Underground Construction - November 2021 - 29

2021 Large HDD Rigs Census
w: remdirectional.com
e: joel@remdirectional.com
contact: Joel Colgrove, Jr.
8 Rigs with Minimum 100,000 lbs. Pullback
Maximum Pipe Diameter: 64 in.
Maximum Pullback: 1,200,000 lbs.
Maximum Torque: 102,000 ft./lbs.
REM Directional has been in the
trenchless business for 23 years.
Sabine Constructors LLC
721 Dial Road
Big Sandy, Texas 72755
p: (903) 352-1201
e: jbender@sabinecon.com
contact: Jake Bender
2 Rigs with Minimum 100,000 lbs. Pullback
Maximum Pipe Diameter: 30 in.
Maximum Pullback: 250,000 lbs.
Maximum Torque: 40,000 ft./lbs.
Southeast Directional Drilling LLC
3117 North Cessna Ave.
Casa Grande, Ariz. 85122
p: (520) 423-2131
w: southeastdrilling.com
11 Rigs with Minimum 100,000 lbs. Pullback
Maximum Pipe Diameter: 60 in.
Maximum Pullback: 1,400,000 lbs.
Maximum Torque: 140,000 ft./lbs.
Capable of drilling lengths of more than
6,400 feet and pipe sizes up to 60-inch
diameter. We are the world record holder
for 56-inch HDD.
Spartan Directional LLC
222 Beau Pre Road
Lafayette, La. 70508
p: (337) 837-4433
w: spartandirectional.com
e: boyd@spartandirectional.com
contact: Boyd Simon
6 Rigs with Minimum 100,000 lbs. Pullback
Maximum Pipe Diameter: 54 in.
Maximum Pullback: 1,000,000 lbs.
Maximum Torque: 90,000 ft./lbs.
Maxi rig HDD projects, Spartan Directional
is the best choice for maxi-rig HDD
projects " Because Experience Matters; "
most-experienced superintendents and
personnel in the industry.
Spring & Associates Inc.
29565 Chilcutt Rd.
Easton, Md. 21601
p: (410) 822-0485
w: springandassociates.com
e: dtaylor@springgroup.net
contact: Robert Taylor
3 Rigs with Minimum 100,000 lbs. Pullback
Maximum Pipe Diameter: 48 in.
Maximum Pullback: 500,000 lbs.
Maximum Torque: 85,000 ft./lbs.
Microtunneling up to 84 inches, HDD
bores of 1-48 inches, on-grade sewer
with pilot tube system, and steel jack
and bore up to 84 inches.
Tex-Direct Drilling LLC
22095 FM 1314
Porter, Texas 77365
p: (281) 354-7011
w: tex-direct.com
e: wayne@tex-direct.com
contact: Wayne Robin
2 Rigs with Minimum 100,000 lbs. Pullback
Maximum Pipe Diameter: 42 in.
Maximum Pullback: 750,000 lbs.
Maximum Torque: 90,000 ft./lbs.
State-of-the-art equipment and over 25
years in the industry. Carefully planned
and safely executed HDD solutions, and
specializing in complex, multi-rig projects.
The Crossing Company Inc.
1807 8th St.
Nisku, Alberta, Canada T9E 7S8
p: (780) 955-5051
w: thecrossingcompany.com
e: rbowhay@thecrossingcompany.com
contact: Ryan Bowhay
22 Rigs with Minimum 100,000 lbs.
Pullback
Maximum Pipe Diameter: 60 in.
Maximum Pullback: 1,200,000 lbs.
Maximum Torque: 100,000 ft./lbs.
Focused on trenchless construction
throughout North America. Services
include large and small HDD, auger
boring, pipe ramming, microtunneling
and tunneling.
The HDD Company
4525 Serrano Parkway, Suite 210
El Dorado Hills, Calif. 95762
p: (530) 676-5705
w: thecrossingcompany.com
e: jking@crossinggroup.com;
nswope@crossinggroup.com
contact: Jeremy King; Neil Swope
28 Rigs with Minimum 100,000 lbs.
Pullback
Maximum Pipe Diameter: 48 in.
Maximum Pullback: 1,200,000 lbs.
Maximum Torque: 90,000 ft./lbs.
Excelling at shore approaches, harbor/
marine work, major utility installations,
and oil and gas projects has made us a
trusted name in trenchless construction.
TWS Drilling & Construction LLC
721 Dial Road
Big Sandy, Texas 72755
p: (903) 352-1201
w: twsdrilling.com
e: jbender@stwsdrilling.com
contact: Jake Bender
4 Rigs with Minimum 100,000 lbs. Pullback
Maximum Pipe Diameter: 36 in.
Maximum Pullback: 500,000 lbs.
Maximum Torque: 50,000 ft./lbs.
Visser & Smit Hanab bv
Rietgorsweg 6
3356 LJ Papendrecht NL
p: +31 78 6417222
w: vshanab.nl
e: info@vshanab.nl
contact: JA Ringets
4 Rigs with Minimum 100,000 lbs. Pullback
Maximum Pipe Diameter: 48 in.
Maximum Pullback: 650,000 lbs.
More than 100 years of experience and
a proven record of service, specializing
in aboveground and underground
pipelines and cable infrastructure.
UCONonline.com | NOVEMBER 2021 29
http://www.remdirectional.com http://www.spartandirectional.com http://www.twsdrilling.com http://www.thecrossingcompany.com http://www.springandassociates.com http://www.southeastdrilling.com http://www.vshanab.nl http://www.thecrossingcompany.com http://www.tex-direct.com http://www.hardingdrilling.com/ http://www.UCONonline.com

Underground Construction - November 2021

Table of Contents for the Digital Edition of Underground Construction - November 2021

Contents
Underground Construction - November 2021 - Cover1
Underground Construction - November 2021 - Cover2
Underground Construction - November 2021 - Contents
Underground Construction - November 2021 - 4
Underground Construction - November 2021 - 5
Underground Construction - November 2021 - 6
Underground Construction - November 2021 - 7
Underground Construction - November 2021 - 8
Underground Construction - November 2021 - 9
Underground Construction - November 2021 - 10
Underground Construction - November 2021 - 11
Underground Construction - November 2021 - 12
Underground Construction - November 2021 - 13
Underground Construction - November 2021 - 14
Underground Construction - November 2021 - 15
Underground Construction - November 2021 - 16
Underground Construction - November 2021 - 17
Underground Construction - November 2021 - 18
Underground Construction - November 2021 - 19
Underground Construction - November 2021 - 20
Underground Construction - November 2021 - 21
Underground Construction - November 2021 - 22
Underground Construction - November 2021 - 23
Underground Construction - November 2021 - 24
Underground Construction - November 2021 - 25
Underground Construction - November 2021 - 26
Underground Construction - November 2021 - 27
Underground Construction - November 2021 - 28
Underground Construction - November 2021 - 29
Underground Construction - November 2021 - 30
Underground Construction - November 2021 - 31
Underground Construction - November 2021 - 32
Underground Construction - November 2021 - 33
Underground Construction - November 2021 - 34
Underground Construction - November 2021 - 35
Underground Construction - November 2021 - 36
Underground Construction - November 2021 - 37
Underground Construction - November 2021 - 38
Underground Construction - November 2021 - 39
Underground Construction - November 2021 - 40
Underground Construction - November 2021 - 41
Underground Construction - November 2021 - 42
Underground Construction - November 2021 - 43
Underground Construction - November 2021 - 44
Underground Construction - November 2021 - 45
Underground Construction - November 2021 - 46
Underground Construction - November 2021 - 47
Underground Construction - November 2021 - 48
Underground Construction - November 2021 - 49
Underground Construction - November 2021 - 50
Underground Construction - November 2021 - Cover3
Underground Construction - November 2021 - Cover4
Underground Construction - November 2021 - UCT1
Underground Construction - November 2021 - UCT2
Underground Construction - November 2021 - UCT3
Underground Construction - November 2021 - UCT4
Underground Construction - November 2021 - UCT5
Underground Construction - November 2021 - UCT6
Underground Construction - November 2021 - UCT7
Underground Construction - November 2021 - UCT8
Underground Construction - November 2021 - UCT9
Underground Construction - November 2021 - UCT10
Underground Construction - November 2021 - UCT11
Underground Construction - November 2021 - UCT12
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-construction-december-2022
https://www.nxtbook.com/gulfenergyinfo/gulfpub/uc_202211
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202210
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202209
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202208
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202207
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202206
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202205
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202204
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202203
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202202
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202201
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202112
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202111
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202110
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202109
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202108
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202107
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202106
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202105
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202104
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202103
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202102
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202101
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202012
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202011
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202010
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202009
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202008
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202007
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202006
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202005
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202004
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202003
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202002
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202001
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201912
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201911
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201910
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201909
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201908
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201907
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201906
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_summer2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201905
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201904
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201903
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_winter2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201902
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201901
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201812
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201811
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201810
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201809
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201808
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201807
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201806
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201805
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201804
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201803
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201802
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201801
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201712
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201711
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201710
https://www.nxtbook.com/nxtbooks/gulfpub/uc_ditchwitch
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201709
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201708
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201707
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201706
https://www.nxtbookmedia.com