Underground Construction - July 2018 - 37

the creek meets the Fraser
River. Because that was less
than 330 feet away from the
lowest manhole on the project, all means possible were
utilized to protect the waterway. It was decided that the
upper portion of the project
would be completed first and
bursting runs closer to the
creek would be scheduled
for later in the summer, in
anticipation of lower water
levels.
The bursting was divided
into seven runs averaging 350
feet each, for a total of 2,456
feet. The design required replacement of the existing 15inch PVC pipe with three sections of 34-inch DR 17 HDPE
and four sections of 28-inch
DR 17 HDPE. Maintaining the
grade of the pipe was critical
and with such a major upsize,

ground heaving was also a
concern.
The existing 41-inch-diameter manholes had to be
replaced with four 47-inch
and three 53-inch manholes.
Launch and exit pits -10 to
15 feet deep and up to 60 feet
long -were excavated at the
manhole locations to help facilitate removal and replacement of the existing manholes
after pipe bursting was completed.
Crews exposed the sanitary service connections in
order to be ready for re-connection to the new pipe. All
other adjacent services (water, gas) were also exposed
before pipe bursting. Prior to
each pull, the HDPE pipe was
fused onsite and equipped
with a special bursting head
assembly.

Expander heads

O'Sullivan explained the
unique approach: "We used a
three expander bursting head
assembly for this project. The
three expanders increased incrementally in diameter. This
triple expander configuration
provided a staged movement
of the soil, allowing it time to
relax before the next expansion came along."
In addition, PW Trenchless crews used lubrication to
reduce the ground friction,
pumping a mixture of bentonite and polymer through one
pre-fused pipe.
During pipe bursting, some
heaving occurred in the exposed service pits, but none on
the ground surface, just some
cracks along two sections of
34-inch pipe. Crews installed

new inspection chambers for
the re-connected services and
all of the newly installed manholes in Kanaka Creek Park
were sealed for odor control.
The pit locations were restored
and seeded.
And it was all done with
no disturbance to existing
utilities. "The CCTV post pipe
bursting confirmed a successful installation," said O'Sullivan. "Bursting times ranged
between 3 to 4 hours per run,
while removing the different
cones took s6to 8 hours. Set up
and break down was completed
over several days."
FOR MORE INFORMATION:
PW Trenchless Construction Inc.,
(604) 580-0446, pwtrenchless.com
TT Technologies, (800) 533-2078,
tttechnologies.com

Patent Pending

Experience a new way to Cure
One Step resin system from Interplastic Corporation is designed
to be a simpler, safer process for initiating a Cured-in-Place Pipe
(CIPP) resin. The One Step system is available with several
different resins including polyesters, both neat and enhanced,
vinyl ester and styrene free vinyl esters.
Benefits Include:
* Compeititve costs * Easier introduction of initiator to resin
* Energy cost savings * Labor savings
* Safer to use with no need for mixing a dust or flake
* Requires no heating * Minimizes premature liner gelation
Making quality CIPP resins for over 30 years.
1.800.736.5497
www.interplastic.com
© 2017 Interplastic Corporation. All rights reserved.

UConOnline.com | JULY 2018

37


http://www.pwtrenchless.com http://www.tttechnologies.com http://www.interplastic.com http://www.UConOnline.com

Underground Construction - July 2018

Table of Contents for the Digital Edition of Underground Construction - July 2018

Underground Construction - July 2018
Editor’s Log
Newsline
Washington Watch
Pipeline Projects
Utility & Communications Construction Update
Staff Changes, New Initiatives Highlight Busy Year for TTC
DCA/AGA Conduct 5th Annual Workshop; Panels Highlight Wide Range of Topics
TTC Works With Advancing Pipeline Condition Assessment Using Drones
CIPL Project Sets World Record
Nuclear CIPP
Major Bursting Upsize a success in Canada
Rehab Technology News
Rehab Technology Selection Guide
Business
New Products
Business Cards
Sales Reps
Events
Ad Index
Underground Construction - July 2018 - Underground Construction - July 2018
Underground Construction - July 2018 - IFC
Underground Construction - July 2018 - 1
Underground Construction - July 2018 - Editor’s Log
Underground Construction - July 2018 - 3
Underground Construction - July 2018 - Newsline
Underground Construction - July 2018 - 5
Underground Construction - July 2018 - Washington Watch
Underground Construction - July 2018 - 7
Underground Construction - July 2018 - Pipeline Projects
Underground Construction - July 2018 - 9
Underground Construction - July 2018 - Utility & Communications Construction Update
Underground Construction - July 2018 - 11
Underground Construction - July 2018 - 12
Underground Construction - July 2018 - 13
Underground Construction - July 2018 - Staff Changes, New Initiatives Highlight Busy Year for TTC
Underground Construction - July 2018 - 15
Underground Construction - July 2018 - 16
Underground Construction - July 2018 - 17
Underground Construction - July 2018 - 18
Underground Construction - July 2018 - 19
Underground Construction - July 2018 - DCA/AGA Conduct 5th Annual Workshop; Panels Highlight Wide Range of Topics
Underground Construction - July 2018 - 21
Underground Construction - July 2018 - 22
Underground Construction - July 2018 - 23
Underground Construction - July 2018 - TTC Works With Advancing Pipeline Condition Assessment Using Drones
Underground Construction - July 2018 - 25
Underground Construction - July 2018 - CIPL Project Sets World Record
Underground Construction - July 2018 - 27
Underground Construction - July 2018 - 28
Underground Construction - July 2018 - 29
Underground Construction - July 2018 - 30
Underground Construction - July 2018 - 31
Underground Construction - July 2018 - Nuclear CIPP
Underground Construction - July 2018 - 33
Underground Construction - July 2018 - 34
Underground Construction - July 2018 - Major Bursting Upsize a success in Canada
Underground Construction - July 2018 - 36
Underground Construction - July 2018 - 37
Underground Construction - July 2018 - Rehab Technology News
Underground Construction - July 2018 - Rehab Technology Selection Guide
Underground Construction - July 2018 - 40
Underground Construction - July 2018 - 41
Underground Construction - July 2018 - 42
Underground Construction - July 2018 - Business
Underground Construction - July 2018 - 44
Underground Construction - July 2018 - 45
Underground Construction - July 2018 - New Products
Underground Construction - July 2018 - 47
Underground Construction - July 2018 - 48
Underground Construction - July 2018 - 49
Underground Construction - July 2018 - 50
Underground Construction - July 2018 - Business Cards
Underground Construction - July 2018 - 52
Underground Construction - July 2018 - 53
Underground Construction - July 2018 - Ad Index
Underground Construction - July 2018 - 55
Underground Construction - July 2018 - 56
Underground Construction - July 2018 - IBC
Underground Construction - July 2018 - BC
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-construction-december-2022
https://www.nxtbook.com/gulfenergyinfo/gulfpub/uc_202211
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202210
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202209
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202208
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202207
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202206
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202205
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202204
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202203
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202202
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202201
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202112
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202111
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202110
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202109
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202108
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202107
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202106
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202105
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202104
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202103
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202102
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202101
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202012
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202011
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202010
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202009
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202008
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202007
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202006
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202005
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202004
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202003
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202002
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202001
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201912
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201911
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201910
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201909
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201908
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201907
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201906
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_summer2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201905
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201904
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201903
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_winter2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201902
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201901
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201812
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201811
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201810
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201809
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201808
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201807
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201806
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201805
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201804
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201803
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201802
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201801
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201712
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201711
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201710
https://www.nxtbook.com/nxtbooks/gulfpub/uc_ditchwitch
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201709
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201708
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201707
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201706
https://www.nxtbookmedia.com