IEEE Power & Energy Magazine - July/August 2016 - 57

160
120

On Time
With Delays

80
40

20
02
20
03
20
04
20
0
20 5
06
20
07
20
08
20
0
20 9
10
20
11
20
12

0

(a)
22
20
18
16
14
12
10

20
02
20
03
20
04
20
0
20 5
06
20
07
20
08
20
0
20 9
10
20
11
20
12

Accumulated Average Time
for Obtaining Installation
Licencing (Months)

Accumulated Number of
Sets of Facilities Concluded
in Time and with Delays (-)

period and the accumulate average time required for obtaining the installation license, within the environmental-licensing process that allows construction works to begin, in the
same period. The deteriorating conditions since the late
2000s is clear, and it is worth mentioning that, as of January
2016, 62% of transmission facilities under implementation in
Brazil were delayed.
Acquisition of rights-of-way and social-environmental
licensing currently take place after the auction and responsibilities are assigned to the concessionaire. The increasing
uncertainty in the costs and times for the completion of these
tasks exposes transmission companies to financial risks, due
both to cost-overruns and to penalties and foregone revenues
in case of delays. Even though concession contracts include
waivers for penalties if these are caused by actions not attributable to transmitters, as in the case of delays by licensing
bodies, diffuse attributions during the licensing process
contribute to the perception of risks by concessionaires.
The impacts of implementation issues over the actual
COD of facilities are twofold: 1) the direct shift in the
implementation schedule of facilities effectively awarded
as a result of auctions and 2) the postponement of the date
at which the implementation efforts will actually begin if
a concession fails to receive valid bids in an auction and is
relocated to a subsequent tender. The latter factor should not
be underestimated; e.g., the second circuit of the 500-kV
Paulo Afonso-Luiz Gonzaga transmission line was initially
going to be offered in an auction held in January 2015 and

had its target contractual COD set to March 2018, but it was
relocated to an auction held in April 2016, with the contractual COD postponed to December 2019.
Delays in the effective COD, with respect to the date originally set by the system planner, impact not only transmission
companies but also grid users. Generators participating in
auctions for long-term contracts in Brazil are, presently, formally exposed to financial risks due to the impossibility of
injecting power to the grid and covering contractual obligations, if there are delays in the COD of transmission assets
required for their grid integration. These risks had been previously allocated to consumers (buyers) but were reallocated to
generators in 2013. Assigning risks to transmitters via penalties that matched the contractual financial damages was not
possible in practice; the fact that the auctioning of concessions
results in several, yet smaller-scaled, concessionaires caused
an unbearable financial burden for most transmitters.

Seeking Solutions to
the Implementation Conundrum
Brazilian power sector institutions are devising strategies
to overcome these implementation problems. The strategies implemented or currently under investigation fall
into three main groups.
Drive Toward Proactive Transmission
Expansion Planning

The Energy Planning Enterprise (EPE) already took the first
steps toward proactive planning. In the context of this article,
this means seeking to identify transmission expansion needs
with as much antecedence as possible, to give transmission
companies extended times for implementing the facilities, thus
reducing the probability of delays. This is particularly important for facilities needed for integrating new generation to the
system. In Brazil, and in the other countries analyzed here, the
generation segment is liberalized, and its expansion is the result
of competition. Historically, network facilities were required to
allow the for evacuation of generation to the load centers that
were planned and auctioned only after the outcomes of generation auctions were known, which was made possible by the
then-shorter transmission implementation times. Since implementation delays present serious barriers to this approach,
EPE is seeking to use the best-available information to identify regions with remarkable (renewable) generation potential
before generation auctions and plan transmission to allow
access to these resources, while avoiding picking winners during the auctions. Figure 4 shows examples of facilities (those
marked in opaque red/green) planned under this mechanism
and auctioned in 2014.

(b)

figure 3. The accumulated number of projects (a) concluded on time and with delays and (b) accumulated average
time required to obtain environmental licensing in the
2002-2012 period.
58

ieee power & energy magazine

Stronger Role of State and Improvements
in Social-Environmental Licensing

Different governmental spheres are seeking mechanisms
to improve the environmental licensing process, also in an
effort to mitigate delays and increase the attractiveness of
july/august 2016



Table of Contents for the Digital Edition of IEEE Power & Energy Magazine - July/August 2016

IEEE Power & Energy Magazine - July/August 2016 - Cover1
IEEE Power & Energy Magazine - July/August 2016 - Cover2
IEEE Power & Energy Magazine - July/August 2016 - 1
IEEE Power & Energy Magazine - July/August 2016 - 2
IEEE Power & Energy Magazine - July/August 2016 - 3
IEEE Power & Energy Magazine - July/August 2016 - 4
IEEE Power & Energy Magazine - July/August 2016 - 5
IEEE Power & Energy Magazine - July/August 2016 - 6
IEEE Power & Energy Magazine - July/August 2016 - 7
IEEE Power & Energy Magazine - July/August 2016 - 8
IEEE Power & Energy Magazine - July/August 2016 - 9
IEEE Power & Energy Magazine - July/August 2016 - 10
IEEE Power & Energy Magazine - July/August 2016 - 11
IEEE Power & Energy Magazine - July/August 2016 - 12
IEEE Power & Energy Magazine - July/August 2016 - 13
IEEE Power & Energy Magazine - July/August 2016 - 14
IEEE Power & Energy Magazine - July/August 2016 - 15
IEEE Power & Energy Magazine - July/August 2016 - 16
IEEE Power & Energy Magazine - July/August 2016 - 17
IEEE Power & Energy Magazine - July/August 2016 - 18
IEEE Power & Energy Magazine - July/August 2016 - 19
IEEE Power & Energy Magazine - July/August 2016 - 20
IEEE Power & Energy Magazine - July/August 2016 - 21
IEEE Power & Energy Magazine - July/August 2016 - 22
IEEE Power & Energy Magazine - July/August 2016 - 23
IEEE Power & Energy Magazine - July/August 2016 - 24
IEEE Power & Energy Magazine - July/August 2016 - 25
IEEE Power & Energy Magazine - July/August 2016 - 26
IEEE Power & Energy Magazine - July/August 2016 - 27
IEEE Power & Energy Magazine - July/August 2016 - 28
IEEE Power & Energy Magazine - July/August 2016 - 29
IEEE Power & Energy Magazine - July/August 2016 - 30
IEEE Power & Energy Magazine - July/August 2016 - 31
IEEE Power & Energy Magazine - July/August 2016 - 32
IEEE Power & Energy Magazine - July/August 2016 - 33
IEEE Power & Energy Magazine - July/August 2016 - 34
IEEE Power & Energy Magazine - July/August 2016 - 35
IEEE Power & Energy Magazine - July/August 2016 - 36
IEEE Power & Energy Magazine - July/August 2016 - 37
IEEE Power & Energy Magazine - July/August 2016 - 38
IEEE Power & Energy Magazine - July/August 2016 - 39
IEEE Power & Energy Magazine - July/August 2016 - 40
IEEE Power & Energy Magazine - July/August 2016 - 41
IEEE Power & Energy Magazine - July/August 2016 - 42
IEEE Power & Energy Magazine - July/August 2016 - 43
IEEE Power & Energy Magazine - July/August 2016 - 44
IEEE Power & Energy Magazine - July/August 2016 - 45
IEEE Power & Energy Magazine - July/August 2016 - 46
IEEE Power & Energy Magazine - July/August 2016 - 47
IEEE Power & Energy Magazine - July/August 2016 - 48
IEEE Power & Energy Magazine - July/August 2016 - 49
IEEE Power & Energy Magazine - July/August 2016 - 50
IEEE Power & Energy Magazine - July/August 2016 - 51
IEEE Power & Energy Magazine - July/August 2016 - 52
IEEE Power & Energy Magazine - July/August 2016 - 53
IEEE Power & Energy Magazine - July/August 2016 - 54
IEEE Power & Energy Magazine - July/August 2016 - 55
IEEE Power & Energy Magazine - July/August 2016 - 56
IEEE Power & Energy Magazine - July/August 2016 - 57
IEEE Power & Energy Magazine - July/August 2016 - 58
IEEE Power & Energy Magazine - July/August 2016 - 59
IEEE Power & Energy Magazine - July/August 2016 - 60
IEEE Power & Energy Magazine - July/August 2016 - 61
IEEE Power & Energy Magazine - July/August 2016 - 62
IEEE Power & Energy Magazine - July/August 2016 - 63
IEEE Power & Energy Magazine - July/August 2016 - 64
IEEE Power & Energy Magazine - July/August 2016 - 65
IEEE Power & Energy Magazine - July/August 2016 - 66
IEEE Power & Energy Magazine - July/August 2016 - 67
IEEE Power & Energy Magazine - July/August 2016 - 68
IEEE Power & Energy Magazine - July/August 2016 - 69
IEEE Power & Energy Magazine - July/August 2016 - 70
IEEE Power & Energy Magazine - July/August 2016 - 71
IEEE Power & Energy Magazine - July/August 2016 - 72
IEEE Power & Energy Magazine - July/August 2016 - 73
IEEE Power & Energy Magazine - July/August 2016 - 74
IEEE Power & Energy Magazine - July/August 2016 - 75
IEEE Power & Energy Magazine - July/August 2016 - 76
IEEE Power & Energy Magazine - July/August 2016 - 77
IEEE Power & Energy Magazine - July/August 2016 - 78
IEEE Power & Energy Magazine - July/August 2016 - 79
IEEE Power & Energy Magazine - July/August 2016 - 80
IEEE Power & Energy Magazine - July/August 2016 - 81
IEEE Power & Energy Magazine - July/August 2016 - 82
IEEE Power & Energy Magazine - July/August 2016 - 83
IEEE Power & Energy Magazine - July/August 2016 - 84
IEEE Power & Energy Magazine - July/August 2016 - 85
IEEE Power & Energy Magazine - July/August 2016 - 86
IEEE Power & Energy Magazine - July/August 2016 - 87
IEEE Power & Energy Magazine - July/August 2016 - 88
IEEE Power & Energy Magazine - July/August 2016 - 89
IEEE Power & Energy Magazine - July/August 2016 - 90
IEEE Power & Energy Magazine - July/August 2016 - 91
IEEE Power & Energy Magazine - July/August 2016 - 92
IEEE Power & Energy Magazine - July/August 2016 - 93
IEEE Power & Energy Magazine - July/August 2016 - 94
IEEE Power & Energy Magazine - July/August 2016 - 95
IEEE Power & Energy Magazine - July/August 2016 - 96
IEEE Power & Energy Magazine - July/August 2016 - 97
IEEE Power & Energy Magazine - July/August 2016 - 98
IEEE Power & Energy Magazine - July/August 2016 - 99
IEEE Power & Energy Magazine - July/August 2016 - 100
IEEE Power & Energy Magazine - July/August 2016 - 101
IEEE Power & Energy Magazine - July/August 2016 - 102
IEEE Power & Energy Magazine - July/August 2016 - 103
IEEE Power & Energy Magazine - July/August 2016 - 104
IEEE Power & Energy Magazine - July/August 2016 - 105
IEEE Power & Energy Magazine - July/August 2016 - 106
IEEE Power & Energy Magazine - July/August 2016 - 107
IEEE Power & Energy Magazine - July/August 2016 - 108
IEEE Power & Energy Magazine - July/August 2016 - 109
IEEE Power & Energy Magazine - July/August 2016 - 110
IEEE Power & Energy Magazine - July/August 2016 - 111
IEEE Power & Energy Magazine - July/August 2016 - 112
IEEE Power & Energy Magazine - July/August 2016 - 113
IEEE Power & Energy Magazine - July/August 2016 - 114
IEEE Power & Energy Magazine - July/August 2016 - Cover3
IEEE Power & Energy Magazine - July/August 2016 - Cover4
https://www.nxtbook.com/nxtbooks/pes/powerenergy_091020
https://www.nxtbook.com/nxtbooks/pes/powerenergy_070820
https://www.nxtbook.com/nxtbooks/pes/powerenergy_050620
https://www.nxtbook.com/nxtbooks/pes/powerenergy_030420
https://www.nxtbook.com/nxtbooks/pes/powerenergy_010220
https://www.nxtbook.com/nxtbooks/pes/powerenergy_111219
https://www.nxtbook.com/nxtbooks/pes/powerenergy_091019
https://www.nxtbook.com/nxtbooks/pes/powerenergy_070819
https://www.nxtbook.com/nxtbooks/pes/powerenergy_050619
https://www.nxtbook.com/nxtbooks/pes/powerenergy_030419
https://www.nxtbook.com/nxtbooks/pes/powerenergy_010219
https://www.nxtbook.com/nxtbooks/pes/powerenergy_111218
https://www.nxtbook.com/nxtbooks/pes/powerenergy_091018
https://www.nxtbook.com/nxtbooks/pes/powerenergy_070818
https://www.nxtbook.com/nxtbooks/pes/powerenergy_050618
https://www.nxtbook.com/nxtbooks/pes/powerenergy_030418
https://www.nxtbook.com/nxtbooks/pes/powerenergy_010218
https://www.nxtbook.com/nxtbooks/pes/powerenergy_111217
https://www.nxtbook.com/nxtbooks/pes/powerenergy_091017
https://www.nxtbook.com/nxtbooks/pes/powerenergy_070817
https://www.nxtbook.com/nxtbooks/pes/powerenergy_050617
https://www.nxtbook.com/nxtbooks/pes/powerenergy_030417
https://www.nxtbook.com/nxtbooks/pes/powerenergy_010217
https://www.nxtbook.com/nxtbooks/pes/powerenergy_111216
https://www.nxtbook.com/nxtbooks/pes/powerenergy_091016
https://www.nxtbook.com/nxtbooks/pes/powerenergy_070816
https://www.nxtbook.com/nxtbooks/pes/powerenergy_050616
https://www.nxtbook.com/nxtbooks/pes/powerenergy_030416
https://www.nxtbook.com/nxtbooks/pes/powerenergy_010216
https://www.nxtbook.com/nxtbooks/ieee/powerenergy_010216
https://www.nxtbook.com/nxtbooks/pes/powerenergy_111215
https://www.nxtbook.com/nxtbooks/pes/powerenergy_091015
https://www.nxtbook.com/nxtbooks/pes/powerenergy_070815
https://www.nxtbook.com/nxtbooks/pes/powerenergy_050615
https://www.nxtbook.com/nxtbooks/pes/powerenergy_030415
https://www.nxtbook.com/nxtbooks/pes/powerenergy_010215
https://www.nxtbook.com/nxtbooks/pes/powerenergy_111214
https://www.nxtbook.com/nxtbooks/pes/powerenergy_091014
https://www.nxtbook.com/nxtbooks/pes/powerenergy_070814
https://www.nxtbook.com/nxtbooks/pes/powerenergy_050614
https://www.nxtbook.com/nxtbooks/pes/powerenergy_030414
https://www.nxtbook.com/nxtbooks/pes/powerenergy_010214
https://www.nxtbookmedia.com