52 I E E E E l e c t r i f i cati o n M agaz ine / MARCH 2020 PV Array C 103 Wind Turbine C 102 Diesel C 101 Microgrid Bus 1 C 106 PV SIM C 107 CB 302 Wind SIM BESS C 108 V-A (V, Hz) V-B (V, Hz) V-C (V, Hz) Service Bus Figure 2. The CANREL one-line diagram. SIM: simulator; CAP: capacitor; EV: electric vehicle. Test Bay 1 C 105 Grid 13.8 kV-600/347 V C 109 Load Bank 1 CB 104 CB 300 Cap Bank C 209 Test Bay 3 C 204 C 205 V-A (V, Hz) V-B (V, Hz) V-C (V, Hz) Grid SIM Test Bay 2 Microgrid Bus 2 EV Chargers CB 210 V-A (V, Hz) V-B (V, Hz) V-C (V, Hz) Load Bank 2 CB 208 P (kW) Q (kVAR) S (kVA) CB 301 Main Switchgear