Underground Construction - January 2018 - 33

The more uncertain the existing conditions,

Improve
Performance.
Increase
Profits.

the more engineers need to compensate by
"over-designing" the structure. This has cost
and time ramifications. A great resource for
up-to-date research information on this topic is
the ASCE-ASME Journal of Risk and Uncertainty in
Infrastructure Systems.
sults from this relationship: how
much of what the engineer wants
to do is allowed by the owner, and
what if it seems to create the possibility of negligence or not meeting
standards and codes?

Role
Project owners, engineers and
contractors all play a role in eliminating some risk by reducing
uncertainty, and for uncertainty
that cannot be reduced, managing
the risks presented by the remaining uncertainty. There are many
landmark court cases that set forth
decisions regarding these uncertainties and the project owner-contractor relationship. There are far
fewer that involve the relationship
between project owner and engineers/architects.
According to these cases,
during project development, the
project owner (or its engineer, if
part of the scope) is responsible
for providing details of existing
conditions on the site, or being
financially responsible for the
consequences of an inadequate
investigation. Project owners usually accomplish this by hiring geotechnical engineers to investigate
ground conditions and subsurface
utility engineers to investigate
existing utilities. The American
Society of Civil Engineers has
January 2018 Underground Construction

provided guidance documents to
help project owners with these
subsurface investigations and how
to portray their results on contract
documents. Geotechnical Base Line
Reports, and ASCE 38-02 (Standard
Guideline for the Collection and Depiction of Existing Subsurface Utility
Data) are two prime documents
for communicating the risks of
existing condition investigations.
The Engineers Joint Contract
Documents Committee, a joint
venture of ASCE, ACEC and NSPE,
along with more than 20 other organizations, has set forth clear and
unambiguous contract language
for these responsibilities of the
project owner, its engineer and the
contractor.
In our next installment, we will
look specifically at contracts, GBRs
and ASCE 38 as means to reduce
and manage uncertainty.
About the Author: Jim Anspach
is technical practice lead for Cardno
Inc.'s Utility Engineering and Survey
Practice. He serves as ASCE's Utility
Engineering and Surveying Institute
President for 2018. He is the incoming chair for EJCDC, and chairs the
ASCE 38 Standard Committee. He
is also a member of ASCE's Board
Committee on Claims Reduction and
Management.

INROCK's CROSSVIEW® system is the first
electronic data recorder (EDR)
specifically designed for the HDD industry.
CrossView® consists of a system of sensors,
computers and networking equipment designed
to deliver critical rig information anywhere in the
world, in order to help you maximize the
efficiency of your drilling operation.

For more information,
call 1 (877) 2 INROCK or visit www.inrock.com
ucononline.com

33


http://www.inrock.com http://www.ucononline.com

Underground Construction - January 2018

Table of Contents for the Digital Edition of Underground Construction - January 2018

Underground Construction - January 2018
Contents
Editor’s Log
Newsline
Washington Watch
Pipeline Projects
Utility & Communications Construction Outlook
Will Oil Production, Natural Gas Price Upticks Lead to Pipeline Growth?
U.s. Pipeline Infrastructure Continues Forward Momentum
Plca Members Experience Construction Rebound
Making Pipe Dream a Reality
Dca President Mykyte Sees Progress on Workforce, Oq Issues
The Uncertainty of Working Underground
Contingency Planning Invaluable During Historic Rainfall in Memphis
Jeff Tinlin
Rehab Product Focus
Rehab New Products
Business
New Products
New Products
Equipment Spotlight
Equipment Spotlight
Business Cards
Calendar of Events
Sales Reps
Ad Index
Underground Construction - January 2018 - Underground Construction - January 2018
Underground Construction - January 2018 - IFC
Underground Construction - January 2018 - Contents
Underground Construction - January 2018 - Editor’s Log
Underground Construction - January 2018 - 3
Underground Construction - January 2018 - Newsline
Underground Construction - January 2018 - 5
Underground Construction - January 2018 - 6
Underground Construction - January 2018 - 7
Underground Construction - January 2018 - Washington Watch
Underground Construction - January 2018 - Pipeline Projects
Underground Construction - January 2018 - Utility & Communications Construction Outlook
Underground Construction - January 2018 - 11
Underground Construction - January 2018 - 12
Underground Construction - January 2018 - 13
Underground Construction - January 2018 - Will Oil Production, Natural Gas Price Upticks Lead to Pipeline Growth?
Underground Construction - January 2018 - 15
Underground Construction - January 2018 - U.s. Pipeline Infrastructure Continues Forward Momentum
Underground Construction - January 2018 - 17
Underground Construction - January 2018 - 18
Underground Construction - January 2018 - 19
Underground Construction - January 2018 - 20
Underground Construction - January 2018 - 21
Underground Construction - January 2018 - Plca Members Experience Construction Rebound
Underground Construction - January 2018 - 23
Underground Construction - January 2018 - Making Pipe Dream a Reality
Underground Construction - January 2018 - 25
Underground Construction - January 2018 - 26
Underground Construction - January 2018 - 27
Underground Construction - January 2018 - Dca President Mykyte Sees Progress on Workforce, Oq Issues
Underground Construction - January 2018 - 29
Underground Construction - January 2018 - 30
Underground Construction - January 2018 - 31
Underground Construction - January 2018 - The Uncertainty of Working Underground
Underground Construction - January 2018 - 33
Underground Construction - January 2018 - Contingency Planning Invaluable During Historic Rainfall in Memphis
Underground Construction - January 2018 - 35
Underground Construction - January 2018 - Jeff Tinlin
Underground Construction - January 2018 - 37
Underground Construction - January 2018 - 38
Underground Construction - January 2018 - 39
Underground Construction - January 2018 - 40
Underground Construction - January 2018 - Rehab Product Focus
Underground Construction - January 2018 - Rehab New Products
Underground Construction - January 2018 - Business
Underground Construction - January 2018 - 44
Underground Construction - January 2018 - 45
Underground Construction - January 2018 - 46
Underground Construction - January 2018 - 47
Underground Construction - January 2018 - New Products
Underground Construction - January 2018 - 49
Underground Construction - January 2018 - 50
Underground Construction - January 2018 - 51
Underground Construction - January 2018 - Equipment Spotlight
Underground Construction - January 2018 - Business Cards
Underground Construction - January 2018 - 54
Underground Construction - January 2018 - 55
Underground Construction - January 2018 - Ad Index
Underground Construction - January 2018 - IBC
Underground Construction - January 2018 - BC
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-construction-december-2022
https://www.nxtbook.com/gulfenergyinfo/gulfpub/uc_202211
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202210
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202209
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202208
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202207
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202206
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202205
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202204
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202203
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202202
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202201
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202112
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202111
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202110
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202109
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202108
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202107
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202106
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202105
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202104
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202103
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202102
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202101
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202012
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202011
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202010
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202009
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202008
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202007
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202006
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202005
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202004
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202003
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202002
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202001
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201912
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201911
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201910
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201909
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201908
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201907
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201906
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_summer2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201905
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201904
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201903
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_winter2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201902
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201901
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201812
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201811
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201810
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201809
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201808
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201807
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201806
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201805
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201804
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201803
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201802
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201801
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201712
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201711
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201710
https://www.nxtbook.com/nxtbooks/gulfpub/uc_ditchwitch
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201709
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201708
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201707
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201706
https://www.nxtbookmedia.com