Underground Construction - February 2021 - 40

First Look: Robots Tackle Underground Pipe Repair
all the way down to minimally sized robots.
While some energy chains can be made
of metal, they require maintenance. The
weight of machine components has led to
the use of more lightweight components,
such as plastic. The tech-up, cost-down
igus energy chains require no maintenance,
resist dirt and can reduce installation costs
by 88 percent.
In the Crawler, an energy chain allows
the wheel width to be adjusted as it moves
within the penstock. Diameters vary from 5
to 1.5 to 13 meters, and the automated unit
is adjusted through the umbilical cord that is
controlled by the command center operator.
Energy chains are also used to manage
and protect electrical cables going from
the lower control cabinets to the upper
cabinets. They are used in the main boom
raise, which allows the boom to extend and
contract as it works within the pipe.
There are also servo motor cables that
direct boom movement and in the 1,640foot umbilical cord that contains power
and control cables, along with fiber optic

PIPE

FUSION AS
EASY AS...

cables. A grease-free slewing ring bearing
allows the boom to pivot from side to side
without the worry of future maintenance.

Infrastructure challenge
Besides safety, the Crawler offers one other
primary advantage for communities and
businesses. The devices work more quickly,
efficiently and safely than manual labor.
There is also no question that it meets
necessary needs. The world's infrastructure
is crumbling. Whether it is the United
States, Canada, Europe or elsewhere, there
are plenty of projects that require rehabilitation and restoration. In December, for
instance, the United Kingdom government
authorized spending €400 million (about
$478 million) to invest in Northern
Ireland's infrastructure.
The World Economic Forum's gloomy
forecast from 2019 said the world was
facing a $15-trillion gap between projected
investment and the amount needed to provide adequate global infrastructure by 2040.
The Crawler will help reduce labor costs

on projects. " Similar to any automation
project, it's going to reduce the amount of
manual labor required,'' Kronz said. " The
work will also be more consistent. Just not
cosmetically superior. It's going to be far
superior to somebody working overhead
and dangling within the pipe. "
And safety? Robots can be rebuilt if an
accident occurs. Human lives cannot be
restored. There is no price tag for the loss
of human life.
" Any tunnels that are being built are
going to need rehab over time, " Garvoille
said. " It's not limited to water or liquid
applications. It could be used in any
tunnel that is being built. "
FOR MORE INFORMATION:
Remote Orbital Installations, (608) 845-0360,
roi360.com
Big Sky Engineering, (608) 848-9898, bigskyeng.
com
igus, (800) 521-2747, igus.com

DAN THOMPSON is the energy chain industry
manager for igus, N.A.

Choose your fusion control level:

1 2 3
Operatorcontrolled
carriage position
and times during
fusion process

Softwarecontrolled shift
sequence and
heating / fusion
times with onscreen prompts

Fully automatic,
automatic,
software-controlled
process

TRACSTAR® iSERIES
A new family of fusion machines builds on the TracStar's rugged, self-contained
tracked vehicle while adding industry-changing technology for an improved user
experience across three new models. Powered by the new FusionGuide™
Control System, integrated software guides the user through every step of the
fusion process to ensure consistent fusions that adhere to industry standards.
TracStar 630i

LEARN MORE at mcelroy.com/iseries
©2021. MMI block, TracStar and DataLogger are registered trademarks of McElroy Manufacturing Inc. FusionGuide is a trademark of McElroy Manufacturing Inc. All Rights Reserved.

40

FEBRUARY 2021 | UCONonline.com


http://www.roi360.com http://www.bigskyeng.com http://www.bigskyeng.com http://www.igus.com http://www.mcelroy.com/iseries http://www.UCONonline.com

Underground Construction - February 2021

Table of Contents for the Digital Edition of Underground Construction - February 2021

Contents
Underground Construction - February 2021 - Cover1
Underground Construction - February 2021 - Cover2
Underground Construction - February 2021 - Contents
Underground Construction - February 2021 - 4
Underground Construction - February 2021 - 5
Underground Construction - February 2021 - 6
Underground Construction - February 2021 - 7
Underground Construction - February 2021 - 8
Underground Construction - February 2021 - 9
Underground Construction - February 2021 - 10
Underground Construction - February 2021 - 11
Underground Construction - February 2021 - 12
Underground Construction - February 2021 - 13
Underground Construction - February 2021 - 14
Underground Construction - February 2021 - 15
Underground Construction - February 2021 - 16
Underground Construction - February 2021 - 17
Underground Construction - February 2021 - 18
Underground Construction - February 2021 - 19
Underground Construction - February 2021 - 20
Underground Construction - February 2021 - 21
Underground Construction - February 2021 - 22
Underground Construction - February 2021 - 23
Underground Construction - February 2021 - 24
Underground Construction - February 2021 - 25
Underground Construction - February 2021 - 26
Underground Construction - February 2021 - 27
Underground Construction - February 2021 - 28
Underground Construction - February 2021 - 29
Underground Construction - February 2021 - 30
Underground Construction - February 2021 - 31
Underground Construction - February 2021 - 32
Underground Construction - February 2021 - 33
Underground Construction - February 2021 - 34
Underground Construction - February 2021 - 35
Underground Construction - February 2021 - 36
Underground Construction - February 2021 - 37
Underground Construction - February 2021 - 38
Underground Construction - February 2021 - 39
Underground Construction - February 2021 - 40
Underground Construction - February 2021 - 41
Underground Construction - February 2021 - 42
Underground Construction - February 2021 - 43
Underground Construction - February 2021 - 44
Underground Construction - February 2021 - 45
Underground Construction - February 2021 - 46
Underground Construction - February 2021 - 47
Underground Construction - February 2021 - 48
Underground Construction - February 2021 - 49
Underground Construction - February 2021 - 50
Underground Construction - February 2021 - Cover3
Underground Construction - February 2021 - Cover4
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-construction-december-2022
https://www.nxtbook.com/gulfenergyinfo/gulfpub/uc_202211
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202210
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202209
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202208
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202207
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202206
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202205
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202204
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202203
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202202
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202201
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202112
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202111
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202110
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202109
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202108
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202107
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202106
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202105
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202104
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202103
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202102
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202101
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202012
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202011
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202010
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202009
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202008
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202007
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202006
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202005
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202004
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202003
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202002
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202001
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201912
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201911
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201910
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201909
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201908
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201907
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201906
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_summer2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201905
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201904
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201903
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_winter2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201902
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201901
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201812
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201811
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201810
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201809
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201808
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201807
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201806
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201805
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201804
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201803
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201802
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201801
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201712
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201711
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201710
https://www.nxtbook.com/nxtbooks/gulfpub/uc_ditchwitch
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201709
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201708
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201707
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201706
https://www.nxtbookmedia.com