In March 2016, 16 inches of rain
fell on the city of Memphis, TN,
half of which fell during a two-day
deluge. This unprecedented rainfall
eroded the soil supporting a 96inch sanitary sewer main that carried wastewater to one of the city's
central treatment plants.
The damaged sewer main
crossed South Cypress Creek and
carried wastewater to the T.E.
Maxson Wastewater Treatment
Plant in Memphis. With nearly 40
million gallons per day (MGD) of
raw sewage escaping into Cypress
Creek, an emergency bypass was
needed to facilitate the repair work
on the existing sewer main.
City officials immediately activated their Emergency Response
Plan, gathering the management
team from the Public Works Division and bringing in global water technology authority Xylem
to help assess the damage and
map out an action plan. Xylem
mobilized an expert team and
cutting-edge pumps and accessories, delivering a comprehensive
turnkey solution that was up and
running in record time.
The emergency bypass system
needed to handle 160 MGD at
peak flow. Before pumping could
begin, several "critical path" construction projects were required
to support the bypass, including
a 2,400-foot-long, 40-foot-wide

34

ucononline.com

road through swamp land, so
the site could be accessed. Over
6,500 yards of recycled material was hauled in to act as a base
for the right-of-way. In addition,
two 86-inch culverts, side-by-side,
each 100 feet long, were installed
to contain the bypass piping as it
crossed Cypress Creek.
A suction pit, measuring 150
feet wide on each side and 40
feet deep, was created to hold the
pumps; the base of the pit was
built using 40,000 cubic yards of
imported material.
Typically, this magnitude of a
bypass pumping solution would
take between two and three weeks
to be designed and constructed.
However, the team of nearly 200
people completed the emergency
task in just six days.

Dewatering solution
Fourteen Godwin Dri-Prime
CD400M diesel pumps were installed to handle the 160 MGD
peak flow. Each pump would push
approximately 11.5 MGD through
24-inch HDPE suction tubes and
18-inch discharge tubes and into
an 8-foot square, concrete manhole structure.
To accommodate the 2,400-foot
distance from the suction point to
the discharge location, the bypass
utilized 30,000 feet of piping that
Xylem shipped in from its rental

locations up and down the East
coast. A dozen factory-trained and
-certified fusion technicians, some
from as far away as California,
operated fusion machines in four
different staging areas. Working
non-stop for a week, the teams
fused together 50-foot pieces of
pipe into 500-foot sections that
were then moved into place along
the right-of-way.
As the piping was set, the other
nine pumps were installed. An
additional CD400M pump was
also available onsite as a backup
option, offering peace of mind to
the Memphis officials and allowing
them to focus on replacing the
damaged sewer main.
In addition to the primary bypass, Xylem installed a separate
36-inch bypass line to handle 11
MGD of flow and ensure minimal impact on the structure.
This bypass utilized two Godwin
hydraulically driven CD300M
pumps and one backup pump - all
run by diesel power packs located
100 feet away, behind a berm, for
flood protection and to prevent
environmental contamination. The
discharge piping consisted of two
18-inch HDPE pipes that ran for
2,400 feet to the same discharge
structure as the primary bypass.

lem switched over to 24/7 bypass
operating mode. Two teams of
onsite mechanics worked around
the clock, alternating shifts to operate, monitor, service and repair
the pumps, and turn them on and
off as flow fluctuated. The bypass
system worked exactly as planned,
pumping approximately 60 to 160
MGD of raw sewage.
"Xylem was able to marshal the
equipment, the pumps and whatever else was needed and get the
job done - plus they had people
who knew how to utilize those
resources," said Paul Patterson,
environmental engineering administrator, City of Memphis. "One of
the benefits of the turnkey solution is that it allowed the city to
focus our resources and our efforts
entirely on design and construction, and getting the pipe replaced.
And that was key."
The fact that Memphis had an
emergency preparedness contingency plan in place enabled city
officials to respond without delay
when severe weather hit, minimizing environmental impact and ensuring regulatory compliance from
the damaged sewer line.

Crisis averted

Godwin Pumps,
856-467-3636, www.godwinpumps.com

Once the pumps were online, Xy-

FOR MORE INFORMATION:
Xylem
914-323-5700, xylem.com

Underground Construction January 2018


http://www.xylem.com http://www.godwinpumps.com http://www.ucononline.com

Underground Construction - January 2018

Table of Contents for the Digital Edition of Underground Construction - January 2018

Underground Construction - January 2018
Contents
Editor’s Log
Newsline
Washington Watch
Pipeline Projects
Utility & Communications Construction Outlook
Will Oil Production, Natural Gas Price Upticks Lead to Pipeline Growth?
U.s. Pipeline Infrastructure Continues Forward Momentum
Plca Members Experience Construction Rebound
Making Pipe Dream a Reality
Dca President Mykyte Sees Progress on Workforce, Oq Issues
The Uncertainty of Working Underground
Contingency Planning Invaluable During Historic Rainfall in Memphis
Jeff Tinlin
Rehab Product Focus
Rehab New Products
Business
New Products
New Products
Equipment Spotlight
Equipment Spotlight
Business Cards
Calendar of Events
Sales Reps
Ad Index
Underground Construction - January 2018 - Underground Construction - January 2018
Underground Construction - January 2018 - IFC
Underground Construction - January 2018 - Contents
Underground Construction - January 2018 - Editor’s Log
Underground Construction - January 2018 - 3
Underground Construction - January 2018 - Newsline
Underground Construction - January 2018 - 5
Underground Construction - January 2018 - 6
Underground Construction - January 2018 - 7
Underground Construction - January 2018 - Washington Watch
Underground Construction - January 2018 - Pipeline Projects
Underground Construction - January 2018 - Utility & Communications Construction Outlook
Underground Construction - January 2018 - 11
Underground Construction - January 2018 - 12
Underground Construction - January 2018 - 13
Underground Construction - January 2018 - Will Oil Production, Natural Gas Price Upticks Lead to Pipeline Growth?
Underground Construction - January 2018 - 15
Underground Construction - January 2018 - U.s. Pipeline Infrastructure Continues Forward Momentum
Underground Construction - January 2018 - 17
Underground Construction - January 2018 - 18
Underground Construction - January 2018 - 19
Underground Construction - January 2018 - 20
Underground Construction - January 2018 - 21
Underground Construction - January 2018 - Plca Members Experience Construction Rebound
Underground Construction - January 2018 - 23
Underground Construction - January 2018 - Making Pipe Dream a Reality
Underground Construction - January 2018 - 25
Underground Construction - January 2018 - 26
Underground Construction - January 2018 - 27
Underground Construction - January 2018 - Dca President Mykyte Sees Progress on Workforce, Oq Issues
Underground Construction - January 2018 - 29
Underground Construction - January 2018 - 30
Underground Construction - January 2018 - 31
Underground Construction - January 2018 - The Uncertainty of Working Underground
Underground Construction - January 2018 - 33
Underground Construction - January 2018 - Contingency Planning Invaluable During Historic Rainfall in Memphis
Underground Construction - January 2018 - 35
Underground Construction - January 2018 - Jeff Tinlin
Underground Construction - January 2018 - 37
Underground Construction - January 2018 - 38
Underground Construction - January 2018 - 39
Underground Construction - January 2018 - 40
Underground Construction - January 2018 - Rehab Product Focus
Underground Construction - January 2018 - Rehab New Products
Underground Construction - January 2018 - Business
Underground Construction - January 2018 - 44
Underground Construction - January 2018 - 45
Underground Construction - January 2018 - 46
Underground Construction - January 2018 - 47
Underground Construction - January 2018 - New Products
Underground Construction - January 2018 - 49
Underground Construction - January 2018 - 50
Underground Construction - January 2018 - 51
Underground Construction - January 2018 - Equipment Spotlight
Underground Construction - January 2018 - Business Cards
Underground Construction - January 2018 - 54
Underground Construction - January 2018 - 55
Underground Construction - January 2018 - Ad Index
Underground Construction - January 2018 - IBC
Underground Construction - January 2018 - BC
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-construction-december-2022
https://www.nxtbook.com/gulfenergyinfo/gulfpub/uc_202211
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202210
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202209
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202208
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202207
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202206
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202205
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202204
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202203
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202202
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202201
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202112
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202111
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202110
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202109
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202108
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202107
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202106
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202105
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202104
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202103
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202102
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202101
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202012
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202011
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202010
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202009
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202008
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202007
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202006
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202005
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202004
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202003
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202002
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202001
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201912
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201911
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201910
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201909
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201908
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201907
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201906
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_summer2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201905
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201904
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201903
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_winter2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201902
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201901
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201812
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201811
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201810
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201809
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201808
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201807
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201806
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201805
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201804
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201803
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201802
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201801
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201712
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201711
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201710
https://www.nxtbook.com/nxtbooks/gulfpub/uc_ditchwitch
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201709
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201708
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201707
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201706
https://www.nxtbookmedia.com