter
blocks directly to the housing by using a set of Allen wrenches and other
small tools. Cleaning the housing and installing the cutter blocks can be
completed in a few minutes. The result is safer, quicker and easier to manage equipment that helps drillers get the job done better.

Underground Construction October 2017


http://www.ucononline.com

Underground Construction - October 2017

Table of Contents for the Digital Edition of Underground Construction - October 2017

Underground Construction - October 2017
Contents
Editor’s Log
Newsline
Washington Watch
Pipeline Projects
2017 Capabilities Guide
Vic Weston named 2018 MVP
Utility & Communications Construction Business Update
Family, Customer Values Fuel Growth Of CMW
Pipe Bursting: What Are The Technology Expectations?
Bursting In Grand Prairie
NASSCO Tech Tips: The Importance Of Proper Nozzle Selection
Products: Pipe Bursting/Trenchless Pipe Replacement
Business
New Products
Equipment Spotlight
Business Cards
Ad Index
Sales Reps
Calendar Of Events
The Last Word: NASSCO’s Response To Purdue University’s Findings On CIPP
Underground Construction - October 2017 - Underground Construction - October 2017
Underground Construction - October 2017 - IFC
Underground Construction - October 2017 - Contents
Underground Construction - October 2017 - Editor’s Log
Underground Construction - October 2017 - 3
Underground Construction - October 2017 - Newsline
Underground Construction - October 2017 - 5
Underground Construction - October 2017 - 6
Underground Construction - October 2017 - 7
Underground Construction - October 2017 - Washington Watch
Underground Construction - October 2017 - 9
Underground Construction - October 2017 - Pipeline Projects
Underground Construction - October 2017 - 11
Underground Construction - October 2017 - 2017 Capabilities Guide
Underground Construction - October 2017 - 13
Underground Construction - October 2017 - 14
Underground Construction - October 2017 - 15
Underground Construction - October 2017 - 16
Underground Construction - October 2017 - 17
Underground Construction - October 2017 - 18
Underground Construction - October 2017 - 19
Underground Construction - October 2017 - 20
Underground Construction - October 2017 - 21
Underground Construction - October 2017 - 22
Underground Construction - October 2017 - 23
Underground Construction - October 2017 - 24
Underground Construction - October 2017 - 25
Underground Construction - October 2017 - 26
Underground Construction - October 2017 - 27
Underground Construction - October 2017 - 28
Underground Construction - October 2017 - 29
Underground Construction - October 2017 - 30
Underground Construction - October 2017 - 31
Underground Construction - October 2017 - 32
Underground Construction - October 2017 - 33
Underground Construction - October 2017 - 34
Underground Construction - October 2017 - 35
Underground Construction - October 2017 - 36
Underground Construction - October 2017 - 37
Underground Construction - October 2017 - 38
Underground Construction - October 2017 - 39
Underground Construction - October 2017 - 40
Underground Construction - October 2017 - 41
Underground Construction - October 2017 - 42
Underground Construction - October 2017 - 43
Underground Construction - October 2017 - 44
Underground Construction - October 2017 - Vic Weston named 2018 MVP
Underground Construction - October 2017 - Utility & Communications Construction Business Update
Underground Construction - October 2017 - 47
Underground Construction - October 2017 - Family, Customer Values Fuel Growth Of CMW
Underground Construction - October 2017 - 49
Underground Construction - October 2017 - 50
Underground Construction - October 2017 - 51
Underground Construction - October 2017 - Pipe Bursting: What Are The Technology Expectations?
Underground Construction - October 2017 - 53
Underground Construction - October 2017 - Bursting In Grand Prairie
Underground Construction - October 2017 - 55
Underground Construction - October 2017 - NASSCO Tech Tips: The Importance Of Proper Nozzle Selection
Underground Construction - October 2017 - 57
Underground Construction - October 2017 - Products: Pipe Bursting/Trenchless Pipe Replacement
Underground Construction - October 2017 - Business
Underground Construction - October 2017 - 60
Underground Construction - October 2017 - 61
Underground Construction - October 2017 - New Products
Underground Construction - October 2017 - 63
Underground Construction - October 2017 - 64
Underground Construction - October 2017 - 65
Underground Construction - October 2017 - Equipment Spotlight
Underground Construction - October 2017 - Business Cards
Underground Construction - October 2017 - 68
Underground Construction - October 2017 - 69
Underground Construction - October 2017 - 70
Underground Construction - October 2017 - Calendar Of Events
Underground Construction - October 2017 - The Last Word: NASSCO’s Response To Purdue University’s Findings On CIPP
Underground Construction - October 2017 - IBC
Underground Construction - October 2017 - BC
Underground Construction - October 2017 - UCTFC
Underground Construction - October 2017 - UCTIFC
Underground Construction - October 2017 - UCT1
Underground Construction - October 2017 - UCT2
Underground Construction - October 2017 - UCT3
Underground Construction - October 2017 - UCT4
Underground Construction - October 2017 - UCT5
Underground Construction - October 2017 - UCT6
Underground Construction - October 2017 - UCT7
Underground Construction - October 2017 - UCT8
Underground Construction - October 2017 - UCT9
Underground Construction - October 2017 - UCT10
Underground Construction - October 2017 - UCT11
Underground Construction - October 2017 - UCT12
Underground Construction - October 2017 - UCT13
Underground Construction - October 2017 - UCT14
Underground Construction - October 2017 - UCT15
Underground Construction - October 2017 - UCT16
Underground Construction - October 2017 - UCT17
Underground Construction - October 2017 - UCT18
Underground Construction - October 2017 - UCT19
Underground Construction - October 2017 - UCT20
Underground Construction - October 2017 - UCT21
Underground Construction - October 2017 - UCT22
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-construction-december-2022
https://www.nxtbook.com/gulfenergyinfo/gulfpub/uc_202211
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202210
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202209
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202208
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202207
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202206
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202205
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202204
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202203
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202202
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202201
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202112
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202111
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202110
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202109
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202108
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202107
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202106
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202105
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202104
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202103
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202102
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202101
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202012
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202011
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202010
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202009
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202008
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202007
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202006
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202005
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202004
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202003
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202002
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202001
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201912
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201911
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201910
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201909
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201908
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201907
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201906
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_summer2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201905
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201904
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201903
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_winter2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201902
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201901
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201812
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201811
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201810
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201809
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201808
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201807
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201806
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201805
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201804
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201803
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201802
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201801
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201712
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201711
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201710
https://www.nxtbook.com/nxtbooks/gulfpub/uc_ditchwitch
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201709
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201708
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201707
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201706
https://www.nxtbookmedia.com